Research record, fact-checked
Helios data center campus
- Location
- TX, United States. Site address: 984 County Road 112, Afton, Dickens County, TX (Helios I); Phase 2 buildings registered at 1003 FM 193, Afton, TX 79220. See it on the map, in 3D
- Stage
- Partly in service, partly under construction, as of July 2026 (Galaxy Digital). Galaxy's own announcement confirms Phase I delivered and rent-commenced, while Phase II is described as under construction
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Developer | Galaxy Digital | |
| Type | Leased hyperscale campuses | Galaxy Digital |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 133 MW, delivered | IT capacity (power for the computing equipment) | One phase, Phase I | undefined 2026 | Galaxy Digital |
| 260 MW, planned | IT capacity (power for the computing equipment) | One phase, Phase II | undefined 2026 | Galaxy Digital |
| About 200 MW | Power capacity of the site or its substations | One phase, Phase I | Galaxy Digital | |
| 800 MW | Power capacity of the site or its substations | Whole campus | Galaxy Digital | |
| 526 MW | IT capacity (power for the computing equipment) | Whole campus | Galaxy Digital | |
| 1,630 MW | Power capacity of the site or its substations | Whole campus | Galaxy Digital |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Site area | More than 2,200 acres | Whole campus | Galaxy Digital |
| Generators | 121 | phase (Helios I) | Texas Commission on Environmental Quality |
| Floor area of one building | 199,124 sq ft | building (Helios 2) | Texas Department of Licensing and Regulation |
| Floor area of one building | 349,594 sq ft | building (Helios 3) | Texas Department of Licensing and Regulation |
| Floor area of one building | 349,594 sq ft | building (Helios 4) | Texas Department of Licensing and Regulation |
| Stories | 1 | building (Helios 2 to 4) | Texas Department of Licensing and Regulation |
| Floor area of one building | 133,000 sq ft | One phase | Clayco |
| Generators | 121 | One phase | Texas Commission on Environmental Quality |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Galaxy Digital | Developer | Galaxy Digital | |
| CoreWeave | Tenant | 15-year lease agreement for Phase I | Galaxy Digital |
| Stantec Architecture, Inc. | Design | Phase 2 (Helios 2, Helios 3 and Helios 4); Design firm of record in the three state accessibility registrations of Galaxy Helios Phase 2. | Texas Department of Licensing and Regulation |
| Galaxy Helios I LLC | owner (Helios I, permittee) | Texas Commission on Environmental Quality | |
| Galaxy Helios II LLC | owner (Phase 2 buildings) | Texas Department of Licensing and Regulation | |
| Clayco | General contractor | Phase I, the conversion of the Helios site (133 MW); Design-build delivery of the 133 MW liquid-cooled first phase for CoreWeave. | Clayco |
Milestones
| Date | Milestone | Source |
|---|---|---|
| May 21, 2025 | Texas Commission on Environmental Quality | |
| March 13, 2026 | Texas Department of Licensing and Regulation | |
| undefined 2026 | Phase I of Helios delivered, rent commencement begins | Galaxy Digital |
| undefined 2027 (planned) | Phase II data hall deliveries expected to commence in the first half of 2027 | Galaxy Digital |
About the campus
Helios is Galaxy Digital's data center campus near Afton in Dickens County, West Texas, with CoreWeave as tenant. Phase I, at 984 County Road 112, has 121 generators under a state air permit and was delivered with 133 MW of critical IT load, rent commencing in the second quarter of 2026. Phase 2 is three one-story data center buildings of about 199,000, 350,000 and 350,000 square feet registered at 1003 FM 193 in March 2026 and designed by Stantec, with estimated costs of $900 million, $1.3 billion and $1.3 billion in the state registrations.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Galaxy Completes Phase I of Its Helios Data Center Campus, Delivering 133 Megawatts of Critical IT Load to CoreWeave, Galaxy Digital, Jul 2026. Consulted 19 Nov 2026.
- Galaxy Completes Phase I of Its Helios Data Center Campus, Delivering 133 Megawatts of Critical IT Load to CoreWeave, Galaxy Digital, 6 Jul 2026. Consulted 20 Nov 2026.
- TABS Project TABS2026014892, Galaxy Helios Phase 2, Helios 2, Texas Department of Licensing and Regulation, 13 Mar 2026. Consulted 20 Nov 2026.
- Electric Generating Units Air Quality Standard Permit Revision, registration 179090, Galaxy Helios I LLC (letter of May 21, 2025), Texas Commission on Environmental Quality, 21 May 2025. Consulted 20 Nov 2026.
- TABS Project TABS2026014893, Galaxy Helios Phase 2, Helios 3, Texas Department of Licensing and Regulation, 13 Mar 2026. Consulted 20 Nov 2026.
- TABS Project TABS2026014894, Galaxy Helios Phase 2, Helios 4, Texas Department of Licensing and Regulation, 13 Mar 2026. Consulted 20 Nov 2026.
- Galaxy Digital Helios Conversion (project page), Clayco. Consulted 20 Nov 2026.
- Texas Land Parcels FeatureServer, point query at the geocoded TCEQ address 984 County Road 112, Dickens Appraisal District roll via the StratMap statewide parcel layer (copy hosted on ArcGIS Online by a Sam Houston State University account). Consulted 20 Nov 2026.