Gordie Howe International Bridge

A six-lane, 2.5-kilometre cable-stayed bridge over the Detroit River between Windsor and Detroit, with an 853-metre main span and a port of entry on each side, delivered by the Windsor-Detroit Bridge Authority as a P3 with Bridging North America. It opened to traffic on July 27, 2026. Compiled by Mirage Metrics from the owner's and the companies' own publications.

Published
Updated
Reading time
2 min
Written by
Mirage Metrics

Last checked November 10, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#gordie-howe-international-bridge.

At a glance

Gordie Howe International Bridge at a glance. Compiled by Mirage Metrics, November 2026
FieldValueSource
OwnerWindsor-Detroit Bridge Authority
LocationWindsor, Ontario, Canada, and Detroit, Michigan, United States
TypeBridge, cable-stayed bridge
Delivery modelP3 (DBFOM)
Budget announcedC$5.7 billion, fixed-price DBFOM contract, nominal value (design-build and 30-year operation, maintenance and rehabilitation), as of September 2018Aecon
Length2.5 kmGovernment of Canada (Housing and Infrastructure)
StageCompleted
Gordie Howe International Bridge at a glance. Compiled by Mirage Metrics, November 2026

Contracts and teams

Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.

Gordie Howe International Bridge: contracts and teams. Compiled by Mirage Metrics, November 2026
ContractDeliveryTeamMembers and rolesStatusDateSource
Gordie Howe International Bridge project agreementdesign-build-finance-operate-maintain (30-year operation, maintenance and rehabilitation phase)Bridging North AmericaAecon (20% interest in the equity, design-build and operations partnerships), ACS Infrastructure Canada Inc., Fluor Canada Ltd.awardedSeptember 28, 2018Aecon
Gordie Howe International Bridge: contracts and teams. Compiled by Mirage Metrics, November 2026

Milestones

Gordie Howe International Bridge: dated milestones. Compiled by Mirage Metrics, November 2026
DateMilestoneSource
September 28, 2018Financial close: $5.7 billion fixed-price contract with Bridging North AmericaAecon
July 27, 2026Bridge opens to trafficOffice of the Governor of Michigan
Gordie Howe International Bridge: dated milestones. Compiled by Mirage Metrics, November 2026

Mirage Metrics and this project

This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.

Projects that share an owner or a team member with this one:

If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.

Estimating a project like this one?

Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy