A 5.7-kilometre extension of the SkyTrain Millennium Line from VCC-Clark to Arbutus Street, mostly in a 5-kilometre tunnel with six underground stations, delivered by the Province's Transportation Investment Corporation under a design-build-finance agreement. The final track was installed in September 2026, and the line is scheduled to open in fall 2027. Compiled by Mirage Metrics from the owner's and the companies' own publications.
- Published
- Reading time
- 2 min
- Written by
- Mirage Metrics
Last checked November 9, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#broadway-subway.
At a glance
| Field | Value | Source |
|---|---|---|
| Owners | Province of British Columbia, Transportation Investment Corporation | |
| Location | Vancouver, British Columbia, Canada | |
| Type | Transit, automated light metro (SkyTrain) | |
| Delivery model | design-build-finance | |
| Budget announced | C$3 billion, approved project budget, as of November 2025 | Broadway Subway Project |
| Length | 5.7 km | Broadway Subway Project |
| Stage | Construction | |
| Next milestone | 2027: Scheduled to open for passenger service in fall 2027 | Government of British Columbia |
Contracts and teams
Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.
| Contract | Delivery | Team | Members and roles | Status | Date | Source |
|---|---|---|---|---|---|---|
| Design-build-finance agreement | design-build-finance | Acciona-Ghella Joint Venture | Acciona Infrastructure Canada Inc. (joint venture partner), Ghella Canada Ltd. (joint venture partner), IBI Group Professional Services (design partner), Dialog BC Architecture Engineering Interior Design Planning Inc. (design partner), Mott MacDonald Canada Ltd. (design partner) | awarded | July 17, 2020 | Government of British Columbia |
Milestones
| Date | Milestone | Source |
|---|---|---|
| July 17, 2020 | Acciona-Ghella Joint Venture chosen as preferred proponent | Government of British Columbia |
| August 2020 | Design-build-finance agreement executed; Broadway Subway Project Corporation is the design-build contractor | Broadway Subway Project |
| September 21, 2026 | Final track installation: all trackwork to be complete that week | Government of British Columbia |
Mirage Metrics and this project
This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.
Projects that share an owner or a team member with this one:
- Eglinton Crosstown West Extension
- Surrey Langley SkyTrain
- Ontario Line
- Yonge North Subway Extension
- Fraser River Tunnel (George Massey Tunnel replacement)
- Pattullo Bridge replacement (stal̕əw̓asəm Bridge)
If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.
Sources and scope
Checked on .
- Government of British Columbia, Broadway Subway Project reaches major milestone with final track installation (September 21, 2026)
- Broadway Subway Project, Monthly Status Report for November 2025 (January 2026)
- Government of British Columbia, Preferred proponent team chosen for Broadway Subway Project (July 17, 2020)