Research record, fact-checked
Prime SMF02, Sacramento
- Location
- Sacramento, CA, United States. Site address: 2407 Ak Street, McClellan Business Park, Sacramento County, California. See it on the map, in 3D
- Stage
- Under construction, as of May 2026 (Prime Data Centers). Prime's own press release announces the groundbreaking of SMF02
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Developer | Prime Data Centers | |
| Type | Leased hyperscale campuses | |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 18 MW, planned | IT capacity (power for the computing equipment) | One building | May 2026 | Prime Data Centers |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Floor area of one building | 150,000 sq ft | One building | Prime Data Centers |
| Site area | 8.64 acres | Whole campus | Prime Data Centers |
| Buildings, in all | 2 | Whole campus | Prime Data Centers |
| Buildings delivered | 1 | Whole campus | Prime Data Centers |
| Substation capacity | on-site substation | Whole campus | Prime Data Centers |
| Site area | About 7.74 acres | One phase | Sacramento County (CEQAnet) |
| Floor area of one building | 110,269 sq ft | One building | Sacramento County (CEQAnet) |
| Stories | 2 | One building | Sacramento County (CEQAnet) |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Prime Data Centers | Developer | Prime Data Centers | |
| Clune Construction | General contractor | Prime Data Centers | |
| Sacramento Municipal Utility District (SMUD) | Energy partner | Prime Data Centers |
Milestones
| Date | Milestone | Source |
|---|---|---|
| February 5, 2026 | Sacramento County approves the data center expansion at 2407 Ak Street (Notice of Determination) | Sacramento County (CEQAnet) |
| May 7, 2026 | Prime breaks ground on SMF02 | Prime Data Centers |
About the campus
SMF02 is the second Prime Data Centers building on its Sacramento, California campus, which already includes the operational SMF01 facility. Prime broke ground on SMF02 on May 7, 2026, a 150,000 square foot building delivering 18MW of critical IT load capacity, built by general contractor Clune Construction and expected to support about 250 construction jobs and 30 permanent positions.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Prime Data Centers Breaks Ground on Second Sacramento Data Center, Expanding Regional Campus Footprint, Prime Data Centers, 7 May 2026. Consulted 19 Nov 2026.
- Sacramento Data Centers (location page), Prime Data Centers. Consulted 20 Nov 2026.
- Prime Data Centers, Notice of Determination (SCH 1996122010), Sacramento County (CEQAnet), 25 Feb 2026. Consulted 20 Nov 2026.