Safi new port, OCP extension (phase 2)
- Location
- Safi, south of the city, Marrakech-Safi, Morocco. See it on the map, in 3D
- Stage
- Under construction, as of March 30, 2026 (Le360). Le360 reported in March 2026 that the OCP-led extension of the new port of Safi had reached 65%.
- Status
- Research record, fact-checked: compiled from the sources below (the owner, the ministry, the companies, the lenders and the press), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, what, how much
| Field | Value | Source |
|---|---|---|
| Owners | OCP Group, Ministry of Equipment (Direction des Ports) | |
| Type | Ports | |
| Headline amount | MAD 4.4 billion (MAD), as of April 15, 2019 | Energie & Mines |
| What it covers | Total project cost. |
The works in figures
Each figure as its source states it, with its scope. Where two sources disagree, both are listed.
| Field | Value | Scope | Source |
|---|---|---|---|
| Main breakwater | 2,263 m | phase 1 | Maritime News |
| Secondary breakwater | 777 m | phase 1 | Maritime News |
| Coal berth length | 280 m | phase 1, at -16.50 m | Maritime News |
| Coal import capacity | 7 Mt/year | phase 2 target | Energie & Mines |
Cost, contracts and financing
A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| MAD 4 bn | Budget | phase 1 (State general budget), 2013 technical sheet | April 20, 2013 | Maritime News |
| MAD 4.4 bn | Total project cost | phase 1, 2019 report | April 15, 2019 | Energie & Mines |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| OCP Group | Owner | leads the extension | Le360 |
| Ministry of Equipment (Direction des Ports) | Owner | owner of phase 1 | Maritime News |
| SGTM/STFA grouping | General contractor | phase 1 marine works | Maritime News |
| Artelia / LPEE / CID grouping | Designer | phase 1 design studies; Medocean for geotechnics | Maritime News |
Sgtm is a client of Mirage Metrics. This page describes the project from public sources and says nothing about that work.
Milestones
| Date | Milestone | Source |
|---|---|---|
| April 2013 | Works on phase 1 launched by the King | Energie & Mines |
| March 30, 2026 | OCP extension at 65% | Le360 |
About the project
OCP is extending the new port of Safi, the bulk port the State built south of Safi from 2013 for the Safi coal power plant and the phosphate industry. The second phase is meant to raise coal imports to 7 million tonnes a year and serve OCP's chemical industries. Le360 reported the OCP extension at 65% in March 2026; its cost and layout have not been published.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.
Sources
- Construction, extension et modernisation : comment les ports ont enchaîné les chantiers, Le360 (press), 30 Mar 2026. Consulted 20 Nov 2026.
- Fiche technique du nouveau port de Safi, Maritime News (press), 20 Apr 2013. Consulted 20 Nov 2026.
- Port de Safi, un pôle économique et social en quête de finalisation, Energie & Mines (press), 15 Apr 2019. Consulted 20 Nov 2026.
- Nouveau Port de Safi, Ministère de l'Equipement et de l'Eau (owner). Consulted 20 Nov 2026.