Catch clashes before they reach the site.

Mirage's AI agents check your plan set across structure, architecture and MEP, and flag every place the drawings contradict each other, marked on the sheets it comes from.

For general contractors, EPC and MEP teams and heavy civil contractors. Works on PDF and DWG sheets, and IFC where a model exists.

Book a call
Plan setTOWER-B_issue-B.pdf
ABCDE1234B-12W-3Duct 600×400DN100C-014To reviewC-015To reviewM-201Level 2, mechanicalRev B
  • CheckedStructure, architecture and MEP on one grid
  • IssueC-014: duct 600×400 crosses beam B-12 at C/2
RoutedC-014
MEP coordinator
Waiting for review, M-201 and S-201 attached
Illustrative example with synthetic drawings

In production at

  • John Cockerill
  • Flatiron Dragados
  • Demathieu Bard Construction
  • Green Infrastructure Partners
  • Biodéal
  • Transwin
  • OFRET Groupe
  • OCBM
  • Rouandi
  • CarrierWeb
  • Les Moulins Lahlal
  • Mass Céréales Al Maghreb
  • G3C
35+
Deployments in production
5M+
Operational records processed
6
Countries with clients

Company-wide figures, across all Mirage clients: more than 30, in six countries. Six of the twelve companies named on this site are contractors or engineering groups.

01The problem

A coordination error is cheapest on paper.

  • Each discipline draws on its own sheets

    A duct on the mechanical plan and a beam on the structural plan can take the same space, and nobody sees it before installation.

  • Revisions arrive faster than reviews

    A change on one discipline's sheet is not carried to the others, and the conflict appears in the next issue.

  • Review time goes to searching

    Checking one detail means opening five sheets and the specification, set by set, floor by floor.

  • What is found late becomes an RFI or a change order

    Each one costs time on site and margin on the job, and some reach the client.

02How it works

From the issued set to closed issues.

One plan set, followed through the five stages. The agent reads, aligns and checks; a person decides what is a real issue.

TOWER-B / ISSUE BIllustrative example with synthetic drawings. Not a real project.
Sheet M-201, structure S-201 overlaid
ABCDE1234B-12W-3Duct 600×400DN100M-201Level 2, mechanicalRev B
What the agent recordsStage 1 of 5

The plan set arrives

The issued set lands from your document platform or by email: architecture, structure, MEP and the specifications.

  • Issue B, 148 sheetsPDF
  • Architecture, structure, MEP
  • Specifications, 2 volumes
03What it checks

The checks your coordinators do by hand, on every sheet.

Checks are configured per deployment around the ones your team already does. The usual ones:

  • Clashes between disciplines

    Ducts, pipes, cable trays and equipment against beams, columns, slabs and walls.

  • Openings and sleeves

    Penetrations drawn on MEP sheets with no opening on the structural or architectural sheets.

  • Levels and dimensions

    Heights, levels and dimensions that differ between plans, sections and elevations.

  • References and callouts

    Detail, section and sheet references that point to nothing, or to the wrong sheet.

  • Schedules against plans

    Doors, equipment and fixtures listed on a schedule and missing from the plans, or the reverse.

  • Drawings against specifications

    A material, size or product on the drawing that the specification describes differently.

Mirage does not check drawings against building codes.

Every issue arrives with

  • Its location and its sheetsGrid reference, level, and every sheet involved side by side, marked where the conflict is.
  • A severity you setYour rules decide what is critical and what can wait, so a clash on a main beam comes before a missing tag.
  • Its repeats groupedThe same conflict repeated on every floor is reviewed once, not forty times.
  • A path to close-outSent to your project platform, Procore and Autodesk Construction Cloud among them, and checked again on the next revision.
04Who it is for

For the teams who pay when coordination fails.

  • General contractors

    Find coordination issues at tender and preconstruction, while they are still questions and not site problems.

    See general contractors
  • EPC and MEP contractors

    Check your routes against structure and architecture before fabrication, and send each clash to the discipline that owns it.

    See EPC and MEP
  • Heavy civil contractors

    Check the drawings of several designers against each other before work starts on site.

    See heavy civil
05In production

Mirage already reads construction drawings in production.

Clash detection is configured project by project. These are the drawing workflows running today, with their published results.

OCBM

100%of quantities traceable to a source drawing.

Agents for takeoff, pricing, and consistency checks across drawing revisions and tender documents.

See the OCBM case study

John Cockerill

80-90%less time spent on piping takeoff.

Isometric drawings turned into a material take-off in Excel, each line traceable to its drawing. Morocco operations.

See the John Cockerill case study
See all case studies
06Deployment

Built with your team. Deployed on your projects.

Our forward deployed engineers sit with your coordinators. They see how your sets are checked today, configure the agent on your drawings and conventions, then run it in production with your team deciding on each issue.

  1. Observe

    Your team brings
    Time with the people who check the sets today, and a few of your drawing sets.
    What you get
    A system map: who does what, in which tool, with which exceptions
  2. Map

    Your team brings
    Your checks, your conventions and severities, and who decides on each discipline.
    What you get
    The technical architecture: systems read and written, rules, approval points
  3. Build

    Your team brings
    Access to your document and project platforms, through an API or file exchange.
    What you get
    A working agent, on your own data and in your own systems
  4. Run

    Your team brings
    A person per discipline to decide on what the agent routes to them.
    What you get
    The operator interface: review queue, approvals, action history
  5. Expand

    Your team brings
    The next check or the next project you want to hand over.
    What you get
    A production report: volumes, exceptions, corrections, and the next workflow
2Business hours to answer a request
1Week from the first meeting to a proof of concept on your drawings
4-6Weeks to the first workflow in production

Workflows that span several systems can take longer; they are scoped at the first meeting.

See how we deploy
07Questions

Frequently asked questions

Which plan set should we check first?

Tell us about the project and the disciplines involved. We reply within two business hours, then send a written plan: which checks fit your sets, what a deployment involves, and the shortest path to production. No commitment.

Prefer to talk it through? Book a call

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy