Research record, fact-checked

Prime DFW01-02, Dallas

Location
Dallas, TX, United States. Site address: 1455 Round Table Dr, Dallas, TX 75247. See it on the map, in 3D
Stage
Under construction, as of November 2026 (Prime Data Centers). Prime Data Centers' own locations page lists DFW01-02's status as Construction
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
DeveloperPrime Data Centers
TypeLeased hyperscale campuses
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
12 MWIT capacity (power for the computing equipment)One buildingNovember 2026Prime Data Centers
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Floor area of one building96,000 sq ftOne buildingPrime Data Centers
Buildings, in all2Whole campusPrime Data Centers
Floor area of one building96,796 sq ftOne buildingTexas Department of Licensing and Regulation
Stories3One buildingTexas Department of Licensing and Regulation
Site area8.44 acresWhole campusPrime Data Centers
Floor area213,000 sq ftWhole campusPrime Data Centers
GeneratorsSite enhancements for four generators and associated switchgear (3 MW buildout)One phaseTexas Department of Licensing and Regulation
CoolingClosed air loop and liquidWhole campusPrime Data Centers
Generatorsfour generators and associated switchgear in the first fit-out phaseOne phaseCity of Dallas (Dallas Open Data)
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
Prime Data CentersDeveloperPrime Data Centers
OncorEnergy partnerPrime Data Centers
AO ArchitectsDesignDFW01-02; Design firm of record for the DFW01-02 core and shell (2024) and its 3 MW buildout (2025)Texas Department of Licensing and Regulation
1515 Roundtable Dr Property, LLCOwnerTexas Department of Licensing and Regulation
Rogers-O'Brien ConstructionGeneral contractorContractor of record on the City of Dallas permits for the core and shell of the building at 1455 Round Table Drive (2024).City of Dallas (Dallas Open Data)
CEC Facilities GroupTrade contractorelectrical; Electrical permit for the core and shell, 2024.City of Dallas (Dallas Open Data)
United MechanicalTrade contractorplumbing; Plumbing permit for the core and shell, 2024.City of Dallas (Dallas Open Data)
Maverick Utility ConstructionTrade contractorplumbing and utilities; Plumbing permit for the core and shell, 2024.City of Dallas (Dallas Open Data)
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
January 19, 2024Texas Department of Licensing and Regulation
January 26, 2024City of Dallas (Dallas Open Data)
December 16, 2025Texas Department of Licensing and Regulation
December 30, 2025City of Dallas (Dallas Open Data)
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

DFW01-02 is the second building of Prime Data Centers' two-building Dallas campus, a 12MW, 96,000 square foot facility listed by the operator as Construction status, powered by Oncor. The full campus has a total of 20MW of critical power.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.

Sources