Research record, fact-checked
Kenitra-Marrakech high-speed line
- Location
- Kenitra (Sidi Ichou) to Marrakech, Rabat-Salé-Kénitra / Casablanca-Settat / Marrakech-Safi, Morocco. See it on the map, in 3D
- Stage
- Under construction, as of November 11, 2026 (Le360). The Minister of Transport put the line at 30% complete on 25 May 2026; Le360 reported about 35% in November 2026.
- Status
- Research record, fact-checked: compiled from the sources below (the owner, the ministry, the companies, the lenders and the press), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, what, how much
| Field | Value | Source |
|---|---|---|
| Owner | ONCF (Office National des Chemins de Fer) | |
| Type | Rail | |
| Headline amount | MAD 4 billion (MAD), as of April 27, 2025 | Médias24 (interview of Khalid Khairane, ONCF high-speed project director) |
| What it covers | Budget. |
The works in figures
Each figure as its source states it, with its scope. Where two sources disagree, both are listed.
| Field | Value | Scope | Source |
|---|---|---|---|
| Length | 430 km | project | Maroc Hebdo (ONCF communiqué of 24 April 2026) |
| Design speed | 350 km/h | project | Le360 (MAP release) |
| Operating speed | 320 km/h | project | Médias24 |
| Land take | About 3,500 ha | project | Médias24 (interview of Khalid Khairane, ONCF high-speed project director) |
| Earthworks done | Nearly 20,000,000 m3 | project, at 2026-04-24 | Maroc Hebdo (ONCF communiqué of 24 April 2026) |
| Viaducts under construction | 15 | project, at 2026-04-24 | Maroc Hebdo (ONCF communiqué of 24 April 2026) |
| Rail and road bridges under way | 92 | project, at 2026-04-24 | Maroc Hebdo (ONCF communiqué of 24 April 2026) |
Cost, contracts and financing
A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| MAD 53 bn | Budget | project (infrastructure and equipment, excluding rolling stock) | April 24, 2025 | Le360 (MAP release) |
| MAD 96 bn | Investment programme | ONCF programme: LGV 53bn, 168 trains 29bn, network performance 14bn | April 24, 2026 | Maroc Hebdo (ONCF communiqué of 24 April 2026) |
| MAD 4 bn | Budget | land acquisition (included in the 53bn) | April 27, 2025 | Médias24 (interview of Khalid Khairane, ONCF high-speed project director) |
| MAD 40 bn | Loan | share of a MAD 48bn regional financing protocol (regions Casablanca-Settat, Rabat-Salé-Kénitra, Marrakech-Safi, MAD 16bn each, via 25-year bank loans) allocated to the LGV | July 7, 2025 | La Vie éco |
| €205 M | Loan | AfDB, railway infrastructure development support project (PADIF) for the Kenitra-Marrakech corridor | November 20, 2026 | African Development Bank |
| MAD 3.4 bn | Contract value | civil works lot 1, Sidi Ichou-Rabat, 62 km | October 22, 2024 | Challenge.ma |
| MAD 4.5 bn | Contract value | civil works lot 2, Rabat-Agdal-Zenata, 64 km | October 22, 2024 | Challenge.ma |
| MAD 2.15 bn | Contract value | civil works lot 3, Casablanca bypass-Berrechid, 36 km | October 22, 2024 | Challenge.ma |
| MAD 2.4 bn | Contract value | civil works lot 3-bis | November 20, 2024 | La Vie éco |
| MAD 2.83 bn | Contract value | civil works lot 4, Berrechid-Settat, 51 km | October 22, 2024 | Challenge.ma |
| MAD 2.83 bn | Contract value | civil works lot 5, Settat-Benguerir, 36 km | October 22, 2024 | Challenge.ma |
| MAD 2.1 bn | Contract value | civil works lot 6, Benguerir-Marrakech Palmeraie, 60 km | November 21, 2024 | Le Nouvelliste |
| MAD 2 bn | Contract value | civil works lot 7, Marrakech Palmeraie-Marrakech centre | October 22, 2024 | Challenge.ma |
| MAD 1.4 bn | Contract value | Rabat tunnel (3.3 km) | June 28, 2024 | Médias24 |
| €200 M | Contract value | track, catenary and substations, north section, 346 km single track | March 2, 2025 | Railway Gazette International |
| €50 M | Contract value | superstructure and civil works on lines in operation, 112 track-km | March 2, 2025 | Railway Gazette International |
| €29 M | Contract value | track and catenary, Roches-Noires station to Nouaceur technicentre | November 12, 2026 | Yabiladi |
| MAD 444 M | Contract value | structures and road reinstatement, Kenitra-Aïn Attiq section | March 18, 2026 | La Vie éco |
| MAD 563 M | Contract value | stations lot 3: Marrakech-Guéliz station and Marrakech technicentre | July 27, 2026 | La Vie éco |
| MAD 438 M | Contract value | Benguerir Ville Verte LGV station and four RER stations | October 15, 2026 | La Vie éco |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| ONCF (Office National des Chemins de Fer) | Owner | project owner and future operator | Le360 (MAP release) |
| China Railway No.4 Engineering Group (CREC 4) | Contractor, one lot | civil works lot 1, Sidi Ichou-Rabat, 62 km, MAD 3.4bn | Challenge.ma |
| Shandong Hi-Speed Engineering Construction Group | Contractor, one lot | civil works lot 2, Rabat-Agdal-Zenata, 64 km, MAD 4.5bn (4.05bn per Le Nouvelliste) | Challenge.ma |
| GTR (Les Grands Travaux Routiers, Colas subsidiary) | Contractor, one lot | civil works lot 3, Casablanca bypass-Berrechid, MAD 2.15bn / nearly EUR 180m, earthworks and 5 bridges over 40 km, completion end 2027 | Railway PRO (relaying Colas) |
| STAM (Société de Travaux Agricoles Marocains) | Contractor, one lot | civil works lot 3-bis, MAD 2.4bn (estimate MAD 3bn); competitors were CCECC, China Gezhouba Group and SNCE/CAPEP/SEPROB | La Vie éco |
| TGCC | Contractor, one lot | civil works lot 4, Berrechid-Settat, 51 km, MAD 2.83bn; also stations lot 3 (Marrakech-Guéliz station and technicentre, MAD 562.7M) | Challenge.ma |
| CRCC 20 (China Railway 20th Bureau Group) | Contractor, one lot | civil works lot 5, Settat-Benguerir, 36 km (MAD 2.83bn per Challenge, 1.8bn per Le Nouvelliste) | Challenge.ma |
| China Railway Construction Corporation (CRCC) | Contractor, one lot | Oum Er-Rbia bridge, described by Barlamane as the main structure of 'lot 9' (6.23 km, six major bridges) | Barlamane |
| Jet Contractors | Contractor, one lot | civil works lot 6, Benguerir-Marrakech Palmeraie, 60 km, MAD 2.098bn; Grand Stade Hassan II LGV station (MAD 415.5M); Benguerir Ville Verte LGV station and four RER stations (MAD 437.5M) | La Vie éco |
| Mojazine | Contractor, one lot | civil works lot 7, Marrakech Palmeraie-Marrakech centre, MAD 2bn | Challenge.ma |
| SGTM with Sinohydro Bureau 5 | Contractor, one lot | Rabat tunnel, 3,300 m, MAD 1.4bn, 42 months | Médias24 |
| Colas Rail with SETEC | Contractor, one lot | track, catenary and substations north section (EUR 200m) and works on lines in operation (EUR 50m); Colas Rail alone: Roches-Noires to Nouaceur technicentre (about EUR 29m, Nov 2026) | Railway Gazette International |
| Generale Costruzioni Ferroviarie (GCF) | Contractor, one lot | track construction lot 2 (GCF project page), bases at Sidi El Aidi and Benguerir | Generale Costruzioni Ferroviarie |
| NGE Contracting | Contractor, one lot | structures and road reinstatement Kenitra-Aïn Attiq, MAD 443.5M | La Vie éco |
| Urbagec-Separator | Contractor, one lot | stations lot 4: Mohammed V airport LGV station, MAD 394.4M excl. VAT | La Vie éco |
| Sogea Maroc | Contractor, one lot | Casa-Sud LGV station, about MAD 945M | La Vie éco |
| Cogifer France (Vossloh Cogifer) | Supplier | turnouts (appareils de voie) | Médias24 |
| Egis, Systra and Novec | Engineer | project management assistance (AMO) | Médias24 |
| Alstom | Supplier | 18 Avelia Horizon high-speed trainsets (12 firm, 6 optional) | LesEco.ma |
| Regions of Casablanca-Settat, Rabat-Salé-Kénitra and Marrakech-Safi | Lender | MAD 16bn each through long-term loans (Attijariwafa bank 24bn, BCP 8bn, CDG 8bn, Bank of Africa 6bn, Bank Al-Maghrib 2bn per the region's president) | La Vie éco |
| African Development Bank (AfDB) | Lender | EUR 205m PADIF loan for the Kenitra-Marrakech corridor | African Development Bank |
| China Gezhouba Group | Contractor, one lot | civil works lot 9, viaducts over the Ikkem, Cherrat, Nfifikh, Dir and Maleh north and south wadis, MAD 2.32bn | Le360 |
| COVEC | Contractor, one lot | civil works lot 10: earthworks, structures, restoration of communications and fencing on the conventional line in operation at Casablanca, MAD 1.34bn | Le360 |
| SGTM | Contractor, one lot | civil works lot 8, earthworks and structures in the Bouregreg valley, MAD 2bn (separate from the Rabat tunnel SGTM builds with Sinohydro Bureau 5) | H24info |
Sgtm is a client of Mirage Metrics. This page describes the project from public sources and says nothing about that work.
Milestones
| Date | Milestone | Source |
|---|---|---|
| November 2023 | Declaration of public utility published | Médias24 (interview of Khalid Khairane, ONCF high-speed project director) |
| June 28, 2024 | Rabat tunnel awarded to SGTM and Sinohydro Bureau 5 (MAD 1.4bn) | Médias24 |
| July 2024 | Environmental authorisation obtained | Médias24 (interview of Khalid Khairane, ONCF high-speed project director) |
| October 22, 2024 | Seventh and last main civil works lot awarded (Mojazine) | Challenge.ma |
| November 20, 2024 | Civil works lot 3-bis awarded to STAM | La Vie éco |
| January 2025 | Colas Rail-SETEC track, catenary and substation contracts (EUR 250m) and GTR lot 3 | Railway PRO (relaying Colas) |
| April 24, 2025 | King Mohammed VI launches the works at Rabat-Agdal station | Le360 (MAP release) |
| September 24, 2025 | Works on the Casa-Sud, Stade Hassan II and Mohammed V airport stations launched by the King | La Vie éco |
| April 24, 2026 | ONCF: land acquisition complete, 15 viaducts and three covered trenches under construction, 92 bridges under way | Maroc Hebdo (ONCF communiqué of 24 April 2026) |
| May 25, 2026 | 30% complete (Minister of Transport) | La Vie éco |
| November 11, 2026 | About 35% complete (Le360) | Le360 |
| January 2029 (planned) | Start of technical tests | LesEco.ma |
| December 2029 (planned) | Start of commercial service (ONCF project director); other sources give November or September 2029 | Médias24 (interview of Khalid Khairane, ONCF high-speed project director) |
About the project
A 430 km high-speed line that extends the Tangier-Kenitra LGV south to Rabat, Casablanca and Marrakech, built by ONCF for 350 km/h and operation at 320 km/h. It serves the Rabat-Salé and Mohammed V airports and the Grand Stade Hassan II, with a hub at Nouaceur where a Casablanca branch and a direct bypass meet. Works were launched on 24 April 2025 and were about 35% complete in November 2026, with commercial service planned for late 2029. Civil works are split into lots held by Chinese, French and Moroccan contractors, among them CREC 4, Shandong Hi-Speed, GTR, STAM, TGCC, CRCC 20, Jet Contractors, Mojazine and the SGTM-Sinohydro group for the Rabat tunnel.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.
Sources
- Le Roi lance à Rabat les travaux de réalisation de la Ligne à Grande Vitesse Kénitra-Marrakech, Le360 (MAP release) (press), 24 Apr 2025. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : L'ONCF marque une année d'avancées concrètes au service d'une vision stratégique, Maroc Hebdo (ONCF communiqué of 24 April 2026) (press), 24 Apr 2026. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : le projet entre dans une phase d'exécution accélérée, Finances News Hebdo (press), 24 Apr 2026. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : Le taux de réalisation atteint 30%, La Vie éco (press), 25 May 2026. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : un mégaprojet à haute portée stratégique, LesEco.ma (press), 28 Apr 2025. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : un chantier d'envergure lancé, explications sur le tracé et détails du calendrier, Médias24 (interview of Khalid Khairane, ONCF high-speed project director) (press), 27 Apr 2025. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : les travaux d'exécution du tunnel sous Rabat confiés au groupement SGTM et Sinohydro, Médias24 (press), 28 Jun 2024. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : Mojazine décroche le 7ème et dernier lot de génie civil, Challenge.ma (press), 22 Oct 2024. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : STAM décroche le lot 3-bis des travaux de génie civil, Le Nouvelliste (press), 21 Nov 2024. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : Le Marocain STAM décroche un marché à 2,4 milliards de DH, La Vie éco (press), 20 Nov 2024. Consulted 20 Nov 2026.
- Trackwork and power supply contracts agreed as Moroccan high speed network grows, Railway Gazette International (press), 2 Mar 2025. Consulted 20 Nov 2026.
- EUR 430 million contracts for Kenitra, Marrakech HSR awarded, Railway PRO (relaying Colas) (press), 11 Feb 2025. Consulted 20 Nov 2026.
- Colas Rail wins €29 million contract for Morocco's Kénitra-Marrakech high-speed line, Yabiladi (press), 12 Nov 2026. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : NGE décroche 443 MDH pour les ouvrages d'art Kénitra-Ain Atiq, La Vie éco (press), 18 Mar 2026. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : TGCC décroche un marché à 562 MDH, La Vie éco (press), 27 Jul 2026. Consulted 20 Nov 2026.
- Gares LGV et RER Benguerir-Marrakech : Jet Contractors à la manœuvre pour 437 MDH, La Vie éco (press), 15 Oct 2026. Consulted 20 Nov 2026.
- Construction de la ligne à grande vitesse Kénitra-Marrakech Lot 2, Maroc, Generale Costruzioni Ferroviarie (company). Consulted 20 Nov 2026.
- Gare LGV Aéroport Mohammed V : Le groupement Urbagec-Separator décroche le marché pour 394,4 MDH, La Vie éco (press), 15 Jun 2026. Consulted 20 Nov 2026.
- L'exécution du radier du pont de l'oued Oum Er-Rbia ouvre une nouvelle phase des travaux de la ligne à grande vitesse Kénitra-Marrakech, Barlamane (press), 4 Feb 2026. Consulted 20 Nov 2026.
- Contrat avec Alstom, marchés attribués, budget mobilisé : les détails de Rabie Khlie sur la phase II de la LGV, Médias24 (press), 30 Oct 2024. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : L'ONCF engage les travaux de 24 nouvelles gares, La Vie éco (press), 28 Oct 2025. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : un mégaprojet à haute portée stratégique, LesEco.ma (press), 28 Apr 2025. Consulted 20 Nov 2026.
- Infographies. Le parcours détaillé de la LGV Kénitra-Marrakech, Médias24 (Khalid Khairane, ONCF) (press), 28 Apr 2025. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech: Settat, théâtre du plus grand chantier ferroviaire du Maroc, Le360 (press review of Al Ahdath Al Maghribia) (press), 20 Oct 2026. Consulted 20 Nov 2026.
- Khlie fait le point sur la LGV Kénitra-Marrakech et les futures gares nouvelle génération, Médias24 (press), 28 Oct 2025. Consulted 20 Nov 2026.
- Nouvelle ligne à grande vitesse pour Egis : la LGV Kenitra-Marrakech, Egis (company). Consulted 20 Nov 2026.
- Ce que l'on sait du chantier de la nouvelle gare de l'aéroport Mohammed V, Le360 (press), 11 Nov 2026. Consulted 20 Nov 2026.
- Casablanca-Settat valide un financement de 48 MMDH pour la LGV Kénitra-Marrakech et le RER, La Vie éco (press), 8 Jul 2025. Consulted 20 Nov 2026.
- Maroc : plus de 2 milliards d'euros pour bâtir le réseau de transport de demain, African Development Bank (lender), 20 Nov 2026. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech : Le tunnel confié à SGTM et Sinohydro pour 1,4 MMDH, Hespress FR (press), 29 Jun 2024. Consulted 20 Nov 2026.
- LGV Kénitra-Marrakech: le chinois Gezhouba remporte un contrat de 2,32 milliards de dirhams, Le360 (press), 25 Nov 2024. Consulted 23 Nov 2026.
- LGV Kénitra-Marrakech: le chinois Covec remporte un contrat de 1,3 milliard de dirhams, Le360 (press), 14 Nov 2024. Consulted 23 Nov 2026.
- LGV Marrakech-Kénitra: la société marocaine SGTM remporte le 8e et dernier lot, H24info (press), 12 Dec 2024. Consulted 23 Nov 2026.