Hampton Roads Bridge-Tunnel Expansion

A nearly 10-mile expansion of Interstate 64 between Hampton and Norfolk, with twin two-lane bored tunnels under the harbor and the widening of four-lane segments. The Virginia Department of Transportation (VDOT) is delivering it under a design-build contract with Hampton Roads Connector Partners, and the Hampton Roads Transportation Accountability Commission pays for 92% of it. The tunnel boring machine completed both bored tunnels on September 24, 2025, and the project was under construction in November 2026. Compiled by Mirage Metrics from the owner's and the companies' own publications.

Published
Reading time
2 min
Written by
Mirage Metrics

Last checked November 9, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#hampton-roads-bridge-tunnel-expansion.

At a glance

Hampton Roads Bridge-Tunnel Expansion at a glance. Compiled by Mirage Metrics, November 2026
FieldValueSource
OwnerVirginia Department of Transportation
LocationHampton and Norfolk, Virginia, United States
TypeTunnel, twin bored tunnels and marine trestle bridges
Delivery modeldesign-build
Budget announcedUS$3.9 billion, total project cost, as of November 2026Virginia Department of Transportation
StageConstruction
Hampton Roads Bridge-Tunnel Expansion at a glance. Compiled by Mirage Metrics, November 2026

Contracts and teams

Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.

Hampton Roads Bridge-Tunnel Expansion: contracts and teams. Compiled by Mirage Metrics, November 2026
ContractDeliveryTeamMembers and rolesStatusDateSource
HRBT Expansion design-build contractdesign-buildHampton Roads Connector PartnersDragados USA (joint venture partner), Flatiron Construction Corp. (joint venture partner), VINCI Construction (joint venture partner)awarded2019HOCHTIEF
Hampton Roads Bridge-Tunnel Expansion: contracts and teams. Compiled by Mirage Metrics, November 2026

Milestones

Hampton Roads Bridge-Tunnel Expansion: dated milestones. Compiled by Mirage Metrics, November 2026
DateMilestoneSource
2019Hampton Roads Connector Partners selected for the $3.3 billion design-build contractHOCHTIEF
September 24, 2025Tunnel boring machine completes its final breakthrough, delivering both bored tunnelsVirginia Department of Transportation
November 2025South Trestle bridge superstructure opensVirginia Department of Transportation
Hampton Roads Bridge-Tunnel Expansion: dated milestones. Compiled by Mirage Metrics, November 2026

Mirage Metrics and this project

This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.

Projects that share an owner or a team member with this one:

If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.

Estimating a project like this one?

Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy