Reviewed record
Salto de Chira pumped-storage hydroelectric plant
- Location
- Mogán and San Bartolomé de Tirajana, Gran Canaria, Canary Islands, Spain. See it on the map, in 3D
- Stage
- Under construction, as of April 1, 2025 (Smartgridsinfo). In early 2025 the desalination plant and the 220 kV line were finished, the two work tunnels had been connected (January 2025) and the underground works, more than 90% of the project, were under way; completion is planned for 2027.
- Status
- Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
- Research as of
Who, what, how much
| Field | Value | Source |
|---|---|---|
| Owner | Red Eléctrica de España S.A.U. (Redeia) | |
| Type | Dams and hydro | |
| Headline amount | EUR 589 million (EUR), as of January 17, 2025 | Red Eléctrica |
| What it covers | Budget. |
The works in figures
Each figure as its source states it, with its scope. Where two sources disagree, both are listed.
| Field | Value | Scope | Source |
|---|---|---|---|
| Turbine power | 200 MW | turbine mode (220 MW pumping) | Boletín Oficial de Canarias |
| Storage | 3.5 GWh | energy storage | Smartgridsinfo |
| Gross head | 357.23 m | maximum between the reservoirs | Boletín Oficial de Canarias |
| Units | 6 reversible Francis units of 33.3 MW (36.7 MW pumping) | powerhouse | Boletín Oficial de Canarias |
| Desalination capacity | 2.7 hm3/year | seawater reverse osmosis plant | Boletín Oficial de Canarias |
| Water pipeline | 19.11 km | desalinated water pipeline along the Barranco de Arguineguín | Boletín Oficial de Canarias |
Cost, contracts and financing
A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| €589 M | Budget | project budget, co-financed by ERDF | January 17, 2025 | Red Eléctrica |
| €300 M | Loan | EIB loan approved October 2024 | October 2024 | Smartgridsinfo |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Red Eléctrica de España S.A.U. (Redeia) | Owner | builds and will operate the plant as system operator | Red Eléctrica |
| Dragados | General contractor | named among the construction companies | Red Eléctrica |
| Cobra Infraestructuras Hidráulicas | General contractor | named among the construction companies | Red Eléctrica |
| Obras Subterráneas (Ossa) | General contractor | named among the construction companies | Red Eléctrica |
| Sacyr | General contractor | named among the construction companies | Red Eléctrica |
| Sener | Engineer | construction engineering for the Dragados, Cobra and Ossa consortium | Sener |
| European Investment Bank | Lender | Red Eléctrica |
Milestones
| Date | Milestone | Source |
|---|---|---|
| December 23, 2021 | Canary government grants administrative authorisation (BOC) | Boletín Oficial de Canarias |
| January 2025 | Main (Las Filipinas) and secondary (Soria dam) access tunnels connected; desalination plant finished | Red Eléctrica |
| March 28, 2025 | Visit of the minister and the EIB president | Red Eléctrica |
| 2027 (planned) | Commissioning | Red Eléctrica |
About the project
Red Eléctrica is building a 200 MW pumped-storage plant in the south of Gran Canaria, moving water between the existing Chira and Soria reservoirs, 357 m apart in height, through six reversible turbines in an underground cavern. A seawater desalination plant on the coast supplies the water. Dragados, Cobra, Obras Subterráneas and Sacyr build it; the budget is 589 million euros and commissioning is planned for 2027.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.
Sources
- Nota de prensa: visita del Cabildo a las obras de Salto de Chira, Red Eléctrica (owner), 17 Jan 2025. Consulted 26 Nov 2026.
- Sara Aagesen y Nadia Calviño visitan las obras de la central hidroeléctrica de Salto de Chira, Red Eléctrica (owner), 28 Mar 2025. Consulted 26 Nov 2026.
- Avanzan las obras de la central hidroeléctrica de bombeo reversible Salto de Chira, Smartgridsinfo (press), 1 Apr 2025. Consulted 26 Nov 2026.
- Sener tasked with engineering the 200 MW Salto de Chira hydroelectric plant in Gran Canaria, Sener (company). Consulted 26 Nov 2026.
- BOC 2021/261, anuncio 5313: autorización administrativa y declaración de utilidad pública, Central Hidroeléctrica de Bombeo Chira-Soria (Modificado II), Boletín Oficial de Canarias (government), 23 Dec 2021. Consulted 26 Nov 2026.
- Central hidroeléctrica reversible Soria-Chira en Gran Canaria (folleto), Red Eléctrica (owner). Consulted 26 Nov 2026.