Gordie Howe International Bridge
A six-lane, 2.5-kilometre cable-stayed bridge over the Detroit River between Windsor and Detroit, with an 853-metre main span and a port of entry on each side, delivered by the Windsor-Detroit Bridge Authority as a P3 with Bridging North America. It opened to traffic on July 27, 2026. Compiled by Mirage Metrics from the owner's and the companies' own publications.
- Published
- Updated
- Reading time
- 2 min
- Written by
- Mirage Metrics
Last checked November 10, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#gordie-howe-international-bridge.
At a glance
| Field | Value | Source |
|---|---|---|
| Owner | Windsor-Detroit Bridge Authority | |
| Location | Windsor, Ontario, Canada, and Detroit, Michigan, United States | |
| Type | Bridge, cable-stayed bridge | |
| Delivery model | P3 (DBFOM) | |
| Budget announced | C$5.7 billion, fixed-price DBFOM contract, nominal value (design-build and 30-year operation, maintenance and rehabilitation), as of September 2018 | Aecon |
| Length | 2.5 km | Government of Canada (Housing and Infrastructure) |
| Stage | Completed |
Contracts and teams
Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.
| Contract | Delivery | Team | Members and roles | Status | Date | Source |
|---|---|---|---|---|---|---|
| Gordie Howe International Bridge project agreement | design-build-finance-operate-maintain (30-year operation, maintenance and rehabilitation phase) | Bridging North America | Aecon (20% interest in the equity, design-build and operations partnerships), ACS Infrastructure Canada Inc., Fluor Canada Ltd. | awarded | September 28, 2018 | Aecon |
Milestones
| Date | Milestone | Source |
|---|---|---|
| September 28, 2018 | Financial close: $5.7 billion fixed-price contract with Bridging North America | Aecon |
| July 27, 2026 | Bridge opens to traffic | Office of the Governor of Michigan |
Mirage Metrics and this project
This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.
Projects that share an owner or a team member with this one:
- Eglinton Crosstown LRT (Line 5 Eglinton)
- Finch West LRT (Line 6 Finch West)
- GO Expansion On-Corridor Works
If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.
Sources and scope
Checked on .
- Government of Canada (Housing and Infrastructure), The Gordie Howe International Bridge will open on July 27th (July 10, 2026)
- Aecon, Aecon consortium reaches financial close on Gordie Howe International Bridge project (September 28, 2018)
- Office of the Governor of Michigan, First drive across the Gordie Howe International Bridge marks official opening to traffic (July 27, 2026)
Estimating a project like this one?
Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing.