Noor Atlas Tan-Tan solar plant

Location
Chbika commune, Tan-Tan province, Guelmim-Oued Noun, Morocco. See it on the map, in 3D
Stage
Under construction, as of March 2026 (MASEN). MASEN announced the start of construction of the six plants and the power purchase agreements with ONEE in March 2026. Commissioning is planned from July 2027.
Status
Research record, fact-checked: compiled from the sources below (the owner, the ministry, the companies, the lenders and the press), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, what, how much

Sourced facts of the project
FieldValueSource
OwnerMASEN
TypeEnergy
AmountNot found in the sources consulted
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

Physical figures, as their sources describe them
FieldValueScopeSource
Capacity (AC)29 MW (AC)plant, at delivery pointMASEN (Burgeap, Phenixa, Biotope)
Capacity press40 MWplant share of the 305 MW (press)Morocco World News
Zone areaAbout 201 hasite zoneMASEN (Burgeap, Phenixa, Biotope)
Plant area67 haplant within the zoneMASEN (Burgeap, Phenixa, Biotope)
Solar modules113,400 modulesplant (2023 ESIA design table)MASEN (Burgeap, Phenixa, Biotope)
Grid line length6 kmconnection lineMASEN (Burgeap, Phenixa, Biotope)
Physical figures, as their sources describe them

Companies and their roles

Companies and public bodies named by a source, each with its role
CompanyRoleNoteSource
MASENOwnerdevelops, finances, builds and operates through Noor Atlas Energy Company, its 100% subsidiaryMASEN
ONEEOfftakerpower purchase agreement with MASENMASEN
KfWLenderconcessional loanMASEN
European Investment BankLenderEUR 129m for the programmeEuropean Investment Bank
Bank of AfricaLendercommercial financingMASEN
Companies and public bodies named by a source, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
December 13, 2019EIB finance contract signed (EUR 129m)European Investment Bank
February 2023Environmental and social impact studies of the six sitesMASEN (Burgeap, Phenixa, Biotope)
March 2026MASEN launches construction; PPAs signed with ONEEMASEN
July 2027 (planned)Commissioning of the plants from July 2027Industries.ma
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

A photovoltaic plant of MASEN's Noor Atlas programme near Tan-Tan: 29 MW (AC) at its delivery point in the 2023 impact study, about 40 MW in the 2026 announcements. MASEN builds it through Noor Atlas Energy Company and ONEE buys the power. Construction of the programme started in March 2026; commissioning is planned from July 2027.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.