Microsoft Ginger East (DSM14), West Des Moines
- Location
- West Des Moines, IA, United States. See it on the map, in 3D
- Stage
- Under construction, as of November 2026 (Microsoft). Microsoft's own construction-update page for Ginger East names a general contractor and gives a mid-2028 completion target, framing the project as currently under construction.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Owner | Microsoft | |
| Type | Hyperscale, self-built | Microsoft |
| Amount | Not found in the sources consulted |
Milestones
| Date | Milestone | Source |
|---|---|---|
| 2028 (planned) | Construction anticipated to finish by mid-2028. | Microsoft |
About the campus
Microsoft is building the Ginger East datacenter, also known as DSM14, in greater West Des Moines, Iowa, with Weitz Construction as general contractor and completion anticipated by mid-2028, per Microsoft's own construction update. No MW figure or address was found; this is a distinct project from Ginger West and Project Osmium.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Ginger East datacenter construction update, Microsoft. Consulted 19 Nov 2026.