Hazel McCallion Line (Hurontario LRT)
An 18-kilometre light rail line with 19 stops along Hurontario Street from Port Credit GO in Mississauga to the Gateway Terminal in Brampton, delivered under a 30-year DBFOM contract with Mobilinx. Construction began in March 2020, and Metrolinx plans systems installation and integration testing in fiscal 2026-27. Compiled by Mirage Metrics from the owner's and the companies' own publications.
- Published
- Reading time
- 3 min
- Written by
- Mirage Metrics
Last checked November 9, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#hazel-mccallion-line.
At a glance
| Field | Value | Source |
|---|---|---|
| Owners | Metrolinx, Infrastructure Ontario | |
| Location | Mississauga and Brampton, Ontario, Canada | |
| Type | Transit, light rail | |
| Delivery model | P3 (DBFOM) | |
| Budget announced | C$5.5 billion, Metrolinx current baseline less exclusions, in year-of-expenditure dollars; excludes operations, maintenance and lifecycle costs of a parallel contract, as of June 30, 2026 | Metrolinx |
| Length | 18 km | Infrastructure Ontario |
| Stage | Construction | |
| Next milestone | March 2027: Systems installation from Gateway Terminal to Cooksville, vehicle burn-in and system site integration tests completed (expected in fiscal 2026-27) | Metrolinx |
Contracts and teams
Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.
| Contract | Delivery | Team | Members and roles | Status | Date | Source |
|---|---|---|---|---|---|---|
| Hurontario LRT project agreement | DBFOM (design, build, finance, operate and maintain, 30-year term) | Mobilinx Hurontario General Partnership | John Laing Investments Limited (applicant lead), Astaldi Canada Enterprises Inc. (applicant lead, operations and maintenance), Hitachi Rail STS S.p.A. (applicant lead, design), Transdev North America Inc. (applicant lead), Amico Concessions Inc. (applicant lead), Salini Impregilo Canada Holding Inc. (applicant lead), Astaldi Canada Design & Construction Inc. (construction), Hitachi Rail STS Canada Inc. (construction, operations and maintenance), Amico Infrastructures Inc. (construction), Bot Infrastructure Ltd. (construction), Salini Impregilo Civil Works Inc. (construction), IBI Group Professional Services (Canada) Inc. (design), Morrison Hershfield (design), Arcadis Canada Inc. (design), Daoust Lestage Inc. (design), Exp Services Inc. (design), Transdev Services Canada Inc. (operations and maintenance), Salini Impregilo S.p.A. (operations and maintenance), National Bank (financial advisor), HSBC (financial advisor) | awarded | October 21, 2019 | Infrastructure Ontario |
Milestones
| Date | Milestone | Source |
|---|---|---|
| October 18, 2016 | Request for qualifications issued | Infrastructure Ontario |
| August 26, 2019 | Mobilinx selected as preferred proponent | Infrastructure Ontario |
| October 21, 2019 | $4.6 billion DBFOM contract awarded to Mobilinx | Infrastructure Ontario |
| March 13, 2020 | Construction begins | Infrastructure Ontario |
Mirage Metrics and this project
This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.
Projects that share an owner or a team member with this one:
- Eglinton Crosstown LRT (Line 5 Eglinton)
- Eglinton Crosstown West Extension
- Ontario Line
- Yonge North Subway Extension
- Finch West LRT (Line 6 Finch West)
- GO Expansion On-Corridor Works
If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.
Sources and scope
Checked on .
- Infrastructure Ontario, Hazel McCallion Line (Hurontario LRT) project page
- Infrastructure Ontario, Contract Awarded for Hurontario LRT (October 21, 2019)
- Metrolinx, 2026-27 Business Plan (section 7.4)
- Metrolinx, CPG (Rapid Transit) State of the Network, FY 2026/27 Q1 (Board of Directors, item 8.2) (September 10, 2026)
Estimating a project like this one?
Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing.