Helios data center campus

Location
TX, United States. Site address: 984 County Road 112, Afton, Dickens County, TX (Helios I); Phase 2 buildings registered at 1003 FM 193, Afton, TX 79220. See it on the map, in 3D
Stage
Partly in service, partly under construction, as of July 2026 (Galaxy Digital). Galaxy's own announcement confirms Phase I delivered and rent-commenced, while Phase II is described as under construction
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
DeveloperGalaxy Digital
TypeLeased hyperscale campusesGalaxy Digital
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
133 MW, deliveredIT capacity (power for the computing equipment)One phase, Phase Iundefined 2026Galaxy Digital
260 MW, plannedIT capacity (power for the computing equipment)One phase, Phase IIundefined 2026Galaxy Digital
About 200 MWPower capacity of the site or its substationsOne phase, Phase IGalaxy Digital
800 MWPower capacity of the site or its substationsWhole campusGalaxy Digital
526 MWIT capacity (power for the computing equipment)Whole campusGalaxy Digital
1,630 MWPower capacity of the site or its substationsWhole campusGalaxy Digital
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Site areaMore than 2,200 acresWhole campusGalaxy Digital
Generators121phase (Helios I)Texas Commission on Environmental Quality
Floor area of one building199,124 sq ftbuilding (Helios 2)Texas Department of Licensing and Regulation
Floor area of one building349,594 sq ftbuilding (Helios 3)Texas Department of Licensing and Regulation
Floor area of one building349,594 sq ftbuilding (Helios 4)Texas Department of Licensing and Regulation
Stories1building (Helios 2 to 4)Texas Department of Licensing and Regulation
Floor area of one building133,000 sq ftOne phaseClayco
Generators121One phaseTexas Commission on Environmental Quality
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
Galaxy DigitalDeveloperGalaxy Digital
CoreWeaveTenant15-year lease agreement for Phase IGalaxy Digital
Stantec Architecture, Inc.DesignPhase 2 (Helios 2, Helios 3 and Helios 4); Design firm of record in the three state accessibility registrations of Galaxy Helios Phase 2.Texas Department of Licensing and Regulation
Galaxy Helios I LLCowner (Helios I, permittee)Texas Commission on Environmental Quality
Galaxy Helios II LLCowner (Phase 2 buildings)Texas Department of Licensing and Regulation
ClaycoGeneral contractorPhase I, the conversion of the Helios site (133 MW); Design-build delivery of the 133 MW liquid-cooled first phase for CoreWeave.Clayco
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
May 21, 2025Texas Commission on Environmental Quality
March 13, 2026Texas Department of Licensing and Regulation
undefined 2026Phase I of Helios delivered, rent commencement beginsGalaxy Digital
undefined 2027 (planned)Phase II data hall deliveries expected to commence in the first half of 2027Galaxy Digital
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

Helios is Galaxy Digital's data center campus near Afton in Dickens County, West Texas, with CoreWeave as tenant. Phase I, at 984 County Road 112, has 121 generators under a state air permit and was delivered with 133 MW of critical IT load, rent commencing in the second quarter of 2026. Phase 2 is three one-story data center buildings of about 199,000, 350,000 and 350,000 square feet registered at 1003 FM 193 in March 2026 and designed by Stantec, with estimated costs of $900 million, $1.3 billion and $1.3 billion in the state registrations.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.