Research record, fact-checked
PowerHouse Reno
- Location
- NV, United States. Site address: 600 Britain Drive, McCarran, NV (Industrial GID, Storey County), with 3275 Waltham Way on the adjoining parcel. See it on the map, in 3D
- Stage
- Under construction (PowerHouse Data Centers). PowerHouse's own news page reports the groundbreaking on the first of three buildings; the campus is scheduled to finish construction in 2028.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Owners and developers | PowerHouse Data Centers, Harrison Street | |
| Type | Leased hyperscale campuses | |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 200 MW | Capacity, its measure not stated by the source | Whole campus | PowerHouse Data Centers | |
| 65 MW | Capacity, its measure not stated by the source | Whole campus | PowerHouse Data Centers |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Site area | 49 acres | Whole campus | PowerHouse Data Centers |
| Buildings, in all | Up to 3 | Whole campus | PowerHouse Data Centers |
| Floor area | 900,000 sq ft | Whole campus | PowerHouse Data Centers |
| Stories | 2 | One building | PowerHouse Data Centers |
| Floor area of one building | 300,000 sq ft | One building | PowerHouse Data Centers |
| Substation capacity | dedicated on-site substation connected to the NV Energy grid | Whole campus | PowerHouse Data Centers |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| PowerHouse Data Centers | Developer | PowerHouse Data Centers | |
| HITT Contracting | General contractor | PowerHouse Data Centers | |
| F&P Construction | Site preparation | Site work and mass grading. | PowerHouse Data Centers |
| Tectonics Design Group | Design | Site design and building layout on the campus's rocky terrain. | PowerHouse Data Centers |
| Harrison Street | Joint venture partner | PowerHouse Data Centers | |
| NV Energy | Energy partner | PowerHouse Data Centers |
Milestones
| Date | Milestone | Source |
|---|---|---|
| undefined NaN, 2024 | Construction and delivery window planned by PowerHouse | PowerHouse Data Centers |
| 2028 | PowerHouse Data Centers |
About the campus
PowerHouse Reno is PowerHouse Data Centers' campus of three two-story buildings, 900,000 square feet on 49 acres, at the junction of Britain Drive and Waltham Way in the Tahoe Reno Industrial Center, Storey County, Nevada. HITT Contracting is the general contractor and F&P Construction the site work and grading contractor. PowerHouse has broken ground on the first building, and the campus is scheduled to finish construction in 2028.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- PowerHouse Reno, PowerHouse Data Centers. Consulted 19 Nov 2026.
- PowerHouse joins data center rush in region, PowerHouse Data Centers. Consulted 20 Nov 2026.
- PowerHouse Data Centers expands into Reno, NV, PowerHouse Data Centers. Consulted 20 Nov 2026.
- PowerHouse breaks ground on Reno data center, PowerHouse Data Centers. Consulted 20 Nov 2026.
- PowerHouse Reno, American Real Estate Partners. Consulted 20 Nov 2026.
- Contact, PowerHouse Data Centers. Consulted 20 Nov 2026.
- Parcel 005-041-66, tax year 2026, Storey County Assessor. Consulted 20 Nov 2026.
- Parcel 005-041-67, tax year 2026, Storey County Assessor. Consulted 20 Nov 2026.