CONSTRUCTION INTELLIGENCE / STEEL AND REBAR

Steel and rebar takeoff, extracted from the structural set

Send us a structural set from a live bid. Mirage agents return steel members by shape, length and weight, miscellaneous metals by type and rebar by size and mark, with every quantity traced back to the sheet it came from. We return it within a week, and you keep the output.

Built on the takeoff agents in production at OCBM and John Cockerill.Mirage Metrics builds and operates AI agents for general contractors, infrastructure contractors and EPC teams. They work with Procore, Autodesk Construction Cloud, SharePoint and email.

THE REALITY

Every member listed by shape and length, then weighed. Every bar read mark by mark against the details. And when a framing plan and its schedule disagree, someone has to notice before the bid goes out.

WHAT MIRAGE DOES

Reads the set the way a steel or rebar estimator reads it

Reads plans, schedules, details and notes together

Framing plans, sections, connection and reinforcement details, member and bar schedules and the general notes, read together. A column mark is matched to its schedule line, a bar mark to the bar schedule. Scanned or vector PDF, DWG or IFC, imperial or metric, with no template to set up.

Every quantity carries its source

Each line names the sheet, the mark and the schedule or detail it came from. Where two sources disagree, such as a framing plan and an elevation, or a bar schedule and the drawn spacing, the line comes back flagged for a person to decide instead of picking one.

Exports for the estimating system you already run

Structured export to Excel or CSV, laid out for import into your estimating software. You keep your labor rates, your material pricing and your historical job cost data. Mirage replaces the measuring, counting and weighing in front of them.

STRUCTURAL STEEL

Structural steel: members, weights and connections as drawn

Members
Beams, girders, columns, braces, girts and purlins by shape and size, in the designation the drawings use (W, HSS, channel, angle, or IPE profiles on a metric set), with the length of each member and the sheet it is on.
Weights
Weight per member from the section tables the drawings reference, AISC or the standard the general notes name, and plates from their drawn dimensions, summed by shape, by grade, by level or by area.
Schedules against plans
Column and beam schedules read against the framing plans and elevations: a mark missing from the schedule, or a size that differs between two sheets, is flagged.
Plates and bolts
Base plates, cap plates, stiffeners, gussets and bolts counted where the connection details draw them, each with its detail reference.

Mirage does not detail or design steel. Where a connection is left to the fabricator's engineer, or a size is left open, the line says so and carries no weight: Mirage does not size a plate or pick a section the drawings do not give.

MISCELLANEOUS METALS

Miscellaneous metals: stairs, rails, lintels, embeds

Stairs and ladders
Stairs, landings and ladders by type from the plans, sections and stair details, with the detail each one refers to.
Rails
Handrails and guardrails measured along the stair and the slab edge as drawn, by type, with posts where the details show them.
Lintels, embeds and frames
Loose lintels, embed plates, frames and supports by mark, from the schedule or the details, with the sheet each one is drawn on.

REBAR

Rebar: bars by size, mark, length and weight

Bars from the schedules
Bars by size, mark, shape, length and count from the bar schedules, ASTM #3 to #18, CSA 10M to 55M or metric bars, as the drawings state them.
Weights by element
Weight per bar size from the standard bar tables, summed by element (footings, walls, slabs, columns, beams) or by pour, the way you bid it.
Details against schedules
Reinforcement details and sections read against the bar schedule: a mark on a detail missing from the schedule, or a bar count the drawn spacing does not give, is flagged.
Laps, hooks and bends
As the drawings or the lap schedule give them. Where laps are left to the code, your detailer or your estimating software applies them, as today.

Mirage does not produce placing drawings or fabrication bar lists: that stays with your detailer. It gives the estimator a takeoff to price.

See the rebar weight calculator

Every line is tied to its mark and its sheet. On a revision, Mirage runs the new set against the previous one and returns which members, plates, bars and items changed, on which sheets, instead of a full takeoff to compare by hand.

THE OUTPUT

Two lines flagged before they become change orders

An illustrative example of the takeoff format, not client data: eight lines from a structural set, two of them flagged at bid rather than found in the shop or on site.

ItemQtyUnitWeight (lb)SheetRefFlag
Beam, W16x26, A992312LF8,112S-201Beam schedule S-501None
Column, W12x40, A992168LF6,720S-201, S-301Column schedule S-500None
Brace, HSS6x6x3/8↳ Framing plan S-201 calls the brace HSS6x6x3/8; elevation 2/S-302 calls it HSS6x6x1/2. Mirage does not choose: the weight waits for the engineer's answer.96LFNot computedS-201, S-302Elevation 2/S-302Size conflict
Base plate, PL 1" x 14" x 14"18EA1,000S-401Detail 3/S-401None
Loose lintel, L4x4x3/822LF216A-301Lintel schedule A-601None
Pipe rail, 1-1/2" Schedule 40, stair 264LF174A-501Detail 5/A-501None
Rebar #5, grade 60, mark W5-11,240LF1,293S-101Bar schedule S-102None
Rebar #4, grade 60, mark F4-2↳ The bar schedule lists 12 bars of mark F4-2; the footing detail's spacing over the drawn footing length gives 14. The estimator decides which governs before the tonnage is priced.14EANot computedS-103Bar schedule S-102Count conflict

PROOF

Takeoff already running in production

No structural steel or rebar takeoff deployment with a published result yet. At John Cockerill, a structural steel module is built on the same engine as the piping takeoff and is rolling out; the published figures below are piping's. At OCBM, takeoff runs on building plan sets.

OCBM

3 agents in production

100% of quantities linked to a source plan

Quantity takeoff feeding bid pricing

See the case study

John Cockerill

80 to 90% less time spent on piping takeoff

10x faster bill of materials for fabrication

Structural steel module rolling out on the same platform

See the case study

COMPARISON

Against the steel estimating software you are probably evaluating

We publish this because you are going to build the table anyway. Each cell says what the vendor's own page says. Where a competitor is better for your situation, that is in the table too.

MirageSteelFloTekla PowerFabSTRUMIS EstimatingaSa Estimating
What it isA takeoff layer in front of your estimating systemAI steel estimating for structural fabricatorsFabrication management suite: estimating, purchasing, nesting, inventory, production controlEnquiry and steel estimating software, standaloneRebar takeoff and estimating from printed or electronic plans
ScopeStructural steel, miscellaneous metals and rebarBeams, columns, braces, HSS, angles, plates, cold-formed framing and connections; lintels and support steelSteel fabricationSteelwork fabricationReinforcing bars: varying bars, ties, stirrups, spirals
TakeoffReads plans, schedules, details and general notes togetherAI finds each member on the PDF; your estimator verifiesModel-based, or manual inputImports 3D models and Excel or Word lists; manual entryEntered from the plans; common structure types calculated automatically
Section and material dataThe section and bar tables the drawings reference4,700+ shapes across six standardsDatabase of supplier pricing and delivery detailsDefault libraries of pricing methods and material specificationsLengths and weights calculated as you enter
Output and laborExcel or CSV for your estimating system; labor stays yoursCSV bill of materials, cut list, nesting order sheet, priced estimateEstimate in the same suite as nesting and purchasingLabour at a rate per tonne or hours per tonnePriced material reports; installation man-hours
Files it readsPDF, DWG, IFC and scansPDF, scanned and raster sets includedNot stated on its product pageModels from Tekla Structures and SDS2; Excel and WordPrinted or electronic plans; formats not named
Published pricingStarting prices: from $10,000 to launch, then from $1,000 a monthYes: free tier, then $399, $599 or from $1,499 a monthNoNoNo

Where they beat us

  • Fabricators who want estimating in the system that runs nesting, purchasing, inventory and production: Tekla PowerFab and STRUMIS do that, we do not.
  • STRUMIS imports a detailed model from Tekla Structures or SDS2 when one exists.
  • SteelFlo publishes its price, has a free tier and reads scanned sets: for a shop pricing steel members from PDFs, it costs less to start than a Mirage pilot.
  • aSa Estimating calculates ties, galloping stirrups and spirals as you enter them, with installation man-hours.

Where we are the answer

  • Contractors who take off steel, miscellaneous metals and rebar from one set and price them in the estimating system they already run.
  • Scanned, mixed-format or hand-marked sets, in imperial or metric.
  • Jobs where framing plans, schedules, details and general notes do not agree.
  • Teams that bid the piping or MEP scope on the same set.

PRICING

What it costs

Pilot on one live bid

Fixed fee, scoped to sheet count and to the steel, metals and rebar in scope. A first usable takeoff a week after the first meeting, with the flagged conflicts and a working session with the engineers who ran it. The first workflow is in production in 4 to 6 weeks.

Production deployment

Annual, priced by bid volume, not per user, from $1,000 a month. Includes the export mapped to the import format of your estimating system.

What moves the number

How many sheets, whether the set is vector or scanned, and which system the output has to be formatted for.

What we tell you on the first call

Whether your sets are a fit. Some are not. A set where member sizes and connections are left to a delegated design leaves little to take off, and we will say so rather than sell you a pilot that fails. Mirage publishes no accuracy figure for steel or rebar takeoff: you get a real one on your own drawings during the pilot.

Send us a structural set from a live bid

Not a sample, not a sanitized demo file: a set you are actually bidding. We run it, return the takeoff with the flags within a week, and walk you through what the agents found and what they missed. The output is yours whether or not we work together.

Attach a structural plan set (recommended)

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy

How a deployment runs: Observe, Map, Build, Run, Expand. See the method

FAQ

Questions steel and rebar estimators ask

  • No. Mirage does the takeoff and hands structured quantities to whatever you price in. You keep your labor rates, your material pricing and your historical job cost data. A fabricator who prices structural members only, and wants pricing in the same tool, may be better served by one of them; the comparison on this page says where.

  • No. Mirage does not detail or design steel or rebar. It reports what the drawings state. Where a connection is left to the fabricator's engineer, a size is left open or a lap is left to the code, the line says so and carries no invented weight.

  • From the length of each member and the section tables the drawings reference: AISC shapes on a US set, or the standard named in the general notes. Plates are weighed from their drawn dimensions. Weights are summed by shape, grade, level or area, the way you price.

  • Yes. Bars by size, mark, shape, length and count from the bar schedules, checked against the reinforcement details, with the weight per bar size from the standard bar tables, summed by element or by pour.

  • Stairs, ladders, handrails and guardrails, lintels, embeds and frames are counted by type and mark from the plans, sections and details, each with the detail it refers to. Rail is measured along the stair and the slab edge as drawn.

  • Both. Mirage reads plan sets in imperial or metric units, and documents in English or French. Members keep the designation the drawings use, whether a W shape or an IPE profile, and bars keep theirs, from #3 to #18 or 10M to 55M.

  • Mirage publishes no accuracy figure for steel or rebar takeoff. Vector sets with complete schedules read best; scanned or heavily marked-up sets read less well, and the confidence flags show exactly where. You get a real number on your own drawings during the pilot.

  • Every line carries its sheet, its mark and the schedule or detail it came from. A tonnage you cannot trace is a tonnage you cannot defend to a project manager.

  • Mirage runs the new set against the previous one and returns the delta: which members, plates, bars and items changed, on which sheets. You do not re-run the full takeoff because a beam was upsized.

  • PDF, DWG and IFC, including mixed-format sets and scanned sheets in a single pass.

  • The proof of concept produces a first usable takeoff on one set from a live bid, a week after the first meeting. The first workflow is in production in 4 to 6 weeks, once you have seen that output.

  • A fixed-fee pilot on one live bid, then an annual subscription for production, priced by bid volume, not per user: from $10,000 to launch, then from $1,000 a month. We scope it on the first call, once we have seen your sets.