La Nueva Romareda stadium, Zaragoza (Ibercaja Romareda)

Location
Zaragoza, Aragon, Spain. See it on the map, in 3D
Stage
Under construction, as of October 26, 2026 (Zaragoza Online). In October 2026 the basements were complete across the venue, the Gol Sur structure and seating finished, the Gol Norte structure finished and the first aluminium facade slats being trialled.
Status
Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
Research as of

Who, what, how much

FieldValueSource
OwnerLa Nueva Romareda S.L.
TypeStadiums
Headline amountEUR 138.5 million (EUR), as of October 14, 2024Ayuntamiento de Zaragoza
What it coversBudget.
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

FieldValueScopeSource
Seats43,184 seats40,769 general, 2,295 hospitality, 120 mediaAyuntamiento de Zaragoza
Levels5 levels above ground, plus 2 basementsstadiumAyuntamiento de Zaragoza
Height31 mtotal height, more thanAyuntamiento de Zaragoza
Built area76,653 m2stadium 52,090, ancillary 5,042, tertiary 19,521Ayuntamiento de Zaragoza
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

AmountWhat it isScopeAs ofSource
€125 MContract valuePhase 1B works (Gol Sur, demolition and rest of the stadium), excl. VATDecember 13, 2024Ayuntamiento de Zaragoza
€139 MBudgetPhase 1B tender budget, excl. VAT (deductible)October 14, 2024Ayuntamiento de Zaragoza
€149 MBudgetwhole project budget at basic design, excl. VAT2024Ayuntamiento de Zaragoza
Amounts, each with its kind and scope

Companies and their roles

CompanyRoleNoteSource
La Nueva Romareda S.L.OwnerAyuntamiento de Zaragoza, Gobierno de Aragón, Real ZaragozaAyuntamiento de Zaragoza
Obrascón Huarte Laín S.A. (OHLA)General contractorUTE with Altuna y Uria and OHLA Servicios IngesanAyuntamiento de Zaragoza
Altuna y Uria S.A.General contractorUTE memberAyuntamiento de Zaragoza
OHLA Servicios Ingesan S.A.General contractorUTE memberAyuntamiento de Zaragoza
IDOM Consulting, Engineering, Architecture S.A.U.Architectintegrated design, project management and works directionIDOM
UTE OHLA, Deltapunt 3000Contractor, one lotPhase 1A demolition and Gol Sur basement, 3.1 millionAyuntamiento de Zaragoza
Companies and public bodies named by a source, each with its role

Milestones

DateMilestoneSource
July 8, 2024Phase 1A demolitions beginAyuntamiento de Zaragoza
December 13, 2024Phase 1B awarded to OHLA and Altuna y UriaAyuntamiento de Zaragoza
February 2025New Gol Sur construction startsAyuntamiento de Zaragoza
July 2025Demolition and construction of the rest of the stadium startsAyuntamiento de Zaragoza
October 26, 2026Basements done, both goal-end structures finished, facade trialZaragoza Online
June 2027 (planned)End of Phase 1B worksAyuntamiento de Zaragoza
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

Zaragoza is rebuilding La Romareda as a 43,184-seat stadium for Real Zaragoza and the 2030 World Cup, designed by IDOM, with a roof covering every seat and a double-skin facade of aluminium slats. La Nueva Romareda, a company of the city, the Aragón government and the club, awarded the main works to a joint venture of OHLA and Altuna y Uria for 124.5 million euros excluding VAT. Works began with the Gol Sur in February 2025 and are due to end in June 2027.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.