CONSTRUCTION INTELLIGENCE / UNITED KINGDOM
AI construction software for UK contractors and commercial teams
Mirage reads drawings, specifications, bills of quantities and tender documents, measures quantities against your rules and runs source-traceable workflows across tendering, revisions, variations and commercial control, inside the systems your teams already use.
A UK project would be Mirage's first there, on the measurement and document agents already in production at OCBM and John Cockerill.
UK commercial teams measure by hand, check the bill against every drawing issue, then keep variations and valuations in step with the scope.
Start with one workflow, then extend it
Most teams start with measurement or tender analysis. Once Mirage knows your drawings, measurement rules and systems, the same project data serves revisions, variations and valuations.
Tendering and measurement
- Measurement to NRM2
- Quantities measured from the drawing set into an NRM2-structured bill, each line tied to its sheet and revision.
- Tender analysis
- Drawings, specification, preliminaries and contract conditions read together: requirements, exclusions and points to clarify listed before submission.
- Subcontract tender comparison
- Subcontractor quotations read in the format they arrive and compared line by line against your scope: exclusions, missing items, quantity differences.
Revisions and project documents
- Drawing revision comparison
- Two issues of a drawing set compared: what was added, removed or changed, and what it does to the measured quantities.
- Specification and drawing checks
- The specification checked against the drawings and the bill, each conflict cited to its clause and sheet.
- Golden thread and CDM records
- The building information the Building Safety Act requires for higher-risk buildings, and the CDM health and safety file, kept current from the project's own documents.
Commercial control
- Variations and compensation events
- Each change tied to the instruction, revised drawing and measured quantities behind it; NEC4 early warnings and compensation events tracked against their time limits.
- Interim valuations
- Applications and subcontractor valuations checked against measured work, the bill and agreed variations, before your team issues a payment or pay less notice.
- Progress reporting
- Site reports and project records turned into structured progress data, without re-keying.
Built around UK practice
- Measurement
- NRM2 for detailed measurement and bills of quantities; NRM1 cost plans and NRM3 maintenance works read the same way once the rule set is confirmed with your team.
- Contracts
- NEC4 and JCT documents read as contracts: clauses, time limits and the records each change needs.
- Changes
- Variations under JCT, compensation events under NEC4, each linked to its instruction, drawing and quantities.
- Payment
- Interim valuations built from measured work and agreed changes; payment and pay less notices stay your team's to issue.
- Safety and records
- The CDM 2015 health and safety file and the golden thread for higher-risk buildings, maintained from the documents the project already produces.
Every quantity can be checked
A quantity that cannot be traced does not go into a bill or a valuation. Mirage keeps the source attached to every result:
- Drawing
- Sheet
- Revision
- Bill item
- Specification clause
- Contract clause
Your quantity surveyors check each result against the original before it reaches a tender, a valuation or a cost system.
Configured to how your company measures
A forward deployed engineer works with your quantity surveyors, estimators and commercial managers to set Mirage up on your own rules:
- Measurement rules
- Trade and cost-code structures
- Document conventions
- Review checklists
- Approval routes
- Exceptions
- Existing systems
Corrections your team makes on one project become rules reused on the next.
The agents a first UK project would run on
Mirage has no UK client yet. These results come from the same measurement and document agents, in production on other markets.
John Cockerill
80-90% reduction in measurement time, from 3-4 days down to a few hours
1 month → a few clicks for a manufacturing bill of materials
3 engineering disciplines running on the same platform
OCBM
100% of extracted quantities traceable to a source drawing
3 agents in production, from measurement through to pricing
Dedicated agent cross-checks drawing revisions to surface discrepancies as they occur
Works with the systems you already use
Your systems stay the record. Mirage reads from them and writes results back; where no standard connector exists, our engineers build it during deployment.
- Autodesk Construction Cloud
- Revit
- Bluebeam
- Procore
- Microsoft SharePoint
- Oracle
- SAP
- Sage
- Internal systems
See your own drawings measured into a bill
Send us a real, active plan set or tender package, and we'll show you exactly what the structured bill and the flagged points look like.
How a deployment runs: Observe, Map, Build, Run, Expand. See the method
Prefer to talk it through first? Book a call
FAQ