Portal North Bridge
A two-track, high-level fixed-span bridge rising 50 feet over the Hackensack River that replaces the 116-year-old Portal Bridge on the Northeast Corridor, with federal, NJ TRANSIT and Amtrak funding. NJ TRANSIT awarded the $1.56 billion construction contract to the Skanska/Traylor Bros Joint Venture in October 2021, and work to move the final track onto the new bridge began on October 9, 2026. Compiled by Mirage Metrics from the owner's and the companies' own publications.
- Published
- Reading time
- 2 min
- Written by
- Mirage Metrics
Last checked November 9, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#portal-north-bridge.
At a glance
| Field | Value | Source |
|---|---|---|
| Owners | NJ TRANSIT, Amtrak | |
| Location | Hackensack River, New Jersey, United States | |
| Type | Bridge, two-track fixed-span rail bridge | |
| Delivery model | competitive bid (invitation for bid) | |
| Length | 3.9 km | NJ TRANSIT |
| Stage | Construction |
Contracts and teams
Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.
| Contract | Delivery | Team | Members and roles | Status | Date | Source |
|---|---|---|---|---|---|---|
| Portal North Bridge construction contract | competitive bid (invitation for bid) | Skanska/Traylor Bros Joint Venture | awarded | October 2021 | NJ TRANSIT |
Milestones
| Date | Milestone | Source |
|---|---|---|
| October 12, 2021 | NJ TRANSIT announces the $1,559,993,000 construction contract with the Skanska/Traylor Bros Joint Venture | NJ TRANSIT |
| October 9, 2026 | Work begins to transfer the final track from the old Portal Bridge to the new bridge | NJ TRANSIT |
Mirage Metrics and this project
This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.
Projects that share an owner or a team member with this one:
If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.
Estimating a project like this one?
Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing.