Electronic display sign, & install overhead mount- ac powered, blank out sign, up to sf unit price, Florida

Low bidders on FDOT contracts carried a median of $6,291.80 per AS for item 0700-11391, electronic display sign, & install overhead mount- ac powered, blank out sign, up to sf, from 28 FEB 2018 to 14 JUN 2023, across 46 low bids. Half of all 159 bids fell between $4,937.00 and $8,000.00.

Owner
Florida DOT
Item
0700-11391
Unit
AS
Latest letting
14 JUN 2023
$6,291.80Low bidder's median, per AS
$6,400.00Median of all bids, per AS
46Contracts in the window

By year of letting

Electronic display sign, & install overhead mount- ac powered, blank out sign, up to sf, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
201899$5,070.0045$6,000.00
201955$4,337.8425$4,400.00
202033$5,845.006$5,547.50
202177$6,000.0022$6,000.00
202299$6,732.0028$7,700.00
20231313$7,728.0033$8,093.32
Electronic display sign, & install overhead mount- ac powered, blank out sign, up to sf, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Electronic display sign, & install overhead mount- ac powered, blank out sign, up to sf, FDOT: unit prices by district, all lettings
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 515$6,758.4047$6,758.40
District 18$7,416.6333$8,195.00
District 44$6,000.0024$6,116.58
District 74$5,525.0021$5,013.36
District 211$5,500.0020$6,425.42
Electronic display sign, & install overhead mount- ac powered, blank out sign, up to sf, FDOT: unit prices by district, all lettings

Districts with at least three low bids, over all lettings.

By quantity

Electronic display sign, & install overhead mount- ac powered, blank out sign, up to sf, FDOT: low bidder's median by quantity band
Quantity (AS)Low bidsLow-bid median
1 to 111$5,250.00
1 to 212$7,039.47
2 to 411$7,580.00
5 to 2012$5,922.50
Electronic display sign, & install overhead mount- ac powered, blank out sign, up to sf, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Electronic display sign, & install overhead mount- ac powered, blank out sign, up to sf
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
14 JUN 2023T2906District 21$7,405.92$8,228.962PREFERRED MATERIALS INC.FDOT
14 JUN 2023T5786District 52$5,050.00$5,323.862C.W. ROBERTS CONTRACTING, INC.FDOT
14 JUN 2023T5792District 51$7,500.00$8,611.004P & S PAVING, INC.FDOT
14 JUN 2023T5795District 52$8,903.90$6,729.952HUBBARD CONSTRUCTION COMPANYFDOT
14 JUN 2023T7488District 71$8,093.32$8,602.082AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
24 MAY 2023T5791District 53$8,999.00$10,2002MASCI GENERAL CONTRACTORS, INCFDOT
24 MAY 2023T6548District 61$7,728.00$7,728.003FLORIDA ENGINEERING & DEVELOPMENT CORPFDOT
26 APR 2023T5759District 54$7,580.00$7,580.003CARR CONSTRUCTION, LLCFDOT
26 APR 2023T5787District 54$6,333.60$9,785.354ATLANTIC CIVIL CONSTRUCTORS CORPFDOT
22 FEB 2023T2904District 21$7,044.81$7,484.912HUBBARD CONSTRUCTION COMPANYFDOT
22 FEB 2023T5783District 55$11,000$9,235.002HIGHWAY SAFETY DEVICES, INC.FDOT
25 JAN 2023T1849District 11$8,650.00$8,609.513SUPERIOR ASPHALT, INC.FDOT
25 JAN 2023T5779District 58$8,519.04$7,509.522CHINCHOR ELECTRIC INC.FDOT
07 DEC 2022T5775District 54$5,162.67$6,381.342CHINCHOR ELECTRIC INC.FDOT
05 OCT 2022T5764District 58$6,732.00$7,326.002CARR CONSTRUCTION, LLCFDOT
Latest FDOT contracts carrying Electronic display sign, & install overhead mount- ac powered, blank out sign, up to sf

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy