Réseau express métropolitain (REM)
A 67-kilometre automated light metro with 26 stations across Greater Montréal, owned by CDPQ Infra and built under an EPC contract with NouvLR, with rolling stock, systems and operations by Pulsar. Three branches opened between July 2023 and May 2026, and the airport branch is scheduled for 2027. Compiled by Mirage Metrics from the owner's and the companies' own publications.
- Published
- Reading time
- 2 min
- Written by
- Mirage Metrics
Last checked November 9, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#reseau-express-metropolitain.
At a glance
| Field | Value | Source |
|---|---|---|
| Owner | CDPQ Infra | |
| Location | Greater Montréal, Québec, Canada | |
| Type | Transit, automated light metro | |
| Delivery model | EPC and RSSOM contracts | |
| Budget announced | C$8.3 billion, total construction cost, as of 2026 | CDPQ Infra |
| Length | 67 km | CDPQ Infra |
| Stage | Construction | |
| Next milestone | 2027: Airport branch to Montréal-Trudeau International Airport scheduled to open | CDPQ Infra |
Contracts and teams
Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.
| Contract | Delivery | Team | Members and roles | Status | Date | Source |
|---|---|---|---|---|---|---|
| Infrastructure engineering, procurement and construction (EPC) | engineering, procurement and construction | NouvLR | SNC Lavalin Grands Projets Inc. (member), Dragados Canada Inc. (member), Groupe Aecon Québec Ltée (member), Pomerleau Inc. (member), EBC Inc. (member), SNC Lavalin Inc. (participant), Aecom Consultants Inc. (participant) | awarded | February 8, 2018 | CDPQ Infra |
| Rolling stock, systems, operation and maintenance (RSSOM) | rolling stock, systems, operation and maintenance | Groupe des Partenaires pour la Mobilité des Montréalais (now Pulsar) | Alstom Transport Canada Inc. (member), SNC-Lavalin O&M Inc. (member) | awarded | February 8, 2018 | CDPQ Infra |
Milestones
| Date | Milestone | Source |
|---|---|---|
| February 8, 2018 | Winning consortia announced: NouvLR for the EPC contract, PMM for rolling stock, systems, operation and maintenance | CDPQ Infra |
| July 2023 | South Shore branch opens, Brossard to Gare Centrale | CDPQ Infra |
| November 2025 | Deux-Montagnes branch opens, Gare Centrale to Deux-Montagnes | CDPQ Infra |
| May 2026 | Anse-à-l'Orme branch opens, Bois-Franc to Anse-à-l'Orme | CDPQ Infra |
Mirage Metrics and this project
This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.
Projects that share an owner or a team member with this one:
- Eglinton Crosstown LRT (Line 5 Eglinton)
- TramCité (Québec City tramway)
- Eglinton Crosstown West Extension
- Finch West LRT (Line 6 Finch West)
- GO Expansion On-Corridor Works
- Surrey Langley SkyTrain
If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.
Sources and scope
Checked on .
Estimating a project like this one?
Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing.