18" Side Drain Pipe End Treatment, Class 1 unit price, Alabama

Low bidders on ALDOT contracts carried a median of $1,850.00 per EACH for item 619A101, 18" side drain pipe end treatment, class 1, over the 24 months to 28 AUG 2026, across 29 low bids. Half of all 118 bids fell between $1,453.56 and $2,500.00.

Owner
Alabama DOT
Item
619A101
Unit
EACH
Latest letting
28 AUG 2026
$1,850.00Low bidder's median, per EACH
$1,883.76Median of all bids, per EACH
29Contracts in the window

By year of letting

18" Side Drain Pipe End Treatment, Class 1, ALDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20221010$1,439.8427$1,515.25
20231313$1,850.0044$1,812.06
20241414$1,778.9454$1,749.60
20251414$1,719.6459$1,785.55
202688$2,225.0036$2,200.00
18" Side Drain Pipe End Treatment, Class 1, ALDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By quantity

18" Side Drain Pipe End Treatment, Class 1, ALDOT: low bidder's median by quantity band
Quantity (EACH)Low bidsLow-bid median
1 to 27$2,258.50
2 to 37$2,200.00
3 to 67$2,014.26
6 to 388$1,400.00
18" Side Drain Pipe End Treatment, Class 1, ALDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest ALDOT contracts carrying 18" Side Drain Pipe End Treatment, Class 1
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 AUG 20262026082801104022$2,200.00$2,475.004VULCAN MATERIALS ASPHALT AND CONSTRUCTION,ALDOT
31 JUL 202620260731001030128$2,250.00$1,540.836IKAROS, LLCALDOT
31 JUL 20262026073101704026$3,100.00$2,286.854ALABAMA GRADING & EXCAVATION, LLC.ALDOT
26 JUN 20262026062603509024$1,092.73$1,340.325WIREGRASS CONSTRUCTION COMPANY, INC.ALDOT
29 MAY 20262026052902303012$3,480.27$3,601.574WIREGRASS CONSTRUCTION COMPANY, INC.ALDOT
27 MAR 20262026032702804042$3,350.00$2,788.003APAC-ALABAMA, INC.ALDOT
30 JAN 20262026013000101056$1,400.00$2,206.186ROGERS GROUP, INC.ALDOT
30 JAN 202620260130025010218$1,400.00$1,252.634ROGERS GROUP, INC.ALDOT
26 SEP 20252025092600510032$1,608.00$2,500.003MCINNIS CONSTRUCTION, LLCALDOT
26 SEP 20252025092600610013$1,724.28$2,437.142CARCEL & G. CONSTRUCTION, LLCALDOT
26 SEP 20252025092603305022$1,050.00$1,524.654GFC CONSTRUCTION, INC.ALDOT
29 AUG 20252025082902203012$2,682.39$2,423.166CHILTON CONTRACTORS, INC.ALDOT
25 JUL 202520250725008010333$1,500.00$1,842.664ROGERS GROUP, INC.ALDOT
25 JUL 20252025072501107024$2,014.26$2,100.003WIREGRASS CONSTRUCTION COMPANY, INC.ALDOT
25 JUL 20252025072502402026$1,450.00$1,625.006ROGERS GROUP, INC.ALDOT
Latest ALDOT contracts carrying 18" Side Drain Pipe End Treatment, Class 1

Filter this item by your own quantity, district and period, or check your price against it, in the ALDOT explorer.

How these prices were read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are ALDOT's own: this item is compared with ALDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy