CTA Red Line Extension

A 5.5-mile extension of the Red Line from the 95th/Dan Ryan terminal to 130th Street on Chicago's Far South Side, with four new accessible stations. The Chicago Transit Board awarded the $2.9 billion design-build contract to Walsh-VINCI Transit Community Partners in August 2024, with construction then expected to be completed by 2030. Compiled by Mirage Metrics from the owner's and the companies' own publications.

Published
Reading time
2 min
Written by
Mirage Metrics

Last checked November 9, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#cta-red-line-extension.

At a glance

CTA Red Line Extension at a glance. Compiled by Mirage Metrics, November 2026
FieldValueSource
OwnerChicago Transit Authority
LocationChicago, Illinois, United States
TypeTransit, rapid transit rail
Delivery modeldesign-build
Budget announcedUS$5.3 billion, overall project budget, including financing expenses, as of August 2024Chicago Transit Authority
Length8.9 kmChicago Transit Authority
StageDevelopment phase
CTA Red Line Extension at a glance. Compiled by Mirage Metrics, November 2026

Contracts and teams

Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.

CTA Red Line Extension: contracts and teams. Compiled by Mirage Metrics, November 2026
ContractDeliveryTeamMembers and rolesStatusDateSource
Red Line Extension Mainline Project (design and construction)design-buildWalsh-VINCI Transit Community PartnersWalsh Construction (team member), VINCI Construction (team member), EXP (team member), Systra (team member)awardedAugust 14, 2024Chicago Transit Authority
CTA Red Line Extension: contracts and teams. Compiled by Mirage Metrics, November 2026

Milestones

CTA Red Line Extension: dated milestones. Compiled by Mirage Metrics, November 2026
DateMilestoneSource
August 14, 2024Chicago Transit Board awards the $2.9 billion design-build contract to Walsh-VINCI Transit Community PartnersChicago Transit Authority
CTA Red Line Extension: dated milestones. Compiled by Mirage Metrics, November 2026

Mirage Metrics and this project

This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.

Projects that share an owner or a team member with this one:

If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.

Estimating a project like this one?

Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy