FREE TOOLS / CONSTRUCTION

French BTP Labor Cost Calculator

An estimate of what an hour of French construction labor costs the employer: the gross wage, your employer contributions and the paid-leave contribution charged by your caisse (CIBTP), at the rates you enter. Add a crew and a job's hours for a labor budget. It is a pricing estimate, not a payroll calculation.

Your caisse

Each caisse's board sets its own rate, the same for all its members, and it changes over time: there is no national rate. Use the one on your caisse's notice for the period you are pricing. Published examples: Île-de-France 20.20% (rate sheet, April 2026), Grand Est 20.35% (rate sheet, January 2026), Grand Ouest 20.70% (contributions page) and Méditerranée 19.60% (contributions page), as shown in October 2026. Find your caisse on cibtp.fr.

The bad-weather (intempéries) contribution, OPPBTP and trade-body dues listed on your caisse's notice. Their bases differ (the intempéries contribution is charged on capped wages above an annual allowance), so one percentage on gross is an approximation.

Worker

Employer contributions without the caisse: on a recent payslip for the same job, total employer contributions divided by gross pay. There is no single figure to apply: it moves with the wage (the general reduction, RGDU, applies below 3 SMIC), your headcount, the AT/MP rate the Carsat notifies you, versement mobilité and your pension and prévoyance schemes (URSSAF rate table).

Paid hours are the hours you pay on the payslip: worked hours plus public holidays, paid training, travel paid as working time and bad-weather hours that stay at your cost after the caisse's reimbursement. Productive hours are the ones spent producing on site. Do not deduct paid leave: the caisse pays it, and its cost is already in the paid-leave contribution above. Travel and meal allowances are amounts, not hours, and are not in this tool.

One crew hour is every worker above paid for one hour.

Enter your caisse's paid-leave rate, then a wage and an employer contribution rate for each role, to see the estimate.

This rate feeds your pricing. Mirage fills the bill of quantities.

Mirage fills your DPGF or BPU line by line from the quantity takeoff, every price traced to its source. Send us a past tender and we send back a plan, no commitment.

See automated DPGF and BPU (in French)

Prefer to talk it through? Book a call

Document

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy

FAQ

Frequently asked questions

PRICING WORK ON FRENCH PROJECTS?

Mirage fills in DPGF and BPU bid schedules automatically from takeoff data, every quantity traceable to its source.

To turn a cost into a selling price, see the markup and margin calculator. To answer a French tender, see how to respond to a French construction tender.

See Construction Intelligence