Research record, fact-checked

Nador West Med rail link

Location
Nador province, Selouane to Nador West Med port, Oriental, Morocco. See it on the map, in 3D
Stage
Under construction, as of October 2025 (Hespress FR). The minister of Equipment and Water told the House of Representatives in October 2025 that the technical studies were complete and 65% of the priority infrastructure was built, with tenders for four further lots being launched.
Status
Research record, fact-checked: compiled from the sources below (the owner, the ministry, the companies, the lenders and the press), each fact checked against its source on 23 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, what, how much

Sourced facts of the project
FieldValueSource
OwnerONCF (Office National des Chemins de Fer)
TypeRail
AmountNot found in the sources consulted
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

Physical figures, as their sources describe them
FieldValueScopeSource
Length53 kmprojectHespress FR
LengthAbout 40 kmSelouane to port sectionPorts Europe
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

Amounts, each with its kind and scope
AmountWhat it isScopeAs ofSource
MAD 606 MContract valueSelouane to port section (tender estimate)July 2025Ports Europe
MAD 504 MContract valueSelouane to Nador West Med tender of January 2025 (estimate)January 2025L'Opinion
Amounts, each with its kind and scope

Companies and their roles

Companies and public bodies named by a source, each with its role
CompanyRoleNoteSource
ONCF (Office National des Chemins de Fer)Ownerprocuring authorityPorts Europe
Ministry of Equipment and WaterGovernmentprogress reported to Parliament by minister Abdessamad KayouhHespress FR
Companies and public bodies named by a source, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
January 9, 2025ONCF tender for a Selouane-Nador West Med rail section, estimated at MAD 504 millionL'Opinion
July 2025ONCF tender for the Selouane to port section, MAD 606 million, 20 monthsPorts Europe
October 31, 2025Studies 100% complete, 65% of priority infrastructure built, four lots being tenderedHespress FR
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

ONCF is building a 53 km line for freight and passengers to connect the Nador West Med port to the national rail network. The section from Selouane to the port, about 40 km, was tendered in July 2025 for MAD 606 million with a 20-month completion time. In October 2025 the minister said 65% of the priority infrastructure was built and four more lots were being tendered.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.