CONSTRUCTION INTELLIGENCE / EARTHWORK AND SITEWORK

Earthwork takeoff, extracted from the civil set

Mirage reads grading plans, profiles, cross sections and utility details, and returns cut and fill by station, grading and topsoil areas and trench lengths by depth, each line traced to its sheet. Send five sheets from a live bid and the takeoff comes back in 24 hours.

Built on the takeoff agents in production at OCBM and John Cockerill.Mirage Metrics builds and operates AI agents for general contractors, infrastructure contractors and EPC teams. They work with Procore, Autodesk Construction Cloud, SharePoint and email.

THE REALITY

Every cross section read for its end areas, every interval cubed, every trench run split by depth. And when a cross section's table and the section drawn beside it disagree, someone has to notice before the yards are priced.

WHAT MIRAGE DOES

Reads the set the way a sitework estimator reads it

Reads plans, profiles and cross sections together

Grading and drainage plans, plan and profile sheets, cross sections, typical sections, utility and structure details and the earthwork tables, read together. A station on the profile is matched to its cross section, a pipe run to its inverts and its trench detail. Scanned or vector PDF or DWG, imperial or metric.

Every quantity carries its source

Each line names the sheet, the station range and the section, profile or detail it came from. Where two sources disagree, such as a tabulated end area and the drawn section, or an invert on the plan and on the profile, the line comes back flagged for a person to decide.

Exports for the estimating system you already run

Structured export to Excel or CSV, by station range, material class, depth band or pay item, laid out for import into your estimating software. You keep your production rates, your haul analysis and your shrink and swell factors. Mirage replaces the reading and measuring in front of them.

CUT AND FILL

Cut and fill: end areas and volumes, station by station

End areas from the sections
Cut and fill areas read at each cross section, by the classes the sections show: excavation, unsuitable material, embankment. Where the sheet tabulates them, as FDOT's Design Manual asks on each cross section sheet (216.4.1), the table is checked against the drawn section.
Volumes between stations
Volumes between consecutive sections by the average end area method, (A1 + A2) / 2 x L, divided by 27 for cubic yards (FDOT Design Manual, 216.4). Bridge spans and large culverts where no earthwork is placed are left out of the intervals.
Balance by station range
Cut and fill summed by station range and kept apart. The balance needs a shrink or swell factor from your soils report or your records: WYDOT's Road Design Manual (3-03) calls such factors subjective.
Where a ground model takes over
Surface-to-surface volumes from a digital terrain model, and the haul built on them, stay in your earthwork software. Mirage takes off what the 2D set shows and checks it against the plan's own tables.

See the cut and fill calculator

GRADING AND SITE PREPARATION

Grading, clearing and topsoil: areas and depths as drawn

Clearing and stripping
Clearing limits and topsoil strip by area, at the depth the notes or the geotechnical report give, with stockpile and respread where the plans show them.
Grading
Rough and fine grading by area within the limits of work, from the grading plan, with pads and building platforms at their finished elevations.
Subgrade and base courses
Subgrade preparation, aggregate base and pavement layers by area and thickness from the typical sections, over the stations each one covers.
Structure excavation
Excavation and backfill for footings, manholes, inlets and headwalls, from their details and schedules, counted by type.

TRENCHING

Trenching: lengths by depth, from the profiles

Lengths by depth band
Each pipe run measured structure to structure, its depth taken from the ground line and the inverts on the profile, and its length split into the depth bands you price.
Trench section
Width, bedding and backfill zones as the trench detail draws them, so excavation, bedding stone and select backfill come out as separate quantities.
Structures
Manholes, inlets and cleanouts counted from the structure schedule and checked against the plan and the profile, each with its rim and invert elevations.
Protective systems
OSHA requires one unless the excavation is entirely in stable rock, or under 5 feet deep and a competent person finds no sign of a cave-in (29 CFR 1926.652(a)(1)). The depth bands show which runs cross that line; the system stays your call.

Mirage does not design trench protection, size pipe or set grades. It reports what the drawings state and flags what they leave open.

Every line is tied to its station range and its sheet. On a revision, Mirage runs the new set against the previous one and returns which sections, runs and areas changed, on which sheets, instead of a full takeoff to compare by hand.

THE OUTPUT

Two lines flagged before the yards are priced

An illustrative example of the takeoff format, not client data: eight lines from a civil set, two of them flagged at bid rather than found in the field.

ItemQtyUnitSheetRefFlag
Topsoil strip, 6" over 152,000 SF2,815CYC-201Grading plan, note 3None
Roadway excavation, Sta 10+00 to 14+00 and 15+00 to 22+004,860CYC-401 to C-412Cross section tablesNone
Roadway excavation, Sta 14+00 to 15+00↳ The table on C-405 gives a cut end area of 182 SF at Sta 14+50; the section drawn on the same sheet measures 128 SF. Over the two 50 ft intervals either side, that is about 100 CY of cut, so the volume waits for the designer's answer.Not computedCYC-405Section at Sta 14+50End area conflict
Embankment, Sta 10+00 to 22+003,950CYC-401 to C-412Cross section tablesNone
Storm trench, 18" RCP, depth 0 to 5 ft420LFC-502Profile; trench detail 2/C-601None
Storm trench, 18" RCP, depth 5 to 10 ft310LFC-502Profile; trench detail 2/C-601None
Sanitary trench, 8" PVC, MH-3 to MH-4, depth band not set↳ Plan C-301 labels the MH-4 invert 742.10; profile C-503 shows 740.10. With the ground at 746.0, that is 3.9 ft or 5.9 ft to the invert: the depth band, and whether the run needs a protective system, wait for the engineer.180LFC-301, C-503Plan C-301; profile C-503Invert conflict
Manhole, 48", MH-1 to MH-66EAC-503Structure schedule C-603None

Download this sample (CSV)

What goes in, what comes out

Who uses it
Estimators at sitework, civil and utility contractors, and general contractors pricing their site package.
What goes in
The civil set: existing conditions and grading plans, plan and profile sheets, cross sections, typical sections, utility and structure details and schedules, and the geotechnical notes. PDF or DWG, vector or scanned.
What comes out
Cut and fill by station and material, grading and topsoil areas, trench lengths by depth band and structure counts, each line with its sheet, in Excel or CSV, grouped by your pay items or cost codes. In MasterFormat's 2018 numbering, that is 31 22 00 Grading, 31 23 16 Excavation, 31 23 23 Fill and 31 23 33 Trenching and Backfilling.
Where a person decides
Every flagged conflict, the shrink and swell factors, the haul and the price.
What Mirage does not do
Build a surface model from survey data, design grades or trench protection, or prepare machine control files.

PROOF

Takeoff already running in production

No earthwork takeoff deployment with published figures yet. The nearest: Rouandi, a civil engineering firm, runs one estimating workflow in production; OCBM and John Cockerill run takeoff on building and piping drawings.

Rouandi

1 estimating workflow in production

Every output reviewed by the team before use

5+ team members trained

See the case study

OCBM

3 agents in production

100% of quantities traceable to a source drawing

Quantity takeoff feeding bid pricing

See the case study

John Cockerill

80 to 90% less time spent on piping takeoff

10x faster fabrication bill of materials

3 engineering modules on one platform

See the case study

PRICING

What it costs

Pilot on one live bid

Fixed fee, scoped to sheet count and to the earthwork, grading and trenching in scope. A first usable takeoff a week after the first meeting, with the flagged conflicts and a working session with the engineers who ran it. The first workflow is in production in 4 to 6 weeks.

Production deployment

Annual, priced by bid volume, not per user, from $1,000 a month. Includes the export mapped to the import format of your estimating system.

What moves the number

How many sheets, whether the set is vector or scanned, and which system the output has to be formatted for.

What we tell you on the first call

Whether your sets are a fit. A civil set with no cross sections, where the quantities must come from a surface model, is a job for your earthwork software, and we will say so. Mirage publishes no accuracy figure for earthwork takeoff: you get a real one on your own drawings during the pilot.

Send us a civil set from a live bid

Not a sample, not a sanitized demo file: a set you are actually bidding. Five sheets come back taken off in 24 hours, a full set within a week, with the flags and a walk through what the agents found and what they missed. The output is yours whether or not we work together.

Attach a civil plan set (recommended)

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy

How a deployment runs: Observe, Map, Build, Run, Expand. See the method

FAQ

Questions sitework estimators ask

  • Cut and fill volumes by station and material, clearing, topsoil and grading areas, structure excavation, and trench lengths by depth with their bedding and backfill. Each line carries its sheet and the section, profile or detail it came from.

  • By the average end area method: the cut or fill areas of two consecutive cross sections, averaged, times the distance between them, divided by 27 for cubic yards. FDOT's Design Manual (216.4) states that method for earthwork quantities. WYDOT's Road Design Manual (3-03) notes it is exact only when the two areas are equal, and that closer sections improve it.

  • No. Surface-to-surface volumes from a ground model, and the haul analysis built on them, stay in your earthwork software. Mirage takes off what the 2D civil set shows (plans, profiles, cross sections and details) and checks the totals against the plan's own tabulations.

  • Only the factor you give it. A bank yard and a compacted yard are not the same volume, so cut and fill are reported separately and balanced with the factor from your soils report or your own records. WYDOT's Road Design Manual calls such factors subjective: they are your call.

  • Yes. Each run is measured structure to structure, its depth taken from the ground line and the inverts on the profile, and split into the depth bands you price. Width, bedding and backfill follow the trench detail. The protective system stays with your competent person and your engineer.

  • Yes. Where the cross section sheets tabulate end areas and volumes, Mirage reads the table, recomputes the volumes from the end areas and checks each area against the section drawn on the sheet. A table and a section that disagree come back flagged.

  • Both. Mirage reads plan sets in imperial or metric units, and documents in English or French. Stations read as 12+50 in feet or 1+250 in metres, and volumes come out in cubic yards or cubic metres.

  • Mirage publishes no accuracy figure for earthwork takeoff. Vector sets with clear sections and tabulations read best; scanned or heavily marked-up sets read less well, and the confidence flags show exactly where. You get a real number on your own drawings during the pilot.

  • Mirage runs the new set against the previous one and returns the delta: which sections, runs and areas changed, on which sheets. A profile grade that moves shows up as a list of moved quantities, not a fresh measure.

  • PDF, DWG and IFC, including mixed-format sets and scanned sheets in a single pass.

  • Send five sheets from a live bid and the takeoff comes back in 24 hours. On a pilot, the proof of concept produces a first usable takeoff on one set a week after the first meeting, and the first workflow is in production in 4 to 6 weeks.

  • A fixed-fee pilot on one live bid, then an annual subscription for production, priced by bid volume, not per user: from $10,000 to launch, then from $1,000 a month. We scope it on the first call, once we have seen your sets.