Reviewed record
Loja bypass: Loja-A-92 section
- Location
- Loja, Granada, Andalusia, Spain. See it on the map, in 3D
- Stage
- Under construction, as of February 2026 (Ceacop (citing Granada Hoy)). Awarded in December 2024; in February 2026 Valle del Genil was described as the last section of the bypass where machines had not yet entered, so Loja-A-92 was already under works.
- Status
- Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
- Research as of
Who, what, how much
| Field | Value | Source |
|---|---|---|
| Owner | Adif Alta Velocidad | |
| Type | Rail | |
| Amount | Not found in the sources consulted |
The works in figures
Each figure as its source states it, with its scope. Where two sources disagree, both are listed.
| Field | Value | Scope | Source |
|---|---|---|---|
| Length | 6.3 km | section | La Moncloa (Ministry of Transport) |
| Share tunnel viaduct | 50 % | section | Ahora Granada (Ministry press release) |
Cost, contracts and financing
A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| €149 M | Contract value | award, VAT included | December 30, 2024 | Ahora Granada (Ministry press release) |
| €123 M | Contract value | award as reported in 2026, apparently excluding VAT | February 24, 2026 | Ceacop (citing Granada Hoy) |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Adif Alta Velocidad | Owner | Ahora Granada (Ministry press release) | |
| Copisa | General contractor | UTE member, share not found | Ceacop (citing Granada Hoy) |
| Copasa | General contractor | UTE member, share not found | Ceacop (citing Granada Hoy) |
| CHM | General contractor | UTE member, share not found | Ceacop (citing Granada Hoy) |
| Tunelan | General contractor | UTE member, share not found | Ceacop (citing Granada Hoy) |
Milestones
| Date | Milestone | Source |
|---|---|---|
| December 30, 2024 | Works awarded for EUR 148.7 million including VAT | Ahora Granada (Ministry press release) |
| February 2026 | Section under works (all bypass sections under works) | Ceacop (citing Granada Hoy) |
About the project
The Loja-A-92 section is 6.3 km of the Loja bypass on the Antequera-Granada high-speed line, south of Loja and the A-92, half of it in tunnel or on viaduct. Its main structure is the Manzanil viaduct, 1.7 km long with 33 spans and piers up to 65 m high. It was awarded in December 2024 for EUR 148.7 million including VAT to a joint venture of Copisa, Copasa, CHM and Tunelan.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.
Sources
- El Gobierno adjudica por 148,7 millones de euros la construcción de un nuevo tramo de la Variante de Loja, Ahora Granada (Ministry press release) (press), 30 Dec 2024. Consulted 26 Nov 2026.
- AVE Madrid-Granada: Variante de Loja, La Moncloa (Ministry of Transport) (government), 21 Feb 2025. Consulted 26 Nov 2026.
- La Variante de Loja, al completo en obras: Adif inicia los trabajos en el tramo del Valle del Genil, Ceacop (citing Granada Hoy) (press), 24 Feb 2026. Consulted 26 Nov 2026.
- Variante de Loja-A-92, Forbes España (press), 2025. Consulted 26 Nov 2026.