Oued Lakhdar dam

Location
Commune of Aït Majden, Azilal province, Béni Mellal-Khénifra, Morocco. See it on the map, in 3D
Stage
Under construction, as of September 2026 (Le360). Le360 reports 86% progress on 19 Sept 2026.
Status
Research record, fact-checked: compiled from the sources below (the owner, the ministry, the companies, the lenders and the press), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, what, how much

Sourced facts of the project
FieldValueSource
OwnerMinistry of Equipment and Water
TypeDams and hydro
Headline amountMAD 1.717 billion (MAD), as of September 2026Le360
What it coversBudget.
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

Physical figures, as their sources describe them
FieldValueScopeSource
Height110 mmain dam (RCC)Le360
Saddle dam length1 kmsaddle damLe360
Saddle dam height30 msaddle dam (rockfill)Le360
Reservoir150 million m3projectLe360
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

Amounts, each with its kind and scope
AmountWhat it isScopeAs ofSource
MAD 1.72 bnBudgetprojectSeptember 2026Le360
MAD 1.7 bnBudgetprojectJanuary 2025Le360
Amounts, each with its kind and scope

Companies and their roles

Companies and public bodies named by a source, each with its role
CompanyRoleNoteSource
Ministry of Equipment and WaterOwnerFigures released by the ministryLe360
STAMGeneral contractordam construction; listed by STAM among the three large dams it startedSTAM
Companies and public bodies named by a source, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
October 12, 202436% progressLe360
January 7, 202540% progressLe360
September 19, 202686% progress (ministry figures)Le360
October 2027 (planned)End of works planned in October 2027Le360
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

A roller-compacted concrete dam 110 m high, with a saddle dam over 1 km long and 30 m high, on the Oued Lakhdar in the commune of Aït Majden, Azilal province. Its 150 million m3 reservoir is for drinking water, irrigation downstream, flood protection and the water transfer to Marrakech. The works were 86% complete in September 2026, with completion planned in 2027.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.