ARK Clarksville Data Center Campus
- Location
- Clarksville, Johnson County, AR, United States. See it on the map, in 3D
- Stage
- Under construction, as of 2026 (Serverfarm). Serverfarm's own project page states construction is underway on the site.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Developer | Serverfarm | |
| Type | Colocation | Serverfarm |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 108 MW, planned | Capacity, its measure not stated by the source | One building | 2026 | Serverfarm |
| 432 MW, planned | Capacity, its measure not stated by the source | Whole campus | 2026 | Serverfarm |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Buildings, in all | 4 | Whole campus | Serverfarm |
| Floor area of one building | 300,000 sq ft | One building | Serverfarm |
| Stories | 2 | One building | Serverfarm |
| Cooling | null | Whole campus | Serverfarm |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Serverfarm | Developer | Serverfarm | |
| Sitewide | Trade contractor | electrical; Electrical execution, safety and completions management since April 2026 | Sitewide |
General contractor: Not found in the sources consulted.
Milestones
| Date | Milestone | Source |
|---|---|---|
| 2026 | Site preparation construction underway at the Clarksville campus. | Serverfarm |
| October 7, 2026 | Serverfarm |
About the campus
Serverfarm's ARK campus in Clarksville, Arkansas is a planned four building, 432 MW development (ARK1 through ARK4), each building 300,000 square feet across two floors at 108 MW, using a closed loop, air cooled chiller system described as ACC Waterless. Serverfarm's own page states construction is underway to prepare the site, with the first two buildings currently planned for completion by January 2028.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- ARK | Arkansas Data Center | Serverfarm, Serverfarm. Consulted 19 Nov 2026.
- ServerFarm Data Center Case Study, Clarksville, AR, Sitewide. Consulted 20 Nov 2026.
- Building for the Future: Serverfarm Celebrates Clarksville Construction Milestone, Serverfarm, 30 Oct 2026. Consulted 20 Nov 2026.
- PARCEL_POLYGON_CAMP parcel layer, Johnson County, Arkansas GIS Office (County Assessor Mapping Program). Consulted 20 Nov 2026.