Research record, fact-checked
Aït Ziat dam
- Location
- Al Haouz province, Marrakech-Safi, Morocco. See it on the map, in 3D
- Stage
- Under construction, as of September 2026 (Le360). Le360 reports the dam 100% complete on 19 Sept 2026. No opening is stated.
- Status
- Research record, fact-checked: compiled from the sources below (the owner, the ministry, the companies, the lenders and the press), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, what, how much
| Field | Value | Source |
|---|---|---|
| Owner | Ministry of Equipment and Water | |
| Type | Dams and hydro | |
| Headline amount | MAD 1.9 billion (MAD), as of September 2024 | La Vie éco |
| What it covers | Total project cost. |
The works in figures
Each figure as its source states it, with its scope. Where two sources disagree, both are listed.
| Field | Value | Scope | Source |
|---|---|---|---|
| Height above foundation | 71 m | main dam | La Vie éco |
| Crest length | 752 m | main dam | La Vie éco |
| Reservoir | 186.46 million m3 | project | La Vie éco |
| Reservoir area | 992 ha | normal water level | La Vie éco |
| Catchment area | 522 km2 | project | Le360 |
| Diversion gallery length | 450 m | temporary diversion | La Vie éco |
| Spillway sill length | 60 m | spillway | La Vie éco |
Cost, contracts and financing
A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| MAD 1.94 bn | Budget | project | September 2026 | Le360 |
| MAD 1.9 bn | Total project cost | project | September 2024 | La Vie éco |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Ministry of Equipment and Water | Owner | Figures released by the ministry | Le360 |
| SGTM | General contractor | dam works, 72-month contract | Novec |
| Novec | Designer | execution studies | Novec |
Sgtm is a client of Mirage Metrics. This page describes the project from public sources and says nothing about that work.
Milestones
| Date | Milestone | Source |
|---|---|---|
| September 23, 2024 | 66% progress | La Vie éco |
| October 15, 2025 | About 96% progress; first impoundment expected from December 2025 | Le360 |
| September 19, 2026 | 100% complete (ministry figures) | Le360 |
| 2027 (planned) | Entry into service planned | Le360 |
About the project
An earth dam 71 m high on its foundation with a 752 m crest, on the Oued Ziat in Al Haouz province, built to supply drinking water to Marrakech and irrigate the central Haouz. Its reservoir holds about 186 million m3 over 992 ha. The works were reported 100% complete in September 2026, with entry into service planned in 2027.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.
Sources
- Sept barrages dépassent 80% de réalisation: le point sur les grands réservoirs en chantier, Le360 (press), 19 Sep 2026. Consulted 20 Nov 2026.
- Barrage d'Aït Ziat : Le taux d'avancement des travaux atteint 66%, La Vie éco (press), 23 Sep 2024. Consulted 20 Nov 2026.
- Province d'Al Haouz: le barrage Aït Ziat bientôt opérationnel, Le360 (press), 15 Oct 2025. Consulted 20 Nov 2026.
- Rapport d'activité 2022, Novec (company), 2023. Consulted 23 Nov 2026.
- Sept barrages dépassent 80% de réalisation: le point sur les grands réservoirs en chantier, Le360 (press), 19 Sep 2026. Consulted 23 Nov 2026.