Research record, fact-checked

ARK Clarksville Data Center Campus

Location
Clarksville, Johnson County, AR, United States. See it on the map, in 3D
Stage
Under construction, as of 2026 (Serverfarm). Serverfarm's own project page states construction is underway on the site.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
DeveloperServerfarm
TypeColocationServerfarm
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
108 MW, plannedCapacity, its measure not stated by the sourceOne building2026Serverfarm
432 MW, plannedCapacity, its measure not stated by the sourceWhole campus2026Serverfarm
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Buildings, in all4Whole campusServerfarm
Floor area of one building300,000 sq ftOne buildingServerfarm
Stories2One buildingServerfarm
CoolingnullWhole campusServerfarm
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
ServerfarmDeveloperServerfarm
SitewideTrade contractorelectrical; Electrical execution, safety and completions management since April 2026Sitewide
Companies named by the operator, the developer, a filing or a government, each with its role

General contractor: Not found in the sources consulted.

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
2026Site preparation construction underway at the Clarksville campus.Serverfarm
October 7, 2026Serverfarm
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

Serverfarm's ARK campus in Clarksville, Arkansas is a planned four building, 432 MW development (ARK1 through ARK4), each building 300,000 square feet across two floors at 108 MW, using a closed loop, air cooled chiller system described as ACC Waterless. Serverfarm's own page states construction is underway to prepare the site, with the first two buildings currently planned for completion by January 2028.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.

Sources

See it on the map. How the map is made.