Research record, fact-checked
EdgeCore Reno Data Center Campus
- Location
- NV, United States. Site address: 3000 USA Parkway, McCarran, NV 89434. See it on the map, in 3D
- Stage
- Under construction, as of May 2025 (EdgeCore Digital Infrastructure). EdgeCore stated in July 2024 that it was building an on-site substation and three data centers in Reno, and in May 2025 that tradespeople were constructing data centers at its Reno campus with Holder Construction.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Developer | EdgeCore Digital Infrastructure | |
| Type | Hyperscale, self-built | EdgeCore Digital Infrastructure |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 216 MW | IT capacity (power for the computing equipment) | Whole campus | November 2026 | EdgeCore Digital Infrastructure |
| More than 400 MW, planned | Capacity, its measure not stated by the source | Whole campus, 2023 announcement (superseded) | August 2023 | EdgeCore Digital Infrastructure |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Buildings, in all | 3 | Whole campus | EdgeCore Digital Infrastructure |
| Floor area | Nearly 1,000,000 sq ft | Whole campus | EdgeCore Digital Infrastructure |
| Site area | 56 acres | Whole campus | EdgeCore Digital Infrastructure |
| Cooling | Ultra-efficient close-looped chilled water system, air-cooled design, capable of air-cooled and direct-to-chip liquid cooling | Whole campus | EdgeCore Digital Infrastructure |
| Water | WUE rating below .01 L/kWh | Whole campus | EdgeCore Digital Infrastructure |
| Substation capacity | on-site substation under construction (2024) | Whole campus | EdgeCore Digital Infrastructure |
| Buildings under construction | 3 | Whole campus | Storey County |
| Floor area | About 900,000 sq ft | Whole campus | Storey County |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| EdgeCore Digital Infrastructure | Developer | EdgeCore Digital Infrastructure | |
| Holder Construction | General contractor | EdgeCore's construction partner at its Reno campus, among four campuses. | EdgeCore Digital Infrastructure |
Milestones
| Date | Milestone | Source |
|---|---|---|
| August 10, 2023 (planned) | EdgeCore announces development of the Reno campus after purchasing 136 acres | EdgeCore Digital Infrastructure |
| July 18, 2024 | EdgeCore states it is constructing an on-site substation and three data centers in Reno, completion expected as early as 2026 | EdgeCore Digital Infrastructure |
About the campus
EdgeCore Digital Infrastructure is building a three-building campus of nearly 1 million square feet and 216 MW of critical IT load on 56 acres in the Tahoe-Reno Industrial Center, Nevada, with an on-site substation. EdgeCore said in July 2024 that the substation and the three data centers were under construction, with completion as early as 2026, and named Holder Construction as its construction partner at the Reno campus in May 2025.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Reno Data Centers, EdgeCore Digital Infrastructure. Consulted 19 Nov 2026.
- EdgeCore Digital Infrastructure Announces Development of Reno, Nevada Data Center Campus, EdgeCore Digital Infrastructure, 10 Aug 2023. Consulted 19 Nov 2026.
- EdgeCore Digital Infrastructure Celebrates Construction Safety Week in Recognition of its Corporate Commitment to Ensuring Workforce Safety, EdgeCore Digital Infrastructure, 8 May 2025. Consulted 20 Nov 2026.
- Reno: The AI Boom's Emerging Western Hub, EdgeCore Digital Infrastructure, 18 Jul 2024. Consulted 20 Nov 2026.
- Notice of Proposed Action, Class II Air Quality Operating Permit AP7374-4772 (FIN A2652), MECP1 Reno 1, LLC, Nevada Division of Environmental Protection, Bureau of Air Pollution Control, 26 Jan 2026. Consulted 20 Nov 2026.
- Introducing Storey County Business Spotlight: EdgeCore Digital Infrastructure, Storey County. Consulted 20 Nov 2026.
- Parcel 005-071-46, tax year 2026, Storey County Assessor. Consulted 20 Nov 2026.
- EdgeCore Reno 1, PeeringDB (facility record maintained by EdgeCore Digital Infrastructure). Consulted 20 Nov 2026.