CONSTRUCTION INTELLIGENCE / GOLDEN THREAD

A Golden Thread Record That Builds Itself

Send us your project documentation. Mirage builds and maintains the continuous digital record the Building Safety Act requires, every entry traced to its source, ready for a Gateway review at any point.

Would be Mirage's first UK golden-thread deployment, built on the same document-traceability discipline already running at OCBM.

THE REALITY

A golden thread record assembled by hand from scattered folders and email threads is exactly the kind of record the Building Safety Act was written to prevent. By the time a Gateway submission or a regulator request forces the question, the gaps are already there, and they surface at the worst possible moment.

The same traceability discipline extends to NEC4 contract administration, NRM quantity surveying, and CDM compliance , the same underlying record, applied to the other UK-specific requirements a project already has to meet.

WHAT MIRAGE DOES

From scattered documentation to a maintained golden thread

Indexes your project documentation continuously

Design information, construction records, safety cases, and change history are indexed as they're produced, not reconstructed after the fact, building the record the Act requires as the project actually happens.

Traces every change back to its source

Every design decision, approval, and modification is linked to the document and date it came from, so the chain of information the Act calls for is retrievable at any point, not assembled under deadline.

Flags gaps before a Gateway review does

Missing approvals and information that doesn't reconcile between design and as-built records are surfaced as they occur, connecting to the document management and BIM tools already on the project.

THE OUTPUT

Every record, sourced and current

Building ElementDocument TypeLast VerifiedStatus
Fire compartmentation, Level 6-8Design + as-built drawingsRev C, 14 days agoVerified
Structural fire protectionManufacturer cert + install recordRev A, 62 days agoVerified
Means of escape, stair core B↳ Design revision D moved the stair core threshold without a linked approval record. Flagged for the Principal Designer to confirm before this entry is marked verified.Design drawing + change logRev D, 3 days agoChange flagged
External wall systemProduct data + BBA certificateRev B, 41 days agoVerified

PROOF

The traceability discipline your first UK deployment would run on

OCBM

100% of extracted quantities traceable to a source drawing

Dedicated agent cross-checks drawing revisions and tender documents to surface discrepancies as they occur

3 agents in continuous production across a live project portfolio

See the case study

Ready to see your own golden thread record?

Send us a real set of project documents, and we'll show you exactly what a maintained golden thread record looks like.

Attach a building safety case or design document (recommended)

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy

How a deployment runs: Observe, Map, Build, Run, Expand. See the method

Prefer to talk it through first? Book a call

FAQ

Frequently asked questions