Stage
Under construction, as of September 2026 (Le360). Le360 reports the dam 100% complete on 19 Sept 2026. No opening is stated.
Status
Research record, fact-checked: compiled from the sources below (the owner, the ministry, the companies, the lenders and the press), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, what, how much

Sourced facts of the project
FieldValueSource
OwnerMinistry of Equipment and Water
TypeDams and hydro
Headline amountMAD 1.9 billion (MAD), as of September 2024La Vie éco
What it coversTotal project cost.
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

Physical figures, as their sources describe them
FieldValueScopeSource
Height above foundation71 mmain damLa Vie éco
Crest length752 mmain damLa Vie éco
Reservoir186.46 million m3projectLa Vie éco
Reservoir area992 hanormal water levelLa Vie éco
Catchment area522 km2projectLe360
Diversion gallery length450 mtemporary diversionLa Vie éco
Spillway sill length60 mspillwayLa Vie éco
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

Amounts, each with its kind and scope
AmountWhat it isScopeAs ofSource
MAD 1.94 bnBudgetprojectSeptember 2026Le360
MAD 1.9 bnTotal project costprojectSeptember 2024La Vie éco
Amounts, each with its kind and scope

Companies and their roles

Companies and public bodies named by a source, each with its role
CompanyRoleNoteSource
Ministry of Equipment and WaterOwnerFigures released by the ministryLe360
SGTMGeneral contractordam works, 72-month contractNovec
NovecDesignerexecution studiesNovec
Companies and public bodies named by a source, each with its role

Sgtm is a client of Mirage Metrics. This page describes the project from public sources and says nothing about that work.

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
September 23, 202466% progressLa Vie éco
October 15, 2025About 96% progress; first impoundment expected from December 2025Le360
September 19, 2026100% complete (ministry figures)Le360
2027 (planned)Entry into service plannedLe360
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

An earth dam 71 m high on its foundation with a 752 m crest, on the Oued Ziat in Al Haouz province, built to supply drinking water to Marrakech and irrigate the central Haouz. Its reservoir holds about 186 million m3 over 992 ha. The works were reported 100% complete in September 2026, with entry into service planned in 2027.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.