CONSTRUCTION INTELLIGENCE / INTERIOR FINISHES

Drywall, flooring and paint takeoff from your plans

Mirage agents read the architectural set and its finish schedules, then return partitions, board, ceilings, flooring, base and paint by type and room, each quantity traced to its sheet. Send five plan sheets and the takeoff comes back within 24 hours, ready for the estimating software you already run.

Built on the takeoff agents in production at OCBM and John Cockerill.Mirage Metrics builds and operates AI agents for general contractors, infrastructure contractors and EPC teams. They work with Procore, Autodesk Construction Cloud, SharePoint and email.

THE REALITY

Every wall measured by type, every room by its finish code, every ceiling at its height. Then a revised finish plan arrives two days before the bid, and the takeoff starts again.

WHAT MIRAGE DOES

Reads the set the way a finishes estimator reads it

Reads plans, schedules and sections together

Floor plans, reflected ceiling plans, the wall type legend, the room finish and door schedules, sections and the specification, read together. A room is matched to its finish codes, a wall to its type. Scanned or vector PDF, DWG or IFC, imperial or metric, with no template to set up.

Every quantity carries its source

Each line names the sheet, the room or wall type and the schedule it came from. Where two sources disagree, such as a finish plan and the finish schedule, or a ceiling plan and a section, the line comes back flagged for a person to decide instead of picking one.

Exports for the estimating system you already run

Structured export to Excel or CSV, laid out for import into your estimating software. You keep your labor rates, your material pricing, your waste factors and your job cost history. Mirage replaces the measuring and counting in front of them.

DRYWALL AND PARTITIONS

Drywall and partitions: wall area by type, board by layer

Partitions by type
Wall area by partition type, from the floor plans and the wall type legend, with the height each type runs to: the ceiling or the deck above.
Board by layer and side
Gypsum board in square feet per layer and per side, by the board type the wall types name: standard, fire rated, moisture or abuse resistant, shaftwall.
Framing
Studs and track in linear feet of wall, by size and gauge where the wall types give them. Headers, blocking and backing where the details draw them.
Openings, bead and joints
Door and window openings from their schedules, deducted by your rule. Corner bead, trim and control joints where the drawings or the specification call for them.

Mirage does not design partitions or pick a stud gauge the drawings leave open. A wall type missing from the legend, or a height that differs between a section and the legend, comes back flagged with both sheets named.

See how openings and waste are handled in a takeoff

CEILINGS

Ceilings: by type and height, from the reflected ceiling plan

Acoustical ceilings
Acoustical tile and grid in square feet by ceiling type, from the reflected ceiling plan, checked against the room finish schedule.
Gypsum ceilings and soffits
Drywall ceilings, soffits and bulkheads in square feet, with their framing and the vertical faces the sections draw.
Heights
Ceiling heights from the reflected ceiling plan, the finish schedule and the sections. A room whose height differs from one to another is flagged.
Trim and access panels
Wall angle and perimeter trim around each room, and access panels counted where the plans show them.

FLOORING

Flooring: area by finish, base by room

Area by finish
Carpet, resilient, tile, wood and sealed or coated concrete, in square feet or square yards, from the finish plans and the room finish schedule.
Base
Base in linear feet by type around each room, with door openings taken out by your rule.
Transitions
Transition strips and thresholds counted at the doorways where the floor finish changes.
Waste and pattern
Measured net. Waste, seams and pattern matching stay in your estimating software, where your factors already are.

PAINT AND WALL FINISHES

Paint and wall finishes: by system and room

Walls by finish code
Wall area per room and per finish code from the room finish schedule: paint systems, wall covering, tile wainscot, wall panels.
Ceilings and exposed structure
Painted ceilings and soffits, and exposed structure where the schedule or the reflected ceiling plan calls for paint.
Doors and frames
Doors and frames to paint, counted from the door schedule by type and finish.
Changes of finish on one wall
An accent wall or a wainscot is measured as its own line, with its own finish code, instead of being folded into the room.

Mirage takes the paint system as the specification states it, primer and coats included, and carries it on the line. It does not choose a system the specification leaves open.

Every line is tied to its room, its type and its sheet. On a revision, Mirage runs the new set against the previous one and returns which walls, ceilings, floors and finishes changed, on which sheets.

THE OUTPUT

Two lines flagged before they become change orders

An illustrative example of the takeoff format, not client data: eight lines from an architectural set, two of them flagged at bid rather than found on site.

ItemQtyUnitSheetRefFlag
Partition P3, 3-5/8" metal studs, one layer of 5/8" Type X each side, to deck1,480SFA-101, A-102Wall types A-501None
Gypsum board, 5/8" Type X, partition P32,960SFA-101, A-102Wall types A-501None
Acoustical ceiling, 2x2 tile on grid, ACT-16,240SFA-201Finish schedule A-601None
Gypsum board ceiling, GWB-1, corridor 210↳ The reflected ceiling plan gives corridor 210 a ceiling at 9'-0"; section 2/A-301 draws it at 8'-6". The ceiling area does not change, but every wall, board and paint height in the corridor does: Mirage names both sheets and does not choose.410SFA-201, A-301RCP A-201Height conflict
Carpet tile, CPT-1694SYA-111Finish schedule A-601None
Resilient base, 4", RB-11,120LFA-111Finish schedule A-601None
Luxury vinyl tile, LVT-2, room 214↳ The finish plan shows LVT-2 in room 214; the room finish schedule lists CPT-1. One question to the architect settles it before the floor is priced.380SFA-111Finish plan A-111Finish conflict
Paint, walls, PT-1, primer and two coats9,850SFA-101, A-102Finish schedule A-601None

What goes in, what comes out

Goes in
The architectural set: floor plans, reflected ceiling plans, the wall type legend, the room finish and door schedules, sections, and the specification sections for the finishes.
Comes out
Quantities by trade, type and room, in square feet, square yards, linear feet or each, with the sheet and schedule behind every line, in Excel or CSV.
Who decides
Your estimator. Every flagged line, every conflict between two sheets and every assumption the drawings leave open goes to a person before it is priced.
How fast
Five plan sheets come back taken off within 24 hours. A full set from a live bid comes back as the proof of concept, a week after the first meeting.
Stays with you
Pricing, labor units and waste factors, in your estimating software. Mirage does not design partitions or choose a finish the drawings leave open.

PROOF

Takeoff already running in production

No interior finishes takeoff deployment is published yet. The closest published work is below: takeoff in production at OCBM, a general contractor working every trade from structural concrete to finishing, on its formwork and structural drawings, and at John Cockerill on piping isometrics.

OCBM

3 agents in production

100% of quantities linked to a source plan

Quantity takeoff feeding bid pricing

See the case study

John Cockerill

80 to 90% less time spent on piping takeoff

10x faster bill of materials for fabrication

Separate MTO and BOM outputs from each isometric

See the case study

PRICING

What it costs

Pilot on one live bid

Fixed fee, scoped to sheet count and to the finishes in scope. A first usable takeoff a week after the first meeting, with the flagged conflicts and a working session with the engineers who ran it. The first workflow is in production in 4 to 6 weeks.

Production deployment

Annual, priced by bid volume, not per user, from $1,000 a month. Includes the export mapped to the import format of your estimating system.

What moves the number

How many sheets, whether the set is vector or scanned, and which system the output has to be formatted for.

What we tell you on the first call

Whether your sets are a fit. Some are not. A set with no finish schedule and no wall types leaves little to take off, and we will say so rather than sell you a pilot that fails. Mirage publishes no accuracy figure for finishes takeoff: you get a real one on your own drawings during the pilot.

Send us an architectural set from a live bid

Not a sample, not a sanitized demo file: a set you are actually bidding. We run it, return the takeoff with the flags, and walk you through what the agents found and what they missed. The output is yours whether or not we work together.

Attach an architectural plan set (recommended)

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy

How a deployment runs: Observe, Map, Build, Run, Expand. See the method

FAQ

Questions finishes estimators ask

  • No. Mirage does the takeoff and hands structured quantities to whatever you price in. You keep your labor rates, your assemblies, your material pricing and your waste factors. Most construction clients keep their estimating stack and put Mirage in front of it.

  • Yes. Each room is matched to its floor, base, wall and ceiling codes in the room finish schedule, and checked against the finish plan. A room whose code differs between the two, or a code missing from the schedule, comes back flagged instead of guessed.

  • Walls are measured by the type the floor plan gives them, from the wall type legend: studs, board layers on each side, insulation. The height comes from the legend and the sections, to the ceiling or to the deck above. Where the two disagree, the line is flagged with both sheets named.

  • By your rule. Openings come from the door and window schedules and are taken out on lines of their own, following the rule your estimate uses, so anyone can see what was deducted and why. Where no rule is stated, the line says so.

  • Whichever you price in. Each floor finish comes back in the unit your estimating system expects, square feet or square yards, and base in linear feet.

  • No. Quantities are measured net. Waste, seams and pattern matching stay in your estimating software, where your factors already are.

  • Both. Mirage reads plan sets in imperial or metric units, and documents in English or French.

  • Mirage publishes no accuracy figure for finishes takeoff. Vector sets with complete schedules read best; scanned or heavily marked-up sets read less well, and the flags show exactly where. You get a real number on your own drawings during the pilot.

  • Mirage runs the new set against the previous one and returns the delta: which walls, ceilings, floors and finishes changed, on which sheets. You do not re-run the full takeoff because a corridor changed finish.

  • PDF, DWG and IFC, including mixed-format sets and scanned sheets in a single pass.

  • Five plan sheets come back taken off within 24 hours. The proof of concept, on a full set from a live bid, comes a week after the first meeting. The first workflow is in production in 4 to 6 weeks.

  • A fixed-fee pilot on one live bid, then an annual subscription for production, priced by bid volume, not per user: from $10,000 to launch, then from $1,000 a month. We scope it on the first call, once we have seen your sets.