← Case Studies
Mining

Fuel Consumption Intelligence

Fuel IntelligenceMiningFleet ManagementTelematics
CLIENT PROFILE:Mining and logistics operator managing large vehicle fleets across multiple sites
DEPLOYMENT TIME:8 weeks
SYSTEM:Fuel Intelligence + Telematics Integration
SCOPE:Real-time fuel consumption monitoring and anomaly detection

KEY IMPACT

18% ↓
Fuel variance
Real-time
Anomaly detection
45% ↓
Admin workload
$1.6M+

SYSTEM DEPLOYED

Fuel Intelligence
Real-time fuel consumption monitoring and anomaly detection
Sources
  • Telematics data
  • Fuel logs
  • Route data
Systems Integrated
  • Telematics platforms
  • Fuel management systems
  • Fleet tracking
Deployment Time
8 weeks

SYSTEM ARCHITECTURE

Telematics → Fuel Intelligence → Anomaly Detection
                                     ↘ Variance Alerts → Fleet Managers

THE SITUATION

A mining and logistics operator managing large vehicle fleets across multiple sites struggled to control fuel costs. Fuel consumption data was logged manually or extracted from telematics systems weeks after the fact. Operational teams had no visibility into fuel variances until monthly reports were compiled, making it impossible to address inefficiencies in real-time. Suspected fuel theft and equipment inefficiencies went undetected for months.

DEPLOYMENT

Mirage deployed agents that monitor fuel consumption data, cross-reference against operational activity, and flag anomalies in real-time. Agents detect unusual fuel variances, idle time patterns, and route inefficiencies, alerting fleet managers immediately. Integration with existing telematics and fuel management systems was completed in 8 weeks.

RESULTS

Fuel variance reduction of approximately 18% across the fleet. Idle time and route inefficiencies identified and corrected in real-time rather than months later. Administrative workload for fuel reconciliation fell by approximately 45%. Suspected fuel theft incidents detected and addressed within days instead of months.

YEAR 1 VALUE

Fuel variance reduction$980,000
Operational efficiency gains$760,000
Admin workload reduction$280,000
Total Value$1.6M — $2.4M
← Back to Case Studies