Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop unit price, Florida

Low bidders on FDOT contracts carried a median of $4,457.24 per GM for item 0711-15133, thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop, over the 24 months to 28 OCT 2026, across 17 low bids. Half of all 78 bids fell between $3,642.36 and $7,827.73.

Owner
Florida DOT
Item
0711-15133
Unit
GM
Latest letting
28 OCT 2026
$4,457.24Low bidder's median, per GM
$5,916.07Median of all bids, per GM
17Contracts in the window

By year of letting

Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
201866$3,107.2625$3,000.00
201966$2,424.0023$2,450.59
202088$2,587.7342$2,512.44
202177$2,670.7834$2,655.39
202288$4,031.1830$3,470.00
202377$4,614.8222$4,196.86
202466$5,000.0019$5,000.00
202599$3,870.0045$6,000.00
202677$5,700.0030$5,339.39
Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop, FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 44$3,677.0322$5,121.11
District 54$4,500.0018$3,945.00
District 73$4,457.2413$4,457.24
Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop, FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop, FDOT: low bidder's median by quantity band
Quantity (GM)Low bidsLow-bid median
0.06 to 0.254$4,500.82
0.27 to 0.344$4,722.02
0.39 to 0.674$5,328.62
0.98 to 2.375$3,900.00
Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 OCT 2026T1949District 10.98$2,368.58$5,138.783OHLA USA INCFDOT
28 OCT 2026T5914District 51$11,550$11,5503MASCI GENERAL CONTRACTORS, INCFDOT
26 AUG 2026T1945District 10.25$5,131.63$5,264.125PREFERRED MATERIALS INC.FDOT
20 MAY 2026T4666District 41.01$3,484.07$3,705.828OHLA USA INCFDOT
25 MAR 2026T5877District 50.06$5,700.00$5,700.003MASCI GENERAL CONTRACTORS, INCFDOT
25 FEB 2026T2A58District 20.34$7,900.00$8,500.003PREFERRED MATERIALS INC.FDOT
25 FEB 2026T7583District 70.32$6,144.04$3,638.155PREFERRED MATERIALS INC.FDOT
03 DEC 2025T7559District 70.39$3,400.00$6,386.835WATSON CIVIL CONSTRUCTION, INC.FDOT
24 SEP 2025T2A24District 20.67$6,200.00$6,100.008MASTEC CIVIL LLCFDOT
30 JUL 2025T4736District 40.08$3,200.00$4,260.007PRINCE CONTRACTING, LLC.FDOT
30 JUL 2025T5860District 50.27$3,300.00$3,300.005MASCI GENERAL CONTRACTORS, INCFDOT
11 JUN 2025T5855District 50.31$1,750.00$3,550.007ATLANTIC CIVIL CONSTRUCTORS CORPFDOT
28 MAY 2025T3956District 30.39$8,300.00$8,425.903C.W. ROBERTS CONTRACTING, INC.FDOT
26 MAR 2025T4710District 41.47$6,000.00$6,300.002OHLA USA INCFDOT
29 JAN 2025T3949District 32.37$3,900.00$10,1543C.W. ROBERTS CONTRACTING, INC.FDOT
Latest FDOT contracts carrying Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy