Valley Line West LRT

A 14-kilometre extension of Edmonton's Valley Line LRT from downtown to Lewis Farms, with 14 street-level stops, 2 elevated stations and a 2.1-kilometre elevated guideway. Marigold Infrastructure Partners is building it for the City of Edmonton. The Province lists an estimated cost of $2.7 billion, and the City expects construction to be complete in 2028, followed by testing before opening. Compiled by Mirage Metrics from the owner's and the companies' own publications.

Published
Updated
Reading time
2 min
Written by
Mirage Metrics

Last checked November 10, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#edmonton-valley-line-west.

At a glance

Valley Line West LRT at a glance. Compiled by Mirage Metrics, November 2026
FieldValueSource
OwnerCity of Edmonton
LocationEdmonton, Alberta, Canada
TypeTransit, light rail
Delivery modeldesign, build and partially finance
Budget announcedC$2.7 billion, estimated costGovernment of Alberta
Length14 kmGovernment of Alberta
StageConstruction
Next milestone2028: Construction anticipated to be complete, followed by testing and commissioning before openingCity of Edmonton
Valley Line West LRT at a glance. Compiled by Mirage Metrics, November 2026

Contracts and teams

Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.

Valley Line West LRT: contracts and teams. Compiled by Mirage Metrics, November 2026
ContractDeliveryTeamMembers and rolesStatusDateSource
Valley Line West (design, build and partial finance)design, build and partially financeMarigold Infrastructure PartnersawardedCity of Edmonton
Valley Line West LRT: contracts and teams. Compiled by Mirage Metrics, November 2026

Milestones

Valley Line West LRT: dated milestones. Compiled by Mirage Metrics, November 2026
DateMilestoneSource
June 2026Contractor progress at 68.7%, as measured by the Independent Certifier (end of June 2026)City of Edmonton
2028Construction anticipated to be complete, followed by testing and commissioning before openingCity of Edmonton
Valley Line West LRT: dated milestones. Compiled by Mirage Metrics, November 2026

Mirage Metrics and this project

This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.

If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.

Estimating a project like this one?

Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy