I-10 Calcasieu River Bridge

An eight-lane Interstate 10 bridge across the Calcasieu River, with three travel lanes and an auxiliary lane in each direction. The project also covers interchange work, tolling and the demolition of the existing bridge. It is delivered for the State of Louisiana as a public-private partnership with Calcasieu Bridge Partners (Plenary Americas, ACCIONA, Sacyr). Financial close was reached on August 15, 2024, with construction then expected to begin in 2026 and finish in 2031. Compiled by Mirage Metrics from the owner's and the companies' own publications.

Published
Reading time
2 min
Written by
Mirage Metrics

Last checked November 9, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#i-10-calcasieu-river-bridge.

At a glance

I-10 Calcasieu River Bridge at a glance. Compiled by Mirage Metrics, November 2026
FieldValueSource
OwnerState of Louisiana
LocationLake Charles, Louisiana, United States
TypeBridge, eight-lane highway bridge
Delivery modelP3 (design-build with 50 years of operations and maintenance)
Budget announcedUS$2.3 billion, total project value, as of August 2024Plenary Americas
StageDevelopment phase
I-10 Calcasieu River Bridge at a glance. Compiled by Mirage Metrics, November 2026

Contracts and teams

Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.

I-10 Calcasieu River Bridge: contracts and teams. Compiled by Mirage Metrics, November 2026
ContractDeliveryTeamMembers and rolesStatusDateSource
I-10 Calcasieu River Bridge public-private partnershipdesign-build with 50 years of operations and maintenanceCalcasieu Bridge PartnersPlenary Americas (lead developer and equity member; operations and maintenance), ACCIONA (equity member; design-build joint venture; operations and maintenance), Sacyr (equity member; design-build joint venture; operations and maintenance), Kapsch (tolling operator)awardedAugust 15, 2024Plenary Americas
I-10 Calcasieu River Bridge: contracts and teams. Compiled by Mirage Metrics, November 2026

Milestones

I-10 Calcasieu River Bridge: dated milestones. Compiled by Mirage Metrics, November 2026
DateMilestoneSource
August 15, 2024Financial close with Calcasieu Bridge Partners: about $1.2 billion from the State during construction and $1.33 billion in tax-exempt private activity bondsPlenary Americas
I-10 Calcasieu River Bridge: dated milestones. Compiled by Mirage Metrics, November 2026

Mirage Metrics and this project

This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.

Projects that share an owner or a team member with this one:

If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.

Estimating a project like this one?

Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy