Fès stadium upgrade (World Cup phase 2)

Location
Fès, Fès-Meknès, Morocco. See it on the map, in 3D
Stage
Under construction, as of October 2026 (LesEco.ma). ANEP's tender committee chose SGTM for lot 1 on 2 October 2026; the stadium was closed for renovation works and the Maghreb de Fès moved its home match to Meknès.
Status
Research record, fact-checked: compiled from the sources below (the owner, the ministry, the companies, the lenders and the press), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, what, how much

Sourced facts of the project
FieldValueSource
OwnerSONARGES (Société Nationale de Réalisation et de Gestion des Équipements Sportifs)
TypeStadiums
Headline amountMAD 1.29 billion (MAD), as of October 2026LesEco.ma
What it coversBudget.
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

Physical figures, as their sources describe them
FieldValueScopeSource
Seats, after the works55,800 seatsafter phase 2SONARGES
Seats, before the works35,000 seatsexistingSONARGES
Training pitches3 pitchescomplexSONARGES
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

Amounts, each with its kind and scope
AmountWhat it isScopeAs ofSource
MAD 2.83 bnContract valuelot 1: demolition, structure, waterproofing, steel frame, finishes (SGTM), incl. taxOctober 2026LesEco.ma
MAD 1.29 bnBudgetlot: high and low current (electrical and digital), 18 monthsOctober 2026LesEco.ma
MAD 228 MBudgetlot: fluids, air conditioning, fire safety, 15 monthsOctober 2026LesEco.ma
Amounts, each with its kind and scope

Companies and their roles

Companies and public bodies named by a source, each with its role
CompanyRoleNoteSource
SONARGES (Société Nationale de Réalisation et de Gestion des Équipements Sportifs)Ownermanages the complexSONARGES
ANEP (Agence Nationale des Équipements Publics)Other roleran the lot 1 tenderLesEco.ma
SGTMContractor, one lotlot 1, MAD 2.825bn incl. tax, 20 months; beat EMB-Inter Tridim (MAD 3.152bn)LesEco.ma
Companies and public bodies named by a source, each with its role

Sgtm is a client of Mirage Metrics. This page describes the project from public sources and says nothing about that work.

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
2007Stadium openedSONARGES
October 2, 2026Lot 1 tender evaluation complete: SGTM chosen (MAD 2.825bn)LesEco.ma
October 21, 2026Two further tenders (MAD 1.52bn) for technical networksLesEco.ma
2028 (planned)Phase 2 to end in 2028 (bid book)SNRT News
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

The second phase of the upgrade of the Fès stadium for the 2030 World Cup removes the athletics track, lowers the pitch, adds a roof over all stands and raises capacity from 35,000 to about 55,800 seats. SGTM won lot 1 (demolition, structure, steel roof frame and finishes) for MAD 2.825 billion in October 2026, with a 20-month schedule. Two further tenders worth MAD 1.52 billion cover electrical and digital networks and fluids, air conditioning and fire safety.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.