CONSTRUCTION INTELLIGENCE / CONCRETE

Concrete takeoff, extracted from the structural set

Mirage reads foundation plans, framing plans, sections and schedules, and returns concrete volumes by element, formwork contact area and the reinforcement that goes with them, each line traced to its sheet. Send five sheets from a live bid and the takeoff comes back in 24 hours.

Built on the takeoff agents in production at OCBM and John Cockerill.Mirage Metrics builds and operates AI agents for general contractors, infrastructure contractors and EPC teams. They work with Procore, Autodesk Construction Cloud, SharePoint and email.

THE REALITY

Every footing, wall and slab measured, cubed, then measured again for its forms. And when a general note and a section disagree on a thickness, someone has to catch it before the yards are priced.

WHAT MIRAGE DOES

Reads the set the way a concrete estimator reads it

Reads plans, sections, schedules and notes together

Foundation and framing plans, wall and slab sections, footing, column and beam schedules and the general notes, read together. A footing mark is matched to its schedule line, a slab thickness to the note or section that sets it. Scanned or vector PDF, DWG or IFC, imperial or metric.

Every quantity carries its source

Each line names the sheet, the mark and the schedule, section or note it came from. Where two sources disagree, such as a schedule and a plan count, or a general note and a section, the line comes back flagged for a person to decide.

Exports for the estimating system you already run

Structured export to Excel or CSV, grouped by element, level, pour or cost code, laid out for import into your estimating software. You keep your crew rates, your concrete and form pricing and your waste factors. Mirage replaces the measuring and cubing in front of them.

CONCRETE

Concrete: volumes by element, mix and pour

Foundations
Spread and continuous footings, pile caps, grade beams and piers by mark, from the foundation plan and the footing schedule, with the size of each and the sheet it is on.
Walls and columns
Foundation and retaining walls by thickness and height, measured along the plan. Columns by mark from the column schedule, with their heights from the sections.
Slabs and beams
Slabs on grade and elevated slabs by thickness and area, with thickened edges and depressions where the sections draw them. Beams measured below the slab, so nothing is counted twice.
Mix and grouping
Each volume carries the strength the general notes or the schedule give it, 4,000 psi on a US set or 30 MPa on a metric one. Grouped by element, by level, or by pour where the drawings show pour breaks.

Volumes are net of what the drawings show. Waste, overpour and your rule for small openings stay in your estimating system.

See the concrete volume calculator

FORMWORK

Formwork: contact area, face by face

Contact area
The face of form in contact with concrete, in square feet (SFCA) or square metres: both faces of a wall, a column's perimeter times its height, a beam's sides and soffit, a slab's edges and soffit.
What is not formed
Faces cast against earth, or left open like the top of a footing or a slab on grade, carry no contact area. Where a detail says earth formed, the line follows it.
By element, size and height
Contact area grouped by element, size and height, so wall forms, column forms and slab edges each come out as their own lines.
Openings and bulkheads
Openings, blockouts and bulkheads at construction joints counted where the drawings show them, each with its sheet.

Mirage measures the forms the concrete needs. It does not design formwork, choose a system or plan reuse: that stays with your formwork engineer and your estimator.

REINFORCEMENT

Reinforcement, on the same pass

Bars by element
Bars by size, mark and length from the bar schedules and the reinforcement details, weighed from the standard bar tables and summed by footing, wall, slab, column or pour.
Schedules against details
A mark on a detail missing from the bar schedule, or a count the drawn spacing does not give, comes back flagged for a person to decide before the tonnage is priced.

The rebar scope in full, laps and bends included, is on the steel and rebar takeoff page.

See steel and rebar takeoffSee the rebar weight calculator

Every line is tied to its mark and its sheet. On a revision, Mirage runs the new set against the previous one and returns which footings, walls, slabs and bars changed, on which sheets, instead of a full takeoff to compare by hand.

THE OUTPUT

Two lines flagged before the yards are priced

An illustrative example of the takeoff format, not client data: eight lines from a structural set, two of them flagged at bid rather than found at the pour.

ItemConcrete (CY)Formwork (SFCA)SheetRefFlag
Spread footing F1, 6'-0" x 6'-0" x 1'-6", 12 EA24.0432S-101Footing schedule S-501None
Continuous footing CF1, 2'-0" x 1'-0", 386 LF28.6772S-101Detail 4/S-401None
Foundation wall W1, 12" x 10'-0" high, 240 LF88.94,800S-101, S-301Section 1/S-301None
Slab on grade, 12,400 SF↳ General note 7 gives a 5" slab on grade; section 2/S-301 draws 6". Over 12,400 SF that is 191.4 or 229.6 CY, so the volume waits for the engineer's answer.Not computedNot computedS-102General note 7/S-001; section 2/S-301Thickness conflict
Column C1, 18" x 18" x 12'-0", 16 EA16.01,152S-102Column schedule S-502None
Column C2, 24" round x 14'-0"↳ The column schedule lists 8 C2 columns; plan S-102 tags 9. At 1.63 CY each that is 13.0 or 14.7 CY, and the estimator decides which governs before it is priced.Not computedNot computedS-102Column schedule S-502Count conflict
Elevated slab, 8", 6,200 SF, 320 LF of edge153.16,413S-201Slab schedule S-503None
Beam B1, 16" wide, 16" below the slab, 180 LF11.9720S-201Beam schedule S-504None

Download this sample (CSV)

What goes in, what comes out

Who uses it
Estimators at general contractors and concrete subcontractors pricing foundations, structure and site concrete.
What goes in
The structural set: foundation and framing plans, sections and details, schedules and general notes, and the concrete specification where it sets the mix. PDF, DWG or IFC, vector or scanned.
What comes out
Concrete volumes, formwork contact area and reinforcement by size and weight, each line with its sheet and source, in Excel or CSV, grouped by your cost codes. In MasterFormat's 2018 numbering, that is 03 11 00 Concrete Forming, 03 21 00 Reinforcement Bars and 03 31 00 Structural Concrete.
Where a person decides
Every flagged conflict (a thickness, a count, a size that differs between two sheets), the waste factor and the price.
What Mirage does not do
Design or check the structure, design formwork, or produce placing drawings and fabrication bar lists.

PROOF

Takeoff already running in production

No concrete takeoff deployment with published figures yet. The nearest: at OCBM, a builder working every trade from structural concrete to finishing, the takeoff agent runs on its own formwork and structural drawings; John Cockerill's figures are for piping takeoff.

OCBM

3 agents in production

100% of quantities traceable to a source drawing

Takeoff on formwork and structural drawings

See the case study

John Cockerill

80 to 90% less time spent on piping takeoff

10x faster fabrication bill of materials

3 engineering modules on one platform

See the case study

PRICING

What it costs

Pilot on one live bid

Fixed fee, scoped to sheet count and to the concrete, formwork and reinforcement in scope. A first usable takeoff a week after the first meeting, with the flagged conflicts and a working session with the engineers who ran it. The first workflow is in production in 4 to 6 weeks.

Production deployment

Annual, priced by bid volume, not per user, from $1,000 a month. Includes the export mapped to the import format of your estimating system.

What moves the number

How many sheets, whether the set is vector or scanned, and which system the output has to be formatted for.

What we tell you on the first call

Whether your sets are a fit. A set issued before the foundations are designed leaves little to take off, and we will say so rather than sell you a pilot that fails. Mirage publishes no accuracy figure for concrete takeoff: you get a real one on your own drawings during the pilot.

Send us a structural set from a live bid

Not a sample, not a sanitized demo file: a set you are actually bidding. Five sheets come back taken off in 24 hours, a full set within a week, with the flags and a walk through what the agents found and what they missed. The output is yours whether or not we work together.

Attach a structural plan set (recommended)

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy

How a deployment runs: Observe, Map, Build, Run, Expand. See the method

FAQ

Questions concrete estimators ask

  • Concrete volumes by element (footings, walls, columns, slabs and beams), the formwork contact area each element needs and the reinforcement that goes in it. Each line carries its sheet and the schedule, section or note it came from. Mirage returns all three from one pass over the structural set.

  • From the dimensions the drawings give: lengths and areas from the plans, thicknesses and depths from the sections and schedules, heights from the sections. A cubic yard is 27 cubic feet; a metric set comes out in cubic metres. Beams are measured below the slab, so the overlap is not counted twice.

  • No. Volumes are net of what the drawings show. Waste, overpour on footings cast against earth and your rule for deducting small openings are your figures, applied in your estimating system as today.

  • As contact area: the face of form that touches concrete, in square feet or square metres. That is both faces of a wall, the perimeter of a column times its height, the sides and soffit of a beam, the edges and soffit of an elevated slab. Faces cast against earth or left open carry none.

  • Yes, on the same pass: bars by size, mark and length from the bar schedules and details, weighed from the standard bar tables and summed by element or pour. The full rebar scope is described on the steel and rebar takeoff page.

  • Both. Mirage reads plan sets in imperial or metric units, and documents in English or French. Volumes come out in cubic yards or cubic metres, contact area in square feet or square metres, and bars keep the designation the drawings use.

  • Mirage publishes no accuracy figure for concrete takeoff. Vector sets with complete schedules read best; scanned or heavily marked-up sets read less well, and the confidence flags show exactly where. You get a real number on your own drawings during the pilot.

  • Every line carries its sheet, its mark and the schedule, section or note it came from. A yardage you cannot trace is a yardage you cannot defend to a project manager.

  • Mirage runs the new set against the previous one and returns the delta: which footings, walls, slabs and bars changed, on which sheets. You do not re-run the full takeoff because a footing was enlarged.

  • PDF, DWG and IFC, including mixed-format sets and scanned sheets in a single pass.

  • Send five sheets from a live bid and the takeoff comes back in 24 hours. On a pilot, the proof of concept produces a first usable takeoff on one set a week after the first meeting, and the first workflow is in production in 4 to 6 weeks.

  • A fixed-fee pilot on one live bid, then an annual subscription for production, priced by bid volume, not per user: from $10,000 to launch, then from $1,000 a month. We scope it on the first call, once we have seen your sets.