Interstate Bridge Replacement Program
The program replaces the Interstate 5 bridges over the Columbia River, between Vancouver, Washington and Portland, Oregon, with a fixed-span, earthquake-resilient multimodal bridge. It also covers I-5 corridor improvements, space for a light rail extension and tolling. The Oregon and Washington State departments of transportation (ODOT and WSDOT) lead it with TriMet, C-TRAN and local partners. WSDOT issued the request for qualifications for the progressive design-build bridge contract on August 17, 2026, with selection planned for mid-2027 and construction from 2028. Compiled by Mirage Metrics from the owner's and the companies' own publications.
- Published
- Reading time
- 2 min
- Written by
- Mirage Metrics
Last checked November 9, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#interstate-bridge-replacement.
At a glance
| Field | Value | Source |
|---|---|---|
| Owners | Oregon Department of Transportation, Washington State Department of Transportation | |
| Location | Vancouver, Washington, and Portland, Oregon, United States | |
| Type | Bridge, fixed-span multimodal bridge | |
| Delivery model | progressive design-build (bridge) | |
| Budget announced | US$5.7 billion, available funding (state contributions, federal grants and future tolling) backing the first construction phase, as of August 2026 | Interstate Bridge Replacement Program |
| Stage | Procurement | |
| Next milestone | 2027: Progressive design-builder selected (mid-2027), with construction to start in 2028 | Interstate Bridge Replacement Program |
Contracts and teams
Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.
| Contract | Delivery | Team | Members and roles | Status | Date | Source |
|---|---|---|---|---|---|---|
| Columbia River Bridge Replacement, administered by WSDOT | progressive design-build | in procurement | August 17, 2026 | Interstate Bridge Replacement Program |
Milestones
| Date | Milestone | Source |
|---|---|---|
| January 16, 2026 | U.S. Coast Guard approval confirmed for the fixed-span bridge with 116 feet of vertical clearance | Interstate Bridge Replacement Program |
| August 17, 2026 | Request for qualifications issued for the bridge's progressive design-builder | Interstate Bridge Replacement Program |
Mirage Metrics and this project
This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.
If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.