LA Metro D Line Subway Extension
An extension of the D Line subway about nine miles west from Wilshire/Western through the Miracle Mile, Beverly Hills, Century City and Westwood to the West LA VA Medical Center, built by LA Metro in three sections. Section 1, with stations at Wilshire/La Brea, Wilshire/Fairfax and Wilshire/La Cienega, opened on May 8, 2026, and Sections 2 and 3 were under construction. Compiled by Mirage Metrics from the owner's and the companies' own publications.
- Published
- Reading time
- 2 min
- Written by
- Mirage Metrics
Last checked November 9, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#la-metro-d-line-extension.
At a glance
| Field | Value | Source |
|---|---|---|
| Owner | Los Angeles County Metropolitan Transportation Authority | |
| Location | Los Angeles, California, United States | |
| Type | Transit, subway | |
| Stage | Construction |
Milestones
| Date | Milestone | Source |
|---|---|---|
| November 7, 2014 | Section 1 groundbreaking | LA Metro |
| February 23, 2018 | Section 2 groundbreaking | LA Metro |
| May 24, 2021 | Section 3 groundbreaking | LA Metro |
| April 2024 | Completion of tunneling announced | LA Metro |
| May 8, 2026 | Section 1 (Wilshire/La Brea, Wilshire/Fairfax, Wilshire/La Cienega) opens | LA Metro |
Mirage Metrics and this project
This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.
Projects that share an owner or a team member with this one:
If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.
Estimating a project like this one?
Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing.