French and Spanish construction terms in English

This Mirage Metrics reference maps the documents of a construction tender and contract across France, Morocco, the UK, the US and Spain: a DPGF, a BPU, a DQE, a CCTP or a situation de travaux next to the document that does the same job in English and in Spanish, with a note wherever the match is only approximate.

Published
Reading time
12 min
Written by
Mirage Metrics team

For estimators, quantity surveyors and bid teams who answer tenders in another country, and for anyone reading a French, Moroccan or Spanish file in English. Each row was checked against the official text or the standard form it names, listed under Sources.

How to read these tables

  • An equivalence here is functional: the document that does the same job in the other country. The legal regime behind it is not the same.
  • The UK column gives JCT and NEC4 wording, the two standard form families most UK contracts use. The US column gives AIA document numbers where AIA publishes one.
  • Morocco uses the French vocabulary with documents of its own (the CPS and the BPDE); they are marked as such.
  • When the contract you hold defines a term, its definition wins over this page.

Tender and contract documents

Tender and contract documents, France, UK, US and Spain. Compiled by Mirage Metrics, November 2026.
France (and Morocco)United KingdomUnited StatesSpainNote
DCE (dossier de consultation des entreprises)Tender documents (tender notice and associated tender documents)Bidding documents (AIA A701)Pliegos y documentación complementaria; en obras, también el proyectoThe whole set a bidder receives. "DCE" is trade usage: the French code says "documents de la consultation". Morocco: dossier d'appel d'offres.
RC (règlement de la consultation)Instructions to tenderers (usage)Instructions to bidders (AIA A701)Sin documento propio: criterios en el PCAP y el anuncio de licitaciónHow to bid, the deadline and the award criteria; not part of the signed contract. In Spain the PCAP carries the criteria.
AE (acte d'engagement)Form of tender (usage), then the JCT Agreement (Articles and Contract Particulars)Bid form, then the owner-contractor agreement (AIA A101)Proposición, después el documento de formalización del contratoIn France the AE is the bid that becomes the contract once the owner signs it, and it ranks first among the contract documents (CCAG Travaux, art. 4.1).
CCAP (cahier des clauses administratives particulières)Contract Particulars (JCT); Contract Data (NEC4)Supplementary conditions (to AIA A201)PCAP (pliego de cláusulas administrativas particulares)The project's own commercial terms: deadlines, penalties, retention, price revision. Morocco puts them in the CPS.
CCTP (cahier des clauses techniques particulières)Specification (JCT); Scope (NEC4)Specifications (AIA A201), organised by MasterFormatPliego de prescripciones técnicas particulares (parte del proyecto)What must be built and to which standard. NBS is the usual UK specification system, a product rather than a legal term.
CCAG Travaux (2021)No statutory equivalent: the conditions of a standard form (JCT, NEC4 core clauses)General conditions (AIA A201)LCSP y RGLCAP; pliego de cláusulas administrativas generales de 1970The CCAG is a government text a contract adopts by reference; JCT, NEC and AIA forms are private documents. Morocco: CCAG-T (décret 2-14-394).
DPGF (décomposition du prix global et forfaitaire)Contract Sum Analysis (JCT); activity schedule (NEC4 Option A)Schedule of values (AIA A201, art. 9.2; form G703)Sin equivalente exacto: el tanto alzado es excepcional en obra públicaThe breakdown of a lump-sum price; its quantities are the bidder's own and are not remeasured. A US schedule of values comes after award, a DPGF with the bid. Morocco: décomposition du montant global.
BPU (bordereau des prix unitaires)Schedule of rates (JCT)Unit prices (AIA A101, art. 4.4)Cuadro de precios unitarios (en la práctica, «cuadro de precios n.º 1»)One price per unit of work, with no quantities; payment is the unit price times the quantity carried out. Morocco: bordereau des prix.
DQE (détail quantitatif estimatif)Bill of quantities, measured under NRM2 (remeasured with approximate quantities)Unit-price bid schedule with estimated quantities (usage)Presupuesto con el estado de medicionesEstimated quantities priced at the unit rates, used to compare bids; the works are paid on the quantities carried out. The CCAG says "détail estimatif"; DQE is the acronym of the French public procurement price guide.
Métré, avant-métréMeasurement (NRM2 for building, CESMM4 for civil works); taking-offQuantity takeoff (usage)Mediciones, estado de medicionesTaking quantities from the drawings, before the works (avant-métré) or to record them.
CPS (cahier des prescriptions spéciales), MarocContract Particulars plus specificationSupplementary conditions plus specificationsPCAP más pliego de prescripciones técnicasMorocco puts the administrative and technical clauses of a public contract in one document (décret 2-22-431, art. 16); France splits them into CCAP and CCTP.
BPDE (bordereau des prix, détail estimatif), MarocPriced bill of quantitiesUnit-price bid schedule with estimated quantitiesPresupuesto: mediciones por cuadro de preciosMorocco allows the unit prices and the estimated quantities to form a single document (décret 2-22-431, art. 4).
Tender and contract documents, France, UK, US and Spain. Compiled by Mirage Metrics, November 2026.

DPGF, BPU, DQE: three ways to price

The three French pricing documents answer one question: who carries the quantity risk. With a DPGF, the contract is a lump sum. The bidder measures its own quantities, the breakdown only explains the price, and the total is paid whatever the real quantities turn out to be, changes apart. That is the logic of a UK contract sum analysis or a US schedule of values.

With a BPU and a DQE, the contract is priced by unit. The BPU fixes a price per unit of work; the DQE multiplies those prices by estimated quantities so that bids can be compared; the works are then paid on the quantities actually carried out. That is the logic of a UK bill of quantities on a remeasurement contract, of a US unit-price bid schedule, and of the Spanish cuadro de precios with its mediciones y presupuesto.

Why it matters when you price

A quantity error in a DPGF is the bidder's loss; the same error in a DQE is corrected by remeasurement. Read which one the tender asks for before deciding how much time to spend checking quantities. The NRM2 bill of quantities guide covers the UK measurement rules.

During the works: payment, changes, completion

Payment, changes and completion terms, France, UK, US and Spain. Compiled by Mirage Metrics, November 2026.
France (and Morocco)United KingdomUnited StatesSpainNote
Situation de travaux, projet de décompte mensuelInterim application and valuation, interim certificate (JCT); assessment and certificate (NEC4)Application for payment (AIA G702 with G703)Relación valorada, después certificación de obra mensualThe monthly statement of work done that payment is based on. The CCAG's term is "projet de décompte mensuel"; "situation" is trade usage. Morocco: décompte provisoire.
Décompte général et définitif (DGD)Final account, Final Certificate (JCT)Final application for payment, final certificate for payment (AIA A201)Certificación final, después liquidación del contratoThe closing statement of everything owed. The Spanish liquidación comes after the warranty period; the French DGD before it.
Avenant (modification du marché)Variation (JCT); compensation event (NEC4)Change order (AIA G701)Modificación del contratoAn avenant and a US change order are signed by both parties; a JCT variation or an NEC4 compensation event starts from an instruction and is valued afterwards.
Ordre de service (OS)Instruction (contract administrator under JCT, project manager under NEC4)Construction change directive (AIA G714) for a change without an agreed priceÓrdenes de la dirección facultativa, en el libro de órdenesA French OS covers any notified decision (start date, suspension), not only changes.
Retenue de garantieRetention (JCT; NEC4 Option X16)Retainage (AIA A201)Sin retención legal en obra pública: garantía definitiva del 5 %France caps it at 5%, and at 3% for SMEs working for the State or large local authorities since 2025. Spain asks for a 5% definitive guarantee, which the PCAP may allow to be withheld from payments. Morocco: 10% per payment, capped at 7%.
Réception des travaux, procès-verbal de réceptionPractical completion (JCT); Completion (NEC4)Substantial completion (AIA G704)Recepción de la obra, acta de recepciónThe owner takes the works over and the defects period starts. Morocco has two steps: provisional, then final acceptance.
Garantie de parfait achèvement (un an)Rectification period (JCT); defects date and defect correction period (NEC4)Correction of work within one year (AIA A201)Plazo de garantía (al menos un año en obra pública)The period after completion in which the contractor must put right reported defects. Spanish private building work: one year for finishing defects (LOE). Morocco: 12 months from provisional acceptance.
Mémoire en réclamationContractual claim; notification of a compensation event (NEC4)Claim (AIA A201, art. 15)ReclamaciónThe contractor's reasoned and priced statement of a dispute. France sets its form and time limits (CCAG Travaux, art. 55); the UK has no single statutory form.
Sous-traitance, DC4, paiement directSub-letting with the contract administrator's consent (JCT)Subcontractors proposed to the owner and architect (AIA A201)Subcontratación (LCSP, art. 215 a 217)A declared subcontractor on a French public contract is paid directly by the owner from 600 euros including VAT. Spain allows direct payment only if the tender documents provide it; no UK or US equivalent was found.
Payment, changes and completion terms, France, UK, US and Spain. Compiled by Mirage Metrics, November 2026.

Who does what

The parties to a construction contract, France, UK, US and Spain. Compiled by Mirage Metrics, November 2026.
France (and Morocco)United KingdomUnited StatesSpainNote
Maître d'ouvrageEmployer (JCT); Client (NEC4)OwnerPromotor; órgano de contratación en obra públicaWho commissions and pays for the works.
Maître d'œuvreArchitect or contract administrator (JCT); project manager and supervisor (NEC4)Architect (administers the contract, AIA A201)Dirección facultativa: director de obra y director de ejecuciónIn France the maître d'œuvre usually designs as well as directs the works; NEC4 splits contract administration (project manager) from quality checks (supervisor).
Économiste de la constructionQuantity surveyorCost estimatorSin profesión equivalente únicaA role analogy: the three professions are organised differently. In Spain, mediciones and budgets are a task rather than a protected title.
Bureau d'études techniques (BET)Consulting engineerConsulting engineer, engineering firmIngeniería, oficina técnicaEngineering design and calculations: structure, building services, civil works.
Entreprise titulaire du marchéMain contractorGeneral contractorContratista adjudicatarioThe contractor that signed with the owner.
The parties to a construction contract, France, UK, US and Spain. Compiled by Mirage Metrics, November 2026.

Trade classifications: MasterFormat, NRM2, NF DTU, Spanish chapters

Each country sorts work by trade differently. The US and Canada number specification sections with CSI MasterFormat; UK bills follow the NRM2 work sections; France splits a project into lots whose numbers change from one project to the next, while the technical rules sit in the NF DTU standards; Spanish budgets are organised in chapters set by the price database used (BEDEC, CYPE, the regional databases), with FIEBDC-3 (the BC3 format) as the exchange format. The Spanish column uses CYPE's chapter names as one example. Only the trade names are comparable across all four.

Trades across MasterFormat, NRM2, NF DTU and Spanish budget chapters. Compiled by Mirage Metrics, November 2026.
TradeMasterFormat divisionNRM2 work sectionNF DTU (France)Spanish chapter (CYPE example)
Preliminaries, general requirements01 General Requirements1 Preliminaries—Sin capítulo: gastos generales sobre el PEM
Earthworks31 Earthwork5 Excavating and filling—AD Movimiento de tierras en edificación
Foundations and piling31 Earthwork (piles); 03 Concrete (footings)7 Piling; 8 Underpinning13.1 Fondations superficielles; 13.2 Fondations profondesC Cimentaciones (CS superficiales, CP profundas)
Concrete03 Concrete11 In-situ concrete works21 Exécution des ouvrages en bétonEH Estructuras de hormigón armado
Masonry04 Masonry14 Masonry20.1 Maçonnerie de petits élémentsFE Fábrica estructural; FF Fábrica no estructural
Structural steel05 Metals15 Structural metalwork32.1 Charpentes et ossatures en acierEA Estructuras de acero
Carpentry and timber frame06 Wood, Plastics, and Composites16 Carpentry31.1 Charpente en bois; 31.2 Ossature boisEM Estructuras de madera
Roofing and waterproofing07 Thermal and Moisture Protection17 Sheet roof coverings; 18 Tile and slate; 19 Waterproofing40.x Couverture; 43.x Étanchéité des toituresQ Cubiertas
Windows and doors08 Openings23 Windows, screens and lights; 24 Doors, shutters and hatches36.5 Fenêtres et portes extérieuresL Carpintería, cerrajería, vidrios y protecciones solares
Finishes and plasterboard09 Finishes20 Proprietary walls, linings and partitions; 28 Finishings; 30 Suspended ceilings25.41 Ouvrages en plaques de plâtreR Revestimientos y trasdosados; FB Tabiquería de entramado autoportante
Plumbing22 Plumbing38 Mechanical services; 33 Drainage above ground60.1 Plomberie sanitaireIF Fontanería; IS Evacuación de aguas
Heating, ventilation and air conditioning23 Heating, Ventilating, and Air Conditioning (HVAC)38 Mechanical services65.x Chauffage; 68.3 Ventilation mécaniqueIC Calefacción, refrigeración, climatización y ACS; IV Ventilación
Electrical26 Electrical (27 Communications, 28 Electronic Safety and Security)39 Electrical services70.1 Installations électriques (habitation)IE Instalaciones eléctricas
Drainage and site utilities33 Utilities34 Drainage below ground; 35 Site works60.33 Évacuation PVC; 64.1 Assainissement non collectifAS Red de saneamiento horizontal; U Urbanización interior de la parcela
Trades across MasterFormat, NRM2, NF DTU and Spanish budget chapters. Compiled by Mirage Metrics, November 2026.

False friends

French and Spanish construction words that do not mean what they seem to in English.
WordWhat it means on a construction contract
MarchéA contract, not a market.
DevisA priced quotation, binding once accepted, not a rough estimate.
RéceptionTaking over the works, not a reception.
CautionA guarantee or bond, not a warning.
SituationA monthly payment statement, not a situation.
PlanningThe programme or schedule, not planning in the design sense.
Presupuesto (ES)The priced bill of a project, not only a budget.
Certificación (ES)A monthly payment certificate, not a certification.
Pliego (ES)A set of contract conditions or a specification.
French and Spanish construction words that do not mean what they seem to in English.

Mirage Metrics builds AI agents that read these documents, from plan sets to DPGF, DQE and bills of quantities, and keep every quantity traceable to the drawing it was measured on. See AI construction software for contractors.

Questions readers ask

Questions readers ask

  • A DPGF (décomposition du prix global et forfaitaire) is the breakdown of a lump-sum price. Its closest equivalents are a contract sum analysis or an NEC4 activity schedule in the UK and a schedule of values (AIA G703) in the US. Unlike a bill of quantities, its quantities are not remeasured: the total is the price.

  • The CCTP (cahier des clauses techniques particulières) is the project specification: what must be built and to which standard, trade by trade. In the UK it corresponds to the specification, in the US to the specifications of the project manual, and in Spain to the pliego de prescripciones técnicas particulares.

  • No. A BPU (bordereau des prix unitaires) lists unit prices without quantities, like a UK schedule of rates. The document that adds estimated quantities to those prices is the DQE (détail quantitatif estimatif), which is the closest French equivalent of a bill of quantities.

  • It is the monthly statement of work done on which payment is based: an interim application or valuation under JCT, an assessment under NEC4, a pay application (AIA G702 with G703) in the US, and a certificación de obra in Spain.

  • In Spain the quantities are the mediciones and the priced bill is the presupuesto; a tender often asks for both together as mediciones y presupuesto. The unit prices sit in the cuadro de precios unitarios, which practitioners call the cuadro de precios n.º 1.

  • No. They match documents that do the same job; the legal regime differs by country and by contract. When a contract defines a term, that definition wins over any table, this one included.

Sources and scope

Checked on . Each equivalence was read against the official text or standard form below. Contract forms change: check the edition your contract names.

Related on this site

Talk to a Mirage engineer

Tell us which country and which pricing document your next tender asks for: a DPGF, a DQE, a bill of quantities or mediciones y presupuesto. An engineer replies with a written plan, and a proof of concept on your own documents runs one week after the first meeting.