Concrete volume calculator: slabs, footings, walls and columns
List the elements you are pouring, from a slab or a footing to a wall or a round column, and get the concrete volume in cubic yards and cubic metres, element by element and in total. Work in feet and inches or in metres and centimetres. Waste is a figure you choose, not one the tool assumes.
Send a plan set, get the quantities
Concrete volumes come from the drawings. Mirage reads plan sets in metric or imperial units and returns each quantity with the drawing it was measured on. At OCBM, three agents are in production and 100% of quantities are tied to a source drawing.
How the volume is calculated
Slab = length × width × thickness
Footing = length × width × depth
Wall = length × height × thickness
Rectangular column = side A × side B × height
Round column = π ÷ 4 × diameter² × height
Every dimension is converted to metres before anything is multiplied, so an element in feet and inches is computed exactly like one in metres. The tool then multiplies by the number of identical elements and adds the elements up.
A slab 20 ft long, 10 ft wide and 4 in thick is 20 × 10 × 4 ÷ 12 = 66.67 ft³, which is 2.47 yd³ (27 ft³ to the cubic yard). In metric, a slab 5 m by 4 m at 15 cm is 5 × 4 × 0.15 = 3 m³. A round column 40 cm across and 3 m high is π ÷ 4 × 0.4² × 3 = 0.377 m³.
An element with a dimension missing is not counted as zero: it is left out of the total and named under the result, so a half-filled list never reads as a finished one.
Cubic yards, cubic metres and cubic feet
The foot is exactly 0.3048 m and the inch exactly 0.0254 m (NIST Special Publication 811, appendix B.9). A cubic yard is therefore (3 × 0.3048)³ = 0.764554857984 m³, and one cubic metre is about 1.308 yd³. A cubic yard holds 27 cubic feet.
Waste, bags and truckloads
How much to add for spillage, uneven subgrade and overbreak depends on the job and the crew, and no standard figure was found to publish here. The waste field is therefore empty: leave it empty for the net volume, or enter your own percentage and the tool adds it to the total.
For premix bags, enter the yield printed on the bag (in cubic feet or litres) and the tool divides the order volume by it and rounds up to whole bags. Ready-mix trucks are not counted: the load a truck carries is set by the supplier and the truck, so ask the plant.
Sources
- NIST Special Publication 811, appendix B.9: foot = 0.3048 m and inch = 0.0254 m, exact; cubic yard = 0.7645549 m³ (rounded).
FAQ
Multiply length by width by thickness, with all three in the same unit. A slab 20 ft by 10 ft and 4 in thick is 20 × 10 × 4 ÷ 12 = 66.67 cubic feet, or 2.47 cubic yards after dividing by 27. In metric, 5 m by 4 m at 15 cm is 5 × 4 × 0.15 = 3 m³.
About 1.308. A cubic yard is exactly 0.764554857984 m³, because the foot is defined as exactly 0.3048 m and a yard is three feet.
The calculator does not assume a figure: no published standard percentage was found, and the right allowance depends on the subgrade, the forms and the crew. Leave the waste field empty to see the net volume, or enter your own percentage from past pours or your supplier's advice.
Enter the yield printed on the bag, in cubic feet or litres. The calculator divides the volume to order by that yield and rounds up to whole bags. It has no yield built in, because yields differ by product and bag size.
Use π ÷ 4 × diameter² × height. A column 40 cm across and 3 m high is π ÷ 4 × 0.4² × 3 = 0.377 m³. Choose "Round column" and enter the diameter and height.
Every quantity, tied to its drawing.
A volume is only as good as the dimensions behind it. See how OCBM's estimators review a takeoff in which every quantity points back to the sheet it came from.
See the OCBM case study