Surrey Langley SkyTrain
A 16-kilometre elevated extension will take the SkyTrain Expo Line along Fraser Highway, from King George station in Surrey to 203 Street in Langley City, with eight stations. The Transportation Investment Corporation is delivering it through separate guideway, stations, and systems and trackwork contracts. Major construction began in November 2024, and the line is anticipated in service in late 2029. Compiled by Mirage Metrics from the owner's and the companies' own publications.
- Published
- Reading time
- 2 min
- Written by
- Mirage Metrics
Last checked November 9, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#surrey-langley-skytrain.
At a glance
| Field | Value | Source |
|---|---|---|
| Owners | Province of British Columbia, Transportation Investment Corporation | |
| Location | Surrey and Langley, British Columbia, Canada | |
| Type | Transit, automated light metro (SkyTrain) | |
| Delivery model | mixed | |
| Budget announced | C$6 billion, approved project budget, as of February 2026 | Surrey Langley SkyTrain Project |
| Length | 16 km | Surrey Langley SkyTrain Project |
| Stage | Construction |
Contracts and teams
Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.
| Contract | Delivery | Team | Members and roles | Status | Date | Source |
|---|---|---|---|---|---|---|
| Guideway | design-build-finance | SkyLink Guideway Partners | Dragados Canada, Inc., Ledcor Investments Inc., Ledcor Mining Ltd. | awarded | Surrey Langley SkyTrain Project | |
| Stations | design-build | South Fraser Station Partners | Aecon Constructors, Acciona Infrastructure Canada Inc., Pomerleau BC Inc. | awarded | Surrey Langley SkyTrain Project | |
| Systems and Trackwork | design-build | Transit Integrators BC | AtkinsRéalis Major Projects Inc., AtkinsRéalis Canada Inc., Western Pacific Enterprises Ltd. | awarded | Surrey Langley SkyTrain Project |
Milestones
| Date | Milestone | Source |
|---|---|---|
| 2024 | Early works start (spring 2024) | Surrey Langley SkyTrain Project |
| November 2024 | Major construction starts | Surrey Langley SkyTrain Project |
| 2029 | Anticipated in service in late 2029 | Surrey Langley SkyTrain Project |
Mirage Metrics and this project
This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.
Projects that share an owner or a team member with this one:
- Eglinton Crosstown West Extension
- Broadway Subway
- Eglinton Crosstown LRT (Line 5 Eglinton)
- Finch West LRT (Line 6 Finch West)
- Ontario Line
- Réseau express métropolitain (REM)
If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.
Sources and scope
Checked on .
Estimating a project like this one?
Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing.