QScale Q01 campus Building B
- Location
- Levis, QC, Canada. Site address: 2280 Albert-Dion St, Levis, Quebec, G7A 5M9, Canada. See it on the map, in 3D
- Stage
- Under construction, as of June 2026 (QScale). QScale's own announcement states the building's construction is underway
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Owners and developers | QScale, Immobilier QCMW S.E.C. | |
| Type | AI and HPC campuses | QScale |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 60 MW, planned | IT capacity (power for the computing equipment) | One building | June 2026 | QScale |
| 142 MW | Power capacity of the site or its substations | Whole campus | QScale | |
| 114 MW | IT capacity (power for the computing equipment) | Whole campus | QScale |
Investment and financing
An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| C$700 M | Announced investment | One building | June 2026 | QScaleQScale is a Quebec company; the source does not state the currency explicitly, amount reported as published |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Cooling | ultra-dense liquid-cooled deployments alongside traditional air-cooled servers | One building | QScale |
| Floor area | About 930,000 sq ft | Whole campus | QScale |
| Substation capacity | 266 MVA | Whole campus | QScale |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| QScale | Developer | QScale | |
| Immobilier QCMW S.E.C. | Owner | Régie du bâtiment du Québec |
General contractor: Not found in the sources consulted.
Milestones
| Date | Milestone | Source |
|---|---|---|
| June 2026 | QScale states construction of Q01-Building-B is well underway | QScale |
About the campus
QScale is building a second data center, Q01-Building-B, at its Q01 campus in Levis, Quebec, distinct from the already operating Building A. The building will have 60 MW of IT capacity and supports liquid-cooled racks for AI and high-performance computing, including NVIDIA GB300-class systems. QScale describes the build as a $700-million project, and construction was underway as of the company's June 2026 announcement.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- QScale Begins Construction of Its Second Building at the Q01 Campus, Adding 60 MW of AI-Ready Infrastructure in Quebec, QScale, 4 Jun 2026. Consulted 19 Nov 2026.
- Q01 Campus, QScale. Consulted 20 Nov 2026.
- QScale home page, QScale. Consulted 20 Nov 2026.
- Titulaires d'un permis d'utilisation pour des équipements pétroliers à risque élevé, région 12 Chaudière-Appalaches (mise à jour 2026-11-16), page 11, Régie du bâtiment du Québec, 16 Nov 2026. Consulted 20 Nov 2026.
- Q01 Campus, QScale. Consulted 20 Nov 2026.