New Hospital of Málaga (Hospital Virgen de la Esperanza)
- Location
- Málaga, Andalusia, Spain. See it on the map, in 3D
- Stage
- Under construction, as of November 23, 2026 (COPE). The first stone was laid on 2 February 2026; on 23 November 2026 the first phase (the car park) was 30% complete.
- Status
- Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
- Research as of
Who, what, how much
| Field | Value | Source |
|---|---|---|
| Owner | Servicio Andaluz de Salud (Junta de Andalucía) | |
| Type | Hospitals | |
| Headline amount | EUR 607.5 million (EUR), as of May 16, 2025 | Servicio Andaluz de Salud |
| What it covers | Budget. |
The works in figures
Each figure as its source states it, with its scope. Where two sources disagree, both are listed.
| Field | Value | Scope | Source |
|---|---|---|---|
| Built area | 270,300 m2 | 197,600 hospital and 73,600 car park | Sener |
| Rooms | 815 rooms | individual inpatient rooms | Forbes España |
| Operating theatres | 48 theatres | hospital | Forbes España |
| Icu beds | 80 beds | ICU | Forbes España |
| Parking | 1,797 spaces | total; the phase 1 car park adds 839 | COPE |
Cost, contracts and financing
A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| €543 M | Contract value | award incl. VAT (449.06 million excl. VAT); hospital works plus car park concession | November 13, 2025 | Forbes España |
| €608 M | Budget | tender budget incl. 21% VAT (502,079,283.08 excl. VAT), spread 2026 to 2032 | May 16, 2025 | Servicio Andaluz de Salud |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Servicio Andaluz de Salud (Junta de Andalucía) | Owner | Servicio Andaluz de Salud | |
| Construcciones Sánchez Domínguez-Sando S.A.U. | General contractor | UTE member; also car park concessionaire | Servicio Andaluz de Salud |
| Obrascón Huarte Laín S.A. (OHLA) | General contractor | UTE member | Servicio Andaluz de Salud |
| Vialterra Infraestructuras S.A. | General contractor | UTE member | Servicio Andaluz de Salud |
| Estudio Lamela | Architect | UTE Malaka NHM with AIDHOS Arquitec, Sener and ARCS (construction project) | Sener |
| AIDHOS Arquitec | Architect | hospital architecture | Sener |
| Sener | Engineer | construction project | Sener |
| ARCS Estudios y Servicios | Engineer | construction project | Sener |
Milestones
| Date | Milestone | Source |
|---|---|---|
| May 14, 2025 | Tender file opened by the SAS | Servicio Andaluz de Salud |
| February 2, 2026 | First stone laid | Forbes España |
| November 23, 2026 | Phase 1 (car park) 30% complete | COPE |
About the project
The Andalusian Health Service is building a new hospital, Virgen de la Esperanza, on the site of Málaga's Hospital Civil: four towers of 15 floors with 815 rooms, 48 operating theatres and about 1,800 parking spaces. A joint venture of Sando, OHLA and Vialterra won the mixed works and car park concession contract for 543.36 million euros including VAT. Works began in February 2026 with the car park; the whole job runs 75 months in two phases.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.
Sources
- Aprobación del expediente de contratación mixta de las obras del nuevo hospital de Málaga (CC 0003/2025), Servicio Andaluz de Salud (owner), 16 May 2025. Consulted 26 Nov 2026.
- Informe técnico sobre los criterios evaluables de forma no automática (CC 0003/2025), Servicio Andaluz de Salud (owner), 2025. Consulted 26 Nov 2026.
- OHLA, Sando Construcción y Vialterra inician las obras del nuevo hospital de Málaga Virgen de la Esperanza, Forbes España (press), 2 Feb 2026. Consulted 26 Nov 2026.
- Vamos a duplicar las camas de UCI: el Hospital Virgen de la Esperanza alcanza el 30% de su primera fase en Málaga, COPE (press), 23 Nov 2026. Consulted 26 Nov 2026.
- SENER, AIDHOS, Estudio Lamela, and ARCS will carry out the construction project for a new hospital in Malaga, Sener (company), 19 Oct 2022. Consulted 26 Nov 2026.
- Así será el Nuevo Hospital de Málaga: torres de 15 plantas, helipuerto, gran plaza con conexión al Metro, El Español (press), 25 May 2025. Consulted 26 Nov 2026.