Research record, fact-checked
Stellantis Kenitra plant extension
- Location
- Kenitra Atlantic Free Zone, Rabat-Salé-Kénitra, Morocco. See it on the map, in 3D
- Stage
- Opened, as of July 2025 (Automotive World). The extension was inaugurated by the head of government, Aziz Akhannouch, on 17 July 2025.
- Status
- Research record, fact-checked: compiled from the sources below (the owner, the ministry, the companies, the lenders and the press), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, what, how much
| Field | Value | Source |
|---|---|---|
| Owner | Stellantis | |
| Type | Industry | |
| Headline amount | EUR 1.2 billion (EUR), as of July 2025 | Automotive World |
| What it covers | Announced investment. Not to be read as a construction cost. |
The works in figures
Each figure as its source states it, with its scope. Where two sources disagree, both are listed.
| Field | Value | Scope | Source |
|---|---|---|---|
| Vehicle capacity | 535,000 vehicles/year | after extension | Automotive World |
| Vehicle capacity before | 200,000 vehicles/year | before extension (2020) | electrive.com |
| Engine capacity | 350,000 engines/year | after extension | electrive.com |
| Jobs | 3,100 jobs | created in-house by the extension | Automotive World |
Cost, contracts and financing
A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| €1.2 bn | Announced investment | extension | July 2025 | Automotive World |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Stellantis | Owner | plant owner and operator | Automotive World |
Milestones
| Date | Milestone | Source |
|---|---|---|
| May 2025 | Mild hybrid production begins | electrive.com |
| July 17, 2025 | Extension inaugurated by Aziz Akhannouch | Automotive World |
About the project
An extension of Stellantis's vehicle plant in the Kenitra Atlantic Free Zone, which more than doubles its capacity to 535,000 vehicles a year, including small electric vehicles such as the Citroën Ami, Opel Rocks-e and Fiat Topolino, and adds 350,000 engines a year. Stellantis invested an additional EUR 1.2 billion and the head of government inaugurated the extension on 17 July 2025.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.
Sources
- Stellantis invests €1.2bn in Morocco plant expansion, Automotive World (press), Jul 2025. Consulted 20 Nov 2026.
- Stellantis to expand Moroccan production capacity, electrive.com (press), 21 Jul 2025. Consulted 20 Nov 2026.