Research record, fact-checked

STACK PHX01, Avondale

Location
Avondale, Maricopa County, AZ, United States. See it on the map, in 3D
Stage
Stage not confirmed: Not found in the sources consulted. STACK's own pages describe the campus but give no dated construction status.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
DeveloperSTACK Infrastructure
TypeLeased hyperscale campuses
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
225 MWCapacity, its measure not stated by the sourceWhole campusSTACK Infrastructure
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Site area100 acresWhole campusSTACK Infrastructure
Site area79 acresWhole campusSTACK Infrastructure
Buildings, in all3Whole campusSTACK Infrastructure
Floor area1,784,000 sq ftWhole campusSTACK Infrastructure
Floor area of one building724,000 sq ftOne buildingSTACK Infrastructure
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
STACK InfrastructureDeveloperSTACK Infrastructure
Companies named by the operator, the developer, a filing or a government, each with its role

General contractor: Not found in the sources consulted.

About the campus

PHX01 is a STACK Infrastructure data center campus in Avondale, Arizona, which STACK describes as providing 225 MW of critical capacity on about 100 acres. STACK's pages give no dated construction status.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.