SR 400 Express Lanes

Sixteen miles of dynamically priced express lanes on State Route 400, from the North Springs MARTA station in Fulton County to McFarland Parkway in Forsyth County, with an enhanced SR 400/I-285 interchange and new bridges. The Georgia Department of Transportation (GDOT) and the State Road and Tollway Authority procured the project as a public-private partnership with SR 400 Peach Partners (ACS Infra, Acciona, Meridiam). It broke ground on April 22, 2026. Compiled by Mirage Metrics from the owner's and the companies' own publications.

Published
Reading time
2 min
Written by
Mirage Metrics

Last checked November 9, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#sr-400-express-lanes.

At a glance

SR 400 Express Lanes at a glance. Compiled by Mirage Metrics, November 2026
FieldValueSource
OwnersGeorgia Department of Transportation, State Road and Tollway Authority
LocationFulton and Forsyth counties, metro Atlanta, Georgia, United States
TypeHighway, managed express lanes
Delivery modelP3
Budget announcedUS$10.8 billion, approximate project value, as of April 2026Flatiron Dragados
Length25.8 kmFlatiron Dragados
StageConstruction
SR 400 Express Lanes at a glance. Compiled by Mirage Metrics, November 2026

Contracts and teams

Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.

SR 400 Express Lanes: contracts and teams. Compiled by Mirage Metrics, November 2026
ContractDeliveryTeamMembers and rolesStatusDateSource
SR 400 Express Lanes concession (5.5-year construction period and 50 years of toll operations)P3SR 400 Peach PartnersACS Infra (IRIDIUM) (consortium member), Acciona (consortium member), Meridiam (consortium member)awardedFlatiron Dragados
Design and constructiondesign-buildFlatironDragados (construction lead), Acciona (construction lead), Parsons (lead design engineer)awardedFlatiron Dragados
SR 400 Express Lanes: contracts and teams. Compiled by Mirage Metrics, November 2026

Milestones

SR 400 Express Lanes: dated milestones. Compiled by Mirage Metrics, November 2026
DateMilestoneSource
April 22, 2026GroundbreakingFlatiron Dragados
SR 400 Express Lanes: dated milestones. Compiled by Mirage Metrics, November 2026

Mirage Metrics and this project

This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.

Projects that share an owner or a team member with this one:

If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.

Estimating a project like this one?

Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy