Research record, fact-checked

EdgeCore Reno Data Center Campus

Location
NV, United States. Site address: 3000 USA Parkway, McCarran, NV 89434. See it on the map, in 3D
Stage
Under construction, as of May 2025 (EdgeCore Digital Infrastructure). EdgeCore stated in July 2024 that it was building an on-site substation and three data centers in Reno, and in May 2025 that tradespeople were constructing data centers at its Reno campus with Holder Construction.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
DeveloperEdgeCore Digital Infrastructure
TypeHyperscale, self-builtEdgeCore Digital Infrastructure
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
216 MWIT capacity (power for the computing equipment)Whole campusNovember 2026EdgeCore Digital Infrastructure
More than 400 MW, plannedCapacity, its measure not stated by the sourceWhole campus, 2023 announcement (superseded)August 2023EdgeCore Digital Infrastructure
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Buildings, in all3Whole campusEdgeCore Digital Infrastructure
Floor areaNearly 1,000,000 sq ftWhole campusEdgeCore Digital Infrastructure
Site area56 acresWhole campusEdgeCore Digital Infrastructure
CoolingUltra-efficient close-looped chilled water system, air-cooled design, capable of air-cooled and direct-to-chip liquid coolingWhole campusEdgeCore Digital Infrastructure
WaterWUE rating below .01 L/kWhWhole campusEdgeCore Digital Infrastructure
Substation capacityon-site substation under construction (2024)Whole campusEdgeCore Digital Infrastructure
Buildings under construction3Whole campusStorey County
Floor areaAbout 900,000 sq ftWhole campusStorey County
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
EdgeCore Digital InfrastructureDeveloperEdgeCore Digital Infrastructure
Holder ConstructionGeneral contractorEdgeCore's construction partner at its Reno campus, among four campuses.EdgeCore Digital Infrastructure
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
August 10, 2023 (planned)EdgeCore announces development of the Reno campus after purchasing 136 acresEdgeCore Digital Infrastructure
July 18, 2024EdgeCore states it is constructing an on-site substation and three data centers in Reno, completion expected as early as 2026EdgeCore Digital Infrastructure
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

EdgeCore Digital Infrastructure is building a three-building campus of nearly 1 million square feet and 216 MW of critical IT load on 56 acres in the Tahoe-Reno Industrial Center, Nevada, with an on-site substation. EdgeCore said in July 2024 that the substation and the three data centers were under construction, with completion as early as 2026, and named Holder Construction as its construction partner at the Reno campus in May 2025.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.

Sources

See it on the map. How the map is made.