Existing its maintenance unit price, Florida
Low bidders on FDOT contracts carried a median of $148.80 per DA for item 0102-112, existing its maintenance, over the 24 months to 28 OCT 2026, across 56 low bids. Half of all 327 bids fell between $108.81 and $220.00.
- Owner
- Florida DOT
- Item
- 0102-112
- Unit
- DA
- Latest letting
- 28 OCT 2026
By year of letting
| Year | Contracts | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|---|
| 2023 | 1 | 0 | n/a | 4 | $109.63 |
| 2024 | 6 | 6 | $106.50 | 23 | $100.00 |
| 2025 | 18 | 18 | $153.80 | 96 | $217.70 |
| 2026 | 39 | 38 | $141.86 | 231 | $155.00 |
Bid prices as published, not adjusted for inflation.
By district
| District | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|
| District 7 | 26 | $137.97 | 154 | $150.00 |
| District 4 | 14 | $157.62 | 90 | $164.90 |
| District 5 | 9 | $175.00 | 47 | $200.00 |
| District 1 | 4 | $47.75 | 21 | $97.74 |
Districts with at least three low bids, over the last 24 months.
By quantity
| Quantity (DA) | Low bids | Low-bid median |
|---|---|---|
| 90 to 190 | 14 | $135.94 |
| 220 to 290 | 14 | $161.06 |
| 290 to 600 | 14 | $145.64 |
| 640 to 1,600 | 14 | $143.50 |
The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.
Latest contracts with this item
| Let | Contract | District | Quantity | Low bidder's price | Median | Bids | Low bidder | Source |
|---|---|---|---|---|---|---|---|---|
| 28 OCT 2026 | T1949 | District 1 | 180 | n/a | $100.31 | 2 | OHLA USA INC | FDOT |
| 28 OCT 2026 | T3A25 | District 3 | 325 | $108.33 | $110.00 | 3 | ANDERSON COLUMBIA CO., INC. | FDOT |
| 28 OCT 2026 | T4765 | District 4 | 360 | $160.50 | $160.50 | 5 | GENERAL ASPHALT COMPANY, LLC | FDOT |
| 28 OCT 2026 | T7591 | District 7 | 300 | $181.54 | $185.59 | 5 | PREFERRED MATERIALS INC. | FDOT |
| 28 OCT 2026 | T7616 | District 7 | 150 | $108.00 | $111.50 | 5 | CHINCHOR ELECTRIC INC. | FDOT |
| 30 SEP 2026 | T5893 | District 5 | 230 | $190.00 | $211.75 | 8 | MASCI GENERAL CONTRACTORS, INC | FDOT |
| 30 SEP 2026 | T7622 | District 7 | 90 | $25.00 | $148.00 | 9 | BLACKTIP SERVICES INCORPORATED | FDOT |
| 26 AUG 2026 | T1945 | District 1 | 600 | $64.23 | $186.50 | 5 | PREFERRED MATERIALS INC. | FDOT |
| 26 AUG 2026 | T4757 | District 4 | 510 | $138.69 | $135.74 | 12 | AMERICAN LIGHTING AND SIGNALIZATION, LLC. | FDOT |
| 26 AUG 2026 | T4764 | District 4 | 296 | n/a | $129.03 | 8 | OHLA USA INC | FDOT |
| 26 AUG 2026 | T7613 | District 7 | 190 | $140.00 | $157.58 | 10 | LEON AMERICA CONSTRUCTION | FDOT |
| 29 JUL 2026 | T4745 | District 4 | 242 | $160.23 | $152.30 | 6 | FLORIDA ENGINEERING & DEVELOPMENT CORP | FDOT |
| 29 JUL 2026 | T5889 | District 5 | 110 | $95.00 | $241.75 | 4 | MASCI GENERAL CONTRACTORS, INC | FDOT |
| 29 JUL 2026 | T5891 | District 5 | 290 | $85.00 | $156.58 | 4 | MASCI GENERAL CONTRACTORS, INC | FDOT |
| 29 JUL 2026 | T7599 | District 7 | 220 | $171.00 | $152.25 | 4 | C.W. ROBERTS CONTRACTING, INC. | FDOT |
Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.
How these prices were read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
- Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.