Laâyoune phosphate port (Phosboucraa)

Location
Laâyoune coast (El Marsa area), Laâyoune-Sakia El Hamra, Morocco. See it on the map, in 3D
Stage
Under construction, as of March 30, 2026 (Le360). Le360 reported in March 2026 that the works on OCP's new phosphate port at Laâyoune had reached 95%.
Status
Research record, fact-checked: compiled from the sources below (the owner, the ministry, the companies, the lenders and the press), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, what, how much

Sourced facts of the project
FieldValueSource
OwnerPhosboucraa (OCP Group)
TypePorts
Headline amountMAD 5.2 billion (MAD), as of July 29, 2024Medi1News (with MAP)
What it coversTotal project cost.
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

Physical figures, as their sources describe them
FieldValueScopeSource
Access bridge3.5 kmaccess bridge to the berthsMedi1News (with MAP)
Access bridge width25 maccess bridgeMedi1News (with MAP)
Caisson breakwater length920 mprotection worksMedi1News (with MAP)
Design ship100,000 tPost-PanamaxMedi1News (with MAP)
Capacity5.2 Mt/yearfirst phase, expandable to 8.2 Mt with a third berthMedi1News (with MAP)
Seawater intake30,000 m3/hwater intakeMedi1News (with MAP)
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

Amounts, each with its kind and scope
AmountWhat it isScopeAs ofSource
MAD 5.2 bnTotal project costprojectJuly 29, 2024Medi1News (with MAP)
MAD 4.2 bnBudgetnew wharf, 2016 announcementFebruary 18, 2016La Vie éco
Amounts, each with its kind and scope

Companies and their roles

Companies and public bodies named by a source, each with its role
CompanyRoleNoteSource
Phosboucraa (OCP Group)OwnerOCP subsidiaryMedi1News (with MAP)
ArchirodonEPC contractorEPC contract since 2019: caisson breakwater, 3.2 km trestle, four post-Panamax berths, 30,000 m3/h seawater intake; USD 460,000,000Archirodon
Companies and public bodies named by a source, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
February 18, 2016OCP announces a new wharf at Laâyoune within its Phosboucraa programmeLa Vie éco
July 29, 2024Works at 85% (MAP)Medi1News (with MAP)
March 30, 2026Works at 95%Le360
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

Phosboucraa, the OCP subsidiary, is building a new phosphate port at Laâyoune to import raw materials for its fertiliser complex and export phosphate, fertilisers and phosphoric acid. A 3.5 km access bridge leads to berths sheltered by a 920 m caisson breakwater, for ships of up to 100,000 tonnes. The total amount is MAD 5.2 billion, and the works were 95% complete in early 2026.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.