Research record, fact-checked

Stellantis Kenitra plant extension

Location
Kenitra Atlantic Free Zone, Rabat-Salé-Kénitra, Morocco. See it on the map, in 3D
Stage
Opened, as of July 2025 (Automotive World). The extension was inaugurated by the head of government, Aziz Akhannouch, on 17 July 2025.
Status
Research record, fact-checked: compiled from the sources below (the owner, the ministry, the companies, the lenders and the press), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, what, how much

Sourced facts of the project
FieldValueSource
OwnerStellantis
TypeIndustry
Headline amountEUR 1.2 billion (EUR), as of July 2025Automotive World
What it coversAnnounced investment. Not to be read as a construction cost.
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

Physical figures, as their sources describe them
FieldValueScopeSource
Vehicle capacity535,000 vehicles/yearafter extensionAutomotive World
Vehicle capacity before200,000 vehicles/yearbefore extension (2020)electrive.com
Engine capacity350,000 engines/yearafter extensionelectrive.com
Jobs3,100 jobscreated in-house by the extensionAutomotive World
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

Amounts, each with its kind and scope
AmountWhat it isScopeAs ofSource
€1.2 bnAnnounced investmentextensionJuly 2025Automotive World
Amounts, each with its kind and scope

Companies and their roles

Companies and public bodies named by a source, each with its role
CompanyRoleNoteSource
StellantisOwnerplant owner and operatorAutomotive World
Companies and public bodies named by a source, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
May 2025Mild hybrid production beginselectrive.com
July 17, 2025Extension inaugurated by Aziz AkhannouchAutomotive World
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

An extension of Stellantis's vehicle plant in the Kenitra Atlantic Free Zone, which more than doubles its capacity to 535,000 vehicles a year, including small electric vehicles such as the Citroën Ami, Opel Rocks-e and Fiat Topolino, and adds 350,000 engines a year. Stellantis invested an additional EUR 1.2 billion and the head of government inaugurated the extension on 17 July 2025.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.

Sources

See it on the map. How the map is made.